Part II - CODE OF ORDINANCES / Chapter 16 - ENVIRONMENT / Article III - SOIL EROSION AND SEDIMENTATION CONTROL / Division 2 - MINIMUM REQUIREMENTS USING BEST MANAGEMENT PRACTICES
Sec. 16-197. Buffer specifications.
Sobre este texto
- As published by Municode, current through 2024-07-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Except as provided in subsection (c)(3) of this section, there is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director pursuant to O.C.G.A.
§ 12-2-8, or where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or along any ephemeral stream.
(b) As used in this section, the term "ephemeral stream" means a stream that, under normal circumstances, has water flowing only during and for a short duration after precipitation events; has the channel located above the groundwater table yearround; for which groundwater is not a source of water; and for which runoff from precipitation is the primary source of water flow.
(c) Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to the Metropolitan River Protection Act, O.C.G.A. § 12-5-440 et seq., shall remain in force unless a variance is granted by the director as provided in this subsection (c). The following requirements shall apply to any such buffer:
(1) No land-disturbing activities shall be conducted within a buffer, and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed;
provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed;
(2) The buffer shall not apply to the following:
a. Land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream;
cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented;
b. Stream crossings for water lines; or
c. Stream crossings for sewer lines; and
(3) There is established a 50-foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action along the banks of any state waters classified as trout streams pursuant to the Georgia Water Quality Control Act, O.C.G.A. § 12-5-20 et seq., except where a roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the board, so long as any such pipe stops short of the downstream landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams. The director may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements shall apply to such buffer:
a. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all landdisturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
b. The buffer shall not apply to land-disturbing activities for stream crossings for water lines or sewer lines provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and include adequate erosion control measures incorporated into the project plans and specifications and are implemented.
Historia
(Ord. of 10-12-2010(02), § IV(C)(15), (16))