Ir al contenido
Georgia Commons
Menú

Lamar County · Código de ordenanzas

Lamar County Code of Ordinances

Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.

Sobre este texto

  • As published by Municode, current through 2024-12-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Este texto se leyó por OCR de una página escaneada: una letra, un nombre o un número pueden estar mal leídos.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Parte 4 de 4. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.

(9) Any business or building where illegal activities are habitually and commonly conducted in such a manner as to reasonably suggest that the owner or operator of the business or building was aware of

the illegal activities and failed to reasonably attempt to prevent those activities;

(10) Unused or inoperable appliances, either gas or electric, of any size or type, including, but not limited to, iceboxes, refrigerators, washers, dryers, water heaters, televisions, stereos, or any parts thereof;

(11) Any trees, shrubbery or other plants or parts thereof, which obstruct clear, safe vision on roadways and intersections of the county;

(12) Junked or abandoned motor vehicles as defined in Code § 2-13-41; and

(13) Any other condition constituting a nuisance under state law.

(Ord. No. 04-02, § 1, 6-22-04; Ord. No. 2013-02, § 1, 8-20-13) Sec. 2-13-61. Abatement of nuisances— Magistrate court authority.

The magistrate court shall have full jurisdiction to try and dispose of all questions of nuisance affecting the public health or welfare. Any person

who pleads guilty, nolo contendere or is convicted of violating the provisions of this article shall be punished as provided in section 2-1-11 or such other general law as may be enacted in the future to provide for punishment and penalties that may be imposed by the magistrate courts of the state. In addition to the fine and/or jail sentence, the judge may impose community service and require that the defendant abate or cure the nuisance.

(Ord. No. 04-02, § 1, 6-22-04) Sec. 2-13-62. Complaints of nuisance— Investigation and abatement order.

(a) Any official or inhabitant of the county may direct a complaint of nuisance to the code enforcement officer who shall investigate and may place the complaint on the magistrate court docket for a hearing upon the basis of the investigation. The magistrate court, after a tenday notice to the party involved, shall hold a hearing thereon and upon finding that a nuisance

does exist shall issue an order to the owner, agent in control of or tenant in possession, stating that a nuisance has been found to exist and that the nuisance must be abated within so many hours or days as the court shall deem reasonable, having consideration for the nature of the nuisance and its effect on the public.

(b) Animal control officers, license and building inspectors, and the sheriff's office shall and may also receive complaints, investigate the

same and place on the court docket such complaints in the same manner as the code enforcement officer.

(Ord. No. 04-02, § 1, 6-22-04) Sec. 2-13-63. Abatement by county—Billing for costs.

(a) In any case where the owner, agent or tenant fails to abate the nuisance in the time specified, or where the owner, agent or tenant cannot be served with notice, or where the nature of the nuisance is such, in the opinion of the court that it must be immediately abated, the judge may issue an order to the sheriff directing the nuisance to be abated. The sheriff in such case shall keep record of the expenses and cost of abating same, and the costs shall be billed against the owner, agent or tenant for collection as for county revenues, and these shall become a lien against the property and the same shall be filed of record with the office of the clerk of superior court.

(b) Other county departments shall assist the sheriff as is necessary in abating nuisances hereunder.

(Ord. No. 04-02, § 1, 6-22-04) Sec. 2-13-64. Summary abatement authorized when.

Nothing contained in this chapter [article] shall prevent the board of commissioners from summarily and without notice ordering the abatement of or abating any nuisance that is a nuisance per se in the law or where the case is an

urgent one and the health and safety of the public or a portion thereof is in imminent danger.

(Ord. No. 04-02, § 1, 6-22-04) Secs. 2-13-65—2-13-79. Reserved.

ARTICLE V. CODE ENFORCEMENT

OFFICER*

Sec. 2-13-80. Code enforcement officer created.

There is created the position of Lamar County Code Enforcement Officer. The Code Enforcement Officer shall have only the authority and those duties granted to him by the Lamar County

Board of Commissioners. The code enforcement officer shall report to the county administrator or, in his or her absence, the board of commissioners. The code enforcement officer shall have and enjoy any and all immunities as are now and

hereafter granted to it or authorized by the Lamar County Code, the constitution and laws of this state.

(Ord. No. 2011-05, § 1, 10-18-11) Sec. 2-13-81. Code enforcement officer's authority.

