Ir al contenido
Georgia Commons
Menú

Hart County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article II - HIGH-EFFICIENCY PLUMBING FIXTURES

Sec. 18-32. Exemptions.

Sobre este texto

  • As published by Municode, current through 2025-09-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) New construction and the repair or renovation of an existing building shall be exempt from the requirements of sections 18-30 and 18-31

when:

(1) The repair or renovation of the existing building does not include the replacement of the plumbing or sewage system servicing toilets, faucets or showerheads

within such existing buildings;

(2) When such plumbing or sewage system within such existing building, because of its capacity, design, or installation would not function properly if the toilets, faucets or showerheads required by this chapter were installed;

(3) Such system is a well or gravity flow from a spring and is owned privately by an individual for use in such individual's personal residence;

(4) Units to be installed are:

a. Specifically designed for use by the handicapped;

b. Specifically designed to withstand unusual abuse or installation in a penal institution; or

c. Specifically designed as toilets for juveniles.

(5) The owner, or his agent, of a building undergoing new construction or repair or renovation who is entitled to an exemption as specified in subsections (a)(2), (3) or (4) of this section shall obtain the

exemption by applying at the office of the building inspector for the County. A fee as determined by the Board of Commissioners shall be charged for the inspection and issuance of such exemption.

(6) The requirements of section 18-31 do not apply when the planned building or renovation does not add any value greater than $1,500.00 to the value of the existing property. It is not the intent of this article to require a building permit for

routine maintenance or repairs, as long as the routine maintenance or repairs utilize the same or substantially similar replacement materials as used in the existing structure.

(7) No building permit shall be required for the replacement of wiring or paint of the existing structure.

(8) No building permit shall be required for mobile homes or manufactured housing, providing that the same are permitted under other provisions of this Code.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 10-12-2021)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:hart-county/code/18-32@2025-09-23-a4723af894

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Hart County Code of Ordinances, Sec. 18-32. Exemptions | Georgia Commons