Ir al contenido
Georgia Commons
Menú

Jefferson County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 32 - SOLID WASTE / Article III - LANDFILL MANAGEMENT / Division 2 - ENVIRONMENTAL PROTECTION AND LOCATION STANDARDS AND SPECIFICATIONS

Sec. 32-88. Liners and leachate collection systems.

Sobre este texto

  • As published by Municode, current through 2024-07-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

All landfills shall comply with the liner and leachate collection requirements. New landfill units and lateral expansions shall be constructed with liners and leachate collection systems. The liner and leachate collection system must ensure that the concentration values listed in table 1 will not be exceeded in the uppermost aquifer at the relevant point of compliance. The liner and leachate collection system must be designed and installed under the supervision of a professional engineer registered to practice in the state, who shall certify the installation.

TABLE 1

Chemical MCL* (mg/l) Arsenic 0.05 Barium 1.0 Benzene 0.005 Cadmium 0.01 Carbon tetrachloride 0.005 Chromium (hexavalent) 0.05 2,4-Dichlorophenoxy acetic acid 0.1 1,4-Dichlorobenzene 0.075 1,2-Dichloroethane 0.005 1,1-Dichloroethylene 0.007 Endrin 0.0002 Fluoride 4 Lindane 0.004 Lead 0.05 Mercury 0.002 Chemical MCL* (mg/l) Methoxychlor 0.1 Nitrate 10 Selenium 0.01 Silver 0.05 Toxaphene 0.005 1,1,1-Trichloroethane 0.2 Trichloroethylene 0.005 2,4,5-Trichlorophenoxy acetic acid 0.01 Vinyl chloride 0.002

* Maximum contaminant level

(1) The liner and leachate collection system must, at a minimum, be designed with:

a. A composite liner, as defined in subsection (1) of this section and a leachate collection system that is designed and constructed to maintain less than a 30-centimeter depth of leachate over the liner; and

b. At least a five-foot separation between the synthetic liner and the seasonal high groundwater elevation.

For purposes of this section, the term "composite liner" means a system consisting of two components: The upper component must consist of a minimum 30-mil flexible membrane liner (FML), and the lower component must consist of at least a two-foot layer of compacted soil with a hydraulic conductivity of no more than 1 × 10-7 cm/sec. FML components consisting of high density polyethylene (HDPE) shall be at least 60 mils thick. The FML component must be installed in direct and uniform contact with the compacted soil component.

(2) The relevant point of compliance shall be no more than 150 meters from the waste management unit boundary and shall be located on land owned by the owner of the municipal solid waste landfill (MSWLF) unit. In determining the relevant point of compliance, at least the following factors will be considered:

a. The hydrogeologic characteristics of the facility and surrounding land;

b. The volume and physical and chemical characteristics of the leachate;

c. The quantity, quality, and direction of the flow of the groundwater;

d. The proximity and withdrawal rate of the groundwater users;

e. The availability of alternative drinking water supplies;

f. The existing quality of the groundwater, including other sources of contamination and their cumulative impacts on the groundwater and whether groundwater is currently used or reasonably expected to be used for drinking water;

g. Public health, safety, and welfare effects; and

h. Practicable capability of the owner or operator.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. of 6-14-2005, § III(A))

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:jefferson-county/code/32-88@2024-07-09-0d9c49d01b

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Jefferson County Code of Ordinances, Sec. 32-88. Liners and leachate collection systems | Georgia Commons