(a) The code enforcement officer shall have the authority to enforce all provisions of the Lamar County Code of Ordinances and all applicable state codes, rules and regulations incorporated therein (hereinafter the Code).

The code enforcement officer shall also have the authority to conduct such investigations as may be reasonably necessary to assure or compel compliance with the provisions of the Code, including accessing property and premises at reasonable times for the purpose of conducting investigations concerning matters regulated by the Code.

(b) No person shall obstruct, hamper or interfere with the code enforcement officer while in the process of executing his official duties.

(Ord. No. 2011-05, § 1, 10-18-11) Sec. 2-13-82. Code enforcement officer's duties.

(a) Duties. The duties of the code enforcement [officer] shall include, but not be limited to, the following:

(1) Enforcing the county's codes and ordinances by responding to complaints issued.

(2) Interpreting codes and ordinances for citizens.

(3) Issuing and serving warnings, notices, and citations for violations of county codes and ordinances.

(4) Conducting investigations of violations, which includes gathering evidence, interviewing witnesses, and preparing final case documentation for presentation in court.

(5) Testifying in court as an expert witness.

(6) Collecting on returned checks written to any department within Lamar County.

(7) Escorting houses that are transported through Lamar County to ensure that proper safety requirements are met.

(8) Performing related work as required.

(9) Discharging such other duties as may be required of him/her by the county administrator, chairman, and the board of commissioners.

(b) Investigations. The code enforcement officer shall promptly investigate complaints of violations of the Code and report his findings and actions to the county administrator and the

board of commissioners. Wherever possible, the code enforcement officer shall use his best efforts to prevent violations or to detect and secure the correction of violations of the Code prior to taking legal action.

(c) Notice and citation. Upon his own investigation, being advised by another county department or by a citizen, or believing that a violation of any section of the Code exists, the code

enforcement officer shall cause a written notice to be directed to the person or persons responsible for such violation and the owner of the property (if different), unless, in the discretion of the code enforcement officer, an emergency is deemed to exist. The notice should include the following:

(1) The person or persons responsible for the violation;

(2) The owner or occupant of the property;

(3) The address or location of the property;

(4) The nature of the violation, including the Code section(s) being violated, and applicable penalties;

(5) A course of action for curing the violation;

(6) A time frame for compliance; and

(7) A date for re-inspection for compliance.

Following the expiration of the time set forth in the notice, the code enforcement officer shall cause a re-inspection to be performed. If the violation has not been remedied, the code enforcement officer shall issue a citation to the owner of the property and/or the responsible party for

prosecution in accordance with the provisions for enforcement under the applicable Code section.

(d) Stop work orders. The code enforcement officer shall order discontinuance of any unlawful use of land, buildings or structures; removal of unlawful buildings or structures, including

unlawful additions, alterations, or structural modifications; discontinuance of any unlawful work being performed; and shall pursue any other action authorized by the Code or the laws of the county or state to ensure compliance with, and prevent violations of, the provisions of the Code.

(e) Should a violation of the Code exist or be discovered, the code enforcement officer may confer with the county attorney who may then, in addition to other remedies provided by law, recommend that the county institute injunction, mandamus or any appropriate action or proceeding to prevent, enjoin, abate or remove such violation. The county attorney may also assist

the code enforcement officer, upon request, to ascertain the owner of property under investigation.

(f) Emergencies. If the code enforcement officer believes that an emergency exists such that imminent harm or peril to life, health, or property is likely or is authorized by the Code, the code enforcement officer shall be authorized immediately to refer these matters, without notice to the owner, to the county attorney's office for immediate action as set forth under the applicable Code section or state law.

(Ord. No. 2011-05, § 1, 10-18-11) Chapter 2-14

PARKS AND RECREATION

ARTICLE I. IN GENERAL

Sec. 2-14-1. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Recreation advisory council or council means the Lamar County Recreation Advisory Council.

Commission means the Lamar County Board of Commissioners.

Commissioner means a member of the Lamar County Board of Commissioners, including the chairman.

(Ord. of 5-2-00, Exh. A) Sec. 2-14-2. Department established.

There is hereby established a Lamar County Recreation Department, with the purpose of establishing, maintaining and managing sports and recreational programs, events and facilities for

the use of all citizens of Lamar County.

