Jasper County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Part B - LAND DEVELOPMENT REGULATIONS / Chapter 115 - TELECOMMUNICATIONS / Article IV - SITING OF WIRELESS TELECOMMUNICATIONS TOWERS AND FACILITIES
Sec. 115-70. Exceptions from a tall structure permit or co-location permit for wireless telecommunications facilities.
Sobre este texto
- As published by Municode, retrieved 2026-11-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) No person shall be permitted to site, place, build, construct, modify or prepare any site for the placement or use of a wireless telecommunications facility as of the effective date of the ordinance from which this article is derived without having first complied with the communications towers and antennas regulations and development standards under the zoning regulations of chapter 119, obtaining a tall structure permit or co-location permit for a wireless telecommunications facility, or obtaining an administratively granted authorization granted under section 115-73, whichever is applicable. Notwithstanding anything to the contrary in this section, no tall structure permit or co-location permit shall be required for those noncommercial exceptions noted in section 115-71, unless deemed in the public interest by the county board of commissioners.
(b) If constructed as required by permit, all legally permitted wireless telecommunications facilities that existed on or before the effective date of the ordinance from which this article is derived shall be allowed to continue as they presently exist; provided, however, that any visible modification of an existing wireless telecommunications facility will require the complete facility, including the tower, if applicable, and any new installation to comply with this article, as will anything changing the structural load.
(c) Any repair and maintenance of a wireless facility does not require an application for a tall structure permit or co-location permit. However, no additional construction or site modification will be permitted.
(d) Notwithstanding any other provisions of this section, the co-location and/or shared use of antennas on existing telecommunication towers or other tall structures or compatible use structures, such as utility poles, water towers, and other towers, shall be exempt from the public hearing requirement otherwise required for a tower, and shall be subject only to an administrative review process by the county board of commissioners and its designee.
Historia
(Ord. of 4-20-2009, § 6)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.