Jones County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 58 - ROADS / Article II - DRIVEWAY INSTALLATION POLICY
Sec. 58-35. Permit fees.
Sobre este texto
- As published by Municode, current through 2026-01-16
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
After the location of the new driveway or private roadway has been inspected by the public works director or his designated agent, the owner may obtain an approved driveway permit.
If the public works director or his designated agent determine that a culvert shall not be required for the proposed location, no further charges shall be assessed. If a culvert is required within the county's right-of-way, a fee which includes the cost of materials and labor shall be charged in accordance with the current fee schedule as adopted by the Jones County Board of Commissioners. Once this fee has been paid, the public works department may install the culvert.
Historia
(Ord. No. 200902-1o, 2-3-2009)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.