(Ord. of 5-2-00, Exh. A) Sec. 2-14-3. Same—Funding; employees.

The recreation department shall be funded and operated by the Board of Commissioners of Lamar County, and its employees and supervisors shall serve at the will of the commission. Funding

for the employees, activities, and facilities shall be as approved by the commissioners pursuant to the county budget. The commission shall be vested with the powers, duties and obligations, necessary for the establishment, maintenance and conduct of a recreation system for all citizens of Lamar County in accordance with the laws of the

state.

(Ord. of 5-2-00, Exh. A) Sec. 2-14-4. City-owned recreation center.

The recreation department is responsible for the care, maintenance, operation and supervision of the recreation center, pursuant to the lease between the commission and the City of Barnesville for same.

(Ord. of 5-2-00, Exh. A) Sec. 2-14-5. Budget; other funding.

Annually, the director of the recreation department shall submit a proposed budget to the commission. In addition to the funds appropriated by the commission, it may accept any grant, device of

real estate, or any gift or bequest of money or other personal property or any donation for use of recreation system. If, however, the acceptance thereof for such purposes will subject the commission to additional expense for improvements, maintenance or renewal, the acceptance of any grant or device of real estate shall be subject to the

approval of the commission. Money received for such purposes, unless otherwise provided by the terms of the gift or bequest, shall be deposited in the funds of the commission. The commission may also charge nominal fees for various activities which may not be included in the original budget request.

(Ord. of 5-2-00, Exh. A) Secs. 2-14-6—2-14-25. Reserved.

ARTICLE II. RECREATION DEPARTMENT

ADVISORY COUNCIL*

Sec. 2-14-26. Establishment; purpose.

An advisory body of five (5) members to be known as the Lamar County Recreation Advisory Council, is established for the purpose of providing input, recommendations and reports to the commission with regards to the recreation programs, systems, and facilities.

(Ord. of 5-2-00, Exh. A; Mo. of 4-17-01) Sec. 2-14-27. Composition.

The members of the council shall be appointed by the commission, with each commissioner (including the chairman of the board of commissioners) responsible for appointing one (1) member.

(Ord. of 5-2-00, Exh. A; Mo. of 4-17-01) Sec. 2-14-28. Appointment, compensation of members.

The first appointments to the council shall be made as soon as practicable upon the adoption of this article; and subsequent appointments shall be made at the first commission meeting of each year following a year in which any commissioner was elected. Members shall serve without pay.

(Ord. of 5-2-00, Exh. A) Sec. 2-14-29. Terms of members.

The term of each member shall be contemporaneous to that of the term of the commissioner who appointed such member. At the first meeting

of the year in which a new or re-elected commissioner takes office, that commissioner shall appoint his or her designee to the council.

(Ord. of 5-2-00, Exh. A; Mo. of 4-17-01) Sec. 2-14-29.1. Right of the chairman or member of county board of commissioners to attend meetings.

The five (5) members of the council shall constitute the advisory council; however, the chairman of the county board of commissioners or a commission member designated by the board shall

be notified of, and have the right to attend meetings. No voting rights shall be extended to the chairman or designated member of the board of

commissioners, but he or she shall be heard on any issues or questions that come before the council.

(Ord. of 5-2-00, Exh. A; Mo. of 4-17-01) Sec. 2-14-30. Organization; adoption of bylaws and regulations.

Immediately after appointment of the first members, the council shall meet and organize by electing one (1) of its members as chairperson and

provide for such other officers as may be necessary. The council shall have the power to adopt bylaws and rules for its conduct.

(Ord. of 5-2-00, Exh. A) Sec. 2-14-31. Duty to provide input and recommendations.

The advisory council shall provide input, reports and recommendations to the board of commissioners at such times as either the council or the commission deems appropriate, on such subjects as the council and the commission deem appropriate, with the purpose of offering constructive advice and counsel with regards to the conduct and supervision of public playgrounds, playfields, indoor recreation centers, and other

recreation facilities owned or controlled by the county and on private properties with consent of the owners. A report including general recommendations shall be offered by the advisory council to the commission at least annually.

(Ord. of 5-2-00, Exh. A) Chapter 2-15

PLANNING AND DEVELOPMENT*

ARTICLE I. IN GENERAL

Sec. 2-15-1. Reserved.

Sec. 2-15-2. Approval of driveway culvert prerequisite to zoning permit.

