Part II - CODE OF ORDINANCES / Chapter 66 - ROADS AND BRIDGES / Article VII - UTILITIES FACILITY INSTALLATION PERMIT
Sec. 66-191. Rights reserved.
Sobre este texto
- As published by Municode, current through 2025-09-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
If the board of commissioners should in the future decide to widen and/or relocate the existing road, the board of commissioners reserves the right to require the utility owner to take up
and re-lay such sections of the facility within the right-of-way as may be necessary from an engineering standpoint due to such widening and/or relocating; the taking up and re-laying to be at the expense of the utility owner. The work shall be completed within 60 working days after notification by the board of commissioners or within such other time as may be approved in writing by the county planning director or designated representative of the board of commissioners.
Historia
(Ord. of 10-27-1998, § 11)