Johnson County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 26 - ENVIRONMENT / Article VI - SOIL EROSION AND SEDIMENTATION CONTROL / Division 3 - PERMIT AND PLAN REQUIREMENTS
Sec. 26-225. Data required for site plan.
Sobre este texto
- As published by Municode, current through 2022-02-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The following information shall be required for a site plan:
(1) Narrative or notes, and other information. Notes or narrative to be located on the site plan in general notes or in erosion and sediment control notes.
(2) Description of existing land use at project site and description of proposed project.
(3) Name, address and phone number of the property owner.
(4) Name and phone number of 24-hour local contact that is responsible for erosion and sedimentation controls.
(5) Size of project, or phase under construction, in acres.
(6) Activity schedule showing anticipated starting and completion dates for the project, including the statement in bold letters that "The installation of erosion and sedimentation control measures and practices shall occur prior to or concurrent with land disturbing activities."
(7) Stormwater and sedimentation management systems-storage capacity, hydrologic study, and calculations, including off-site drainage areas.
(8) Vegetative plan for all temporary and permanent vegetative measures, including species, planting dates, and seeding, fertilizer, lime, and mulching rates. The vegetative plan should show options for year round seeding.
(9) Detail drawings for all structural practices. Specifications may follow guidelines set forth in the Manual for Erosion and Sediment Control in Georgia.
(10) Maintenance statement: "Erosion and sedimentation control measures will be maintained at all times." If full implementation of the approved plan does not provide for effective erosion and sediment control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source. Maps, drawings and supportive computations shall bear the signature/seal of a registered or certified professional in engineering, architecture, landscape architecture, land surveying, or erosion and sedimentation control. After December 31, 2006, all persons involved in land development design, review, permitting, construction, monitoring or inspection or any land disturbing activity shall meet the education and training certification requirements as developed by the commission pursuant to O.C.G.A.
§ 12-7-20. The certified plans shall contain:
a. Graphic scale and north point or arrow indicating magnetic north.
b. Vicinity maps showing location of project and existing streets.
c. Boundary line survey.
d. Delineation of disturbed areas within project boundary.
e. Existing and planned contours, with an interval in accordance with the following:
Map Scale Ground Slope Contour Interval (feet) 1 inch = 100 ft. or larger scale Flat 0-2% 0.5 or 1 Rolling 2-8% 1 or 2 (1)Steep 8% + 2, 5 or 10
f. Adjacent areas and feature areas such as streams, lakes, residential areas, etc.
that might be affected should be indicated on the plan.
g. Proposed structures or additions to existing structures and paved areas.
h. Delineate the 25-foot horizontal buffer adjacent to state waters and the specified width in MRPA areas.
i. Delineate the specified horizontal buffer along designated trout streams, where applicable.
j. Location of erosion and sedimentation control measures and practices using coding symbols from the Manual for Erosion and Sediment Control in Georgia, article 6.
Maintenance of all soil erosion and sedimentation control practices, whether temporary or permanent, shall be at all times the responsibility of the property owner.
Historia
(Ord. of 2-9-2003, § V)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.