A zoning permit shall not be issued until the road superintendent approves the driveway culvert for the property.

(Mo. of 1-3-84) Sec. 2-15-3. Comprehensive plan adopted.

The Lamar County Comprehensive Plan was adopted by the board of commissioners, is incorporated as if fully set out herein and is available for inspection in the office of the county clerk.

(Mo. of 4-2-96) Secs. 2-15-4—2-15-30. Reserved.

ARTICLE II. RESERVED*

Secs. 2-15-31—2-15-40. Reserved.

ARTICLE III.

BUTTS-HENRY-LAMAR-SPALDING

COUNTY JOINT DEVELOPMENT

AUTHORITY

Sec. 2-15-41. Inclusion of Lamar County.

It is resolved by the board of commissioners of Butts County, Georgia, the board of commissioners of Henry County, Georgia, the board of commissioners of Lamar County, Georgia, and the board of commissioners of Spalding County, Georgia, that The Butts-Henry-Spalding County Joint Development Authority be amended to include

Lamar County, Georgia, and by this amended and restated Concurrent Resolution, there is hereby continued in effect a body corporate and politic now to be known as The Butts-Henry-LamarSpalding County Joint Development Authority (the "Authority").

(Res. of 10-3-95) Sec. 2-15-42. Purpose.

Each of the boards of commissioners severally finds and declares that there is a need for a joint development authority to function in Butts, Henry, Lamar, and Spalding Counties in order to promote trade, commerce, industry, and employment opportunities; for the public good and the general

welfare; and to promote the general welfare of the state and to reduce unemployment to the greatest extent possible within Butts, Henry, Lamar, and Spalding Counties.

(Res. of 10-3-95) Sec. 2-15-43. Authority.

This article is adopted pursuant to the Development Authorities Law (Chapter 62 of Title 63 of the Official Code of Georgia) as the same was

amended by The General Assembly of Georgia at the 1995 Session thereof and is intended to comply therewith and shall be governed thereby for the purpose of permitting business enterprises in

the four (4) counties to qualify for the tax credits given for each new full-time job created and for all other purposes permitted by said Act.

(Res. of 10-3-95) Sec. 2-15-44. Membership; terms.

(a) The authority shall be governed by a board of directors consisting of three (3) tax paying members to be appointed by the board of commissioners of Butts County, Georgia, from the members of the Butts County Industrial Development Authority, three (3) tax paying members to be

appointed by the board of commissioners of Henry County, Georgia, from the members of the Henry County Development Authority, three (3) tax paying members to be appointed by the board of commissioners of Lamar County, Georgia, from

the members of the Lamar County Development Authority, and three (3) tax paying members to be appointed by the board of commissioners of Spalding County, Georgia, from the members of the Griffin Spalding County Development Authority.

(b) The board of commissioners of Lamar County shall initially appoint one member for the remainder of a one-year term expiring on December 31, 1996, one (1) member for the remainder of a

two-year term expiring on December 31, 1997, and one (1) member for the remainder of threeyear term expiring on December 31, 1998. As each of the terms expire the successor appointee shall

be appointed for a three year term. The members heretofore appointed by Butts County, Henry County and Spalding County shall continue to serve for the terms already appointed with their successors to be appointed for three-year terms each as present terms expire on December 31 of each year. The appointees by each county must be residents of such county, and if a director ceases to be a resident of the county from which appointed, such director shall cease to be eligible for membership and shall be replaced. In addition to

the appointed members, the executive director of each of the four (4) development authorities shall serve as a nonvoting ex officio member.

(Res. of 10-3-95) Sec. 2-15-45. Compensation.

The directors shall receive no compensation for their services, but shall be reimbursed for their actual expenses incurred in the performance of their duties.

(Res. of 10-3-95) Sec. 2-15-46. Appointment of chair and committees.

The board of directors shall elect a chair, a vice-chair, a secretary-treasurer, and such other officers, and the chair shall appoint such committees, as shall be necessary or convenient to carry out the purposes of and to conduct the affairs of

the authority. A majority of the directors shall constitute a quorum, but no action may be taken by the board without the affirmative vote of a majority of the full membership of the board.

(Res. of 10-3-95) Sec. 2-15-47. Meetings.

