Johnson County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 53 - SOLAR FARM DEVELOPMENTS / Article II - SOLAR FARMS
Sec. 53-14. Application for permit, fee, and revocation of permit.
Sobre este texto
- As published by Municode, current through 2022-02-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Before commencing operations, all solar farms shall submit an application for a solar farm permit on the form prescribed by the Johnson County Code Enforcement Department and shall provide proof of compliance with all standards for solar farms outlined in this article. No solar farm shall commence operations until it has been inspected by the Johnson County Code Enforcement Office and obtained the permit required by this section.
(b) An application for a solar farm permit shall be accompanied by a comprehensive site plan for the solar farm, which shall include, but not be limited to :
(1) Drawings prepared by a professional engineer licensed to practice in Georgia that clearly illustrate the design of the solar farm;
(2) A project summary;
(3) General procedures for operation and maintenance of the installation;
(4) Measures for maintaining safe access to the installation;
(5) Electrical schematics;
(6) Soil erosion and sediment control;
(7) Landscape plans;
(8) Temporary or permanent roads or driveways;
(9) Grading;
§ 53-14
(10) Vegetation clearing and planting and mitigation or screening with vegetation, structures, or fences;
(11) Exterior lighting and any screening;
(12) Name and address of the applicant or its authorized agent;
(13) Boundaries, exact dimensions and acreage of the tax parcel(s) to be built upon;
(14) Identification of the owners of all adjacent tax parcels;
(15) Location and dimensions of the solar farm;
(16) Existing and proposed locations and dimensions of any utility lines, easements, drainage ways and public or private rights-of-way;
(17) Buildings and the locations of all structures, existing and proposed.
(c) The applicant shall provide additional copies of the comprehensive site plan to the Johnson County Sheriff's Office, Fire Department, and Emergency Management Agency.
The comprehensive site plan must be approved in writing by the Johnson County Code Enforcement Office before a solar farm may receive a permit or commence operations.
(d) An application for a solar farm permit shall be accompanied by a decommissioning and restoration plan, as outlined in section 53-15 below.
(e) At the time of application, each applicant shall pay a non-refundable permit fee in the amount established by the Johnson County Commissioner's Office.
(f) A permit may be revoked by the Johnson County Code Enforcement Office for any solar farm which is not in full compliance with this article. Prior to revoking the permit, the Johnson County Code Enforcement Office shall provide three calendar days' written notice of any deficiencies to the solar farm owner or operator via U.S. Mail, overnight delivery, or hand delivery. If the deficiencies are not corrected within those three days, the Johnson County Code Enforcement Office may revoke the solar farm's permit and require the solar farm to submit a new application before recommencing operations. During the time that a solar farm permit is revoked, the solar farm shall post a sign at each entrance to the solar farm no smaller than one foot by two feet stating: "This solar farm's operations have ceased due to noncompliance with the Johnson County Code of Ordinances. For more information, contact the Johnson County Code Enforcement Office."
Historia
(Ord. of 2-3-2022)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.