The board of directors shall meet quarterly on the second Wednesday of January, March, June, and September of each year. The meeting place shall rotate among Butts, Henry, Lamar, and Spalding Counties, pursuant to written notice to be sent by the secretary at least seven (7) days before each meeting. Special meetings may be held at the call of the chair or any three (3) directors upon such reasonable notice as the exigencies of the situation permit.

(Res. of 10-3-95) Sec. 2-15-48. Bylaws and regulations.

(a) The authority may make bylaws and regulations for its governance and may delegate to one

(1) or more of its officers, agents and employees such powers and duties as may be deemed necessary and proper the authority shall have perpetual existence.

(b) The bylaws and the operational business plan of the authority shall be amended to comprehend the entry of Lamar County into this authority. The bylaws and operational business plan may be amended at any regular or called meeting

of the authority by a majority of all the directors, provided, that written notice of the proposed amendment shall have been furnished to each director at least two (2) weeks in advance of the meeting where the change is to be considered.

(Res. of 10-3-95) Sec. 2-15-49. Amendments.

This resolution may be amended at any time by concurrent resolution of the boards of commissioners of Butts, Henry, Lamar and Spalding Counties, Georgia.

(Res. of 10-3-95) Chapter 2-16

ROADS AND BRIDGES*

ARTICLE I. IN GENERAL

Sec. 2-16-1. Specifications for roads county will accept.

(a) The county will not accept deeds to roads unless they comply with this section.

(b) The right-of-way shall be at least eighty

(80) feet wide. The finished road shall be at least twenty-eight (28) feet wide. The paving shall be at least twenty-four (24) feet wide. There shall be shoulders on each side of the road. Each shoulder shall be at least five (5) feet wide. The completed base shall be at least six (6) inches.

(c) Cut sections shall have a front slope of three (3) to one (1), a back slope of a minimum of one (1) to one (1). The ditch shall be at least two

(2) feet deep.

(d) Fill sections shall comply with the follow- ing:

(1) Sections of one (1) foot to five (5) feet require a three (3) to one (1) slope;

(2) Sections of five (5) feet or more require a two (2) to one (1) slope.

(e) The pipe cover (c.d.) shall be at least one

(1) foot. All pipe shall be staked to meet slopes both in full and cut sections according to depart- ment of transportation standards.

(f) The pipe cover (s.d.) shall be at least six (6) inches before placing the base.

(g) All cross drains shall have tail ditches if required. When grading from a cut section to a fill section the water is to be diverted from the fill section. Cross drains shall have a channel excavation if required. All pipe shall have a fall.

(h) Clearing and grubbing shall meet depart- ment of transportation specifications.

Gi) Grading shall meet department of transportation specifications.

G) Drainage shall meet department of transportation specifications.

(k) The base shall be of top soil or equivalent, and shall meet department of transportation specifications Class "A" or "B". Before surface treatment the base shall have one hundred (100) § 2-16-2 percent compaction and a one and one-half-inch crown. The base shall have single surface treat- ment with liquid.

(1) The seal shall comply with the following:

(1) The prime shall meet all specifications of the department of transportation.

(2) Asphalt shall meet all specifications of the department of transportation.

(3) Stone #5, 7 and 89 shall be used and meet all specifications of the department of transportation.

(4) Triple surface treatment cut back asphalt shall meet all specifications and applica- tions of the department of transporta- tion.

(5) Stone #5, 7 and 89 shall be used and meet all specifications of the department of transportation.

(m) All side line and center line striping will be completed. The striping requirement shall be the same as the department of transportation.

(n) All shoulders and front slopes shall be grassed. Stand requirement shall be the same as the department of transportation.

(0) Loose sod shall be placed on side drain pipe in accordance with department of transporta- tion standards and specifications.

(p) Ditch checks shall be placed to meet depart- ment of transportation standards and specifica- tions.

(q) The streets and roads shall be inspected by a qualified person, who will give the board of commissioners a letter stating that all materials, applications, tests and requirements meet the department of transportation specifications. One

(1) year of maintenance is required.

(Mo. of 1-2-74; Mo. of 7-16-02; Res. of 11-11-03) Sec. 2-16-2. Order of paving or tar and gravel of any roads.

Prior to the paving or tar and gravel of any roads in Lamar County that the order of which they are to be paved or tar and graveled [is] to be set and approved by the board of commissioners.

(Mo. of 8-15-93) Sec. 2-16-3. Utility locations in rights-ofway.

(a) Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

(1) As-built plans: Detailed construction plans showing completed improvements as constructed.

(2) Utility: All privately, publicly, or cooperatively owned systems for producing, transmitting, or distributing communication, data, information, telecommunication, cable television,

power, electricity, light, heat, gas, oil, crude products, water/sewer, steam, fire and police signals, traffic control devices, and street lighting systems, and housing or conduit for any of the foregoing, which directly or indirectly serve the public or any part thereof. The term utility may also be used to refer to the owner, operator, provider, servicer, or any agent thereof, of any above-described utility or utility

facility.

(b) All utilities locating their facilities in new residential and commercial developments, along county rights-of-way, and along any private road shall locate their lines pursuant to the county's development standards and specifications, as amended. In the event that the county's development standards conflict with the state department of transportation's (D.O.T.) Utility Accommodation Policy and Standards, the

County's development standards shall prevail, so long as they are not more restrictive than those of the D.O.T.

(c) Upon completion of the installation of its lines and improvements, the utility shall provide the county with as-built plans showing the exact location of the lines and improvements.

(d) In the event that the county expands a right-of-way upon which a utility line or improvement has been located, and it is necessary to relocate said line or improvement, in the sole

discretion of the county, the utility shall relocate its lines and improvements at its expense.

(Ord. No. 2017-03, § 1, 8-15-17) Sec. 2-16-4. Utility accommodations in rights-of-way.

(a) Adopted. The 2016 Utility Accommodation Policy and Standards manual, including all references contained therein to codes, rules, regulations, schedules, forms and appendix items, except Appendix B (Permit Forms and Supporting Documents), promulgated by the State of Georgia Department of Transportation (D.O.T.), as

amended from time to time, is adopted by reference and incorporated in this section as if fully set forth herein, subject to all amendments and

modifications contained in this section. A copy of the manual shall be maintained at the offices of the director of the Lamar County Public Works Department or his designee and open for public inspection.

(b) Amendments. The 2016 Utility Accommodation Policy and Standards manual promulgated by the D.O.T., as amended from time to time,

adopted in Subsection (a), is amended in order to equate state definitions and provisions with their appropriate and equivalent county counterparts, such that a policy shall be implemented to reflect the intent and effect of the state right-of-way policy as it would logically apply to the unincorporated county's rights-ofway, including but not limited to the following:

(1) Substitutions.

Commissioner: Lamar County Administrator.

Department: Lamar County Public Works Department.

Engineer: The Director of the Lamar County Public Works Department or his/ her designee.

Highway, street or road: Any road that is part of the county road system.

State: County.

State bridge and structural design engineer: The Director of the Lamar County Public Works Department or his/ her designee.

State highway (chief) engineer: The Director of the Lamar County Public Works Department or his/her designee.

State utilities engineer: The Director of the Lamar County Public Works Department or his/her designee.

Utility (as defined in the state's policy) shall read:

Utility: All privately, publicly, or cooperatively owned systems for producing, transmitting, or distributing communication, data, information, telecommunication, cable television, power, electricity, light,

heat, gas, oil, crude products, water/ sewer, steam, fire and police signals, traffic control devices, and street lighting systems, and housing or conduit for any of the foregoing, which directly or indirectly serve the public or any part thereof. The term utility may also be used to refer to the owner, operator, provider, servicer, or any agent thereof, of any above-described utility or utility facility.

(2) Administration. The director of the Lamar County Public Works Department shall have the authority to administer the state department of transportation's utility accommodation policy and standards, as amended from time to time by the

state or county, on county roads in the unincorporated county and in accordance with any procedures the Board of Commissioners or the Lamar County Public Works Department may establish

thereunder.

(3) Fees. The board of commissioners shall be authorized to charge fees in accordance with the state department of transportation's utility accommodations policy and standards and any other applicable laws that exist now or may be enacted in the future. Fees shall be determined by the director of the Lamar County Public Works Department and subject to the approval of, and publicly disclosed by, the board of commissioners.

Any fee schedule shall be posted at the offices of the Lamar County Public Works Department.

(Ord. No. 2017-04, § 1, 8-15-17) Secs. 2-16-5—2-16-22. Reserved.

ARTICLE II. INTERSTATE SIGNS*

Sec. 2-16-23. Scope.

This article shall apply to all outdoor advertising signs abutting or visible from the Interstate 75 right-of-way in the county.

(Res. of 3-9-82, § I(1)) Sec. 2-16-24. Compliance.

(a) No sign shall be erected or maintained unless it is in compliance with this article.

(b) All signs located on sites abutting or visible from the Interstate 75 right-of-way shall conform with Georgia Code Annotated section 32-6-70, et seq. (The Georgia Outdoor Advertising Code) and shall meet all federal and state requirements necessary to obtain a permit from

the Georgia Department of Transportation under said code. In instances where the sign controls of this article are more strict, the regulations of this article shall apply.

(Res. of 3-9-82, § I(2), (4)) Sec. 2-16-25. Nonconforming signs.

Any legally erected sign which would become nonconforming as a result of this article will be allowed to remain until purchased by the state department of transportation provided that the sign meets the requirements of state laws and rules and regulations governing such signs.

(Res. of 3-9-82, § III(10)) Sec. 2-16-26. Removal of signs.

Any sign which advertises an activity, business, product or service which has ceased operation or production shall be removed within six (6) months of the discontinuance of said activity,

business, product or service.

(Res. of 3-9-82, § I(5)) Sec. 2-16-27. General standards.

Signs must be constructed of durable materials, maintained in good condition, and not permitted to become dilapidated.

(Res. of 3-9-82, § I(3)) Sec. 2-16-28. Prohibited signs.

(a) Signs imitating warning signals are prohibited. No sign shall display lights resembling the flashing lights customarily used in traffic signals or in police, fire, ambulance, or rescue vehicles, nor shall any signs use the words, slogans, dimensional shape or size, of any governmental traffic sign.

(b) No signs, except traffic signs and signals and informational signs erected by a public agency, are permitted within any street or highway right-of-way.

(c) Signs painted or attached to natural features such as trees or rocks, telephone poles, utility poles, or fence posts are prohibited.

(d) Fluttering ribbons and banners are prohibited.

(e) Signs within three hundred (300) feet of any officially designated historical site or monument, except signs pertaining to that particular site or monument are prohibited.

(Res. of 3-9-82, § II) Sec. 2-16-29. Home occupation signs.

One (1) nonilluminated professional or business name plate not exceeding two (2) square feet in area is permitted on the premises of a

business.

(Res. of 3-9-82, § III(1)) Sec. 2-16-30. Signs for work under construction.

One (1) nonilluminated sign not exceeding forty (40) square feet in area displaying the name of the building, the contractors, the architects, the engineers, the owners, the financial, selling and development agencies are permitted upon the premises of any work under the construction, alteration, or removal. Such signs shall be removed from the

site within thirty (30) days after the completion of the project.

(Res. of 3-9-82, § III(2)) Sec. 2-16-31. Temporary subdivision signs.

Temporary signs, not exceeding forty (40) square feet in area announcing a land subdivision development, are permitted on the premises of the land subdivision. Such signs shall be spaced not less

than three hundred (300) feet apart. They shall be removed when seventy-five (75) percent of the lots are conveyed.

(Res. of 3-9-82, § III(3)) Sec. 2-16-32. Private directional signs.

Signs indicating the location and direction of premises available for or in process of development, but not erected upon such premises, and having inscribed thereon the name of the owner,

developer, builder, or agent may be erected and maintained, provided:

(1) The size of any such sign is not in excess of six (6) square feet, and not in excess of four (4) feet in length; and

(2) Not more than one (1) such sign is erected on each five hundred (500) feet of rightof-way frontage.

(Res. of 3-9-82, § III(4)) Sec. 2-16-33. Roof signs.

Not more than one (1) roof sign structure (off premises or on premises) may be erected on the roof of any one (1) building. No roof sign structure shall extend more than twenty-five (25) feet above the elevation of the roof.

(Res. of 3-9-82, § III(5)) Sec. 2-16-34. Wall signs.

(a) Signs on the walls of a building (including signs attached flat against the wall, painted wall signs and projected signs) shall meet the following requirements:

(1) The total area of signs on the exterior front surface of a building shall not exceed twenty-five (25) percent of the front surface of the building.

(2) The total area of signs on a side or rear surface of building shall not exceed fifty

(50) percent of the exterior side of the rear surface of the building respectively.

(3) Wall signs attached flat against a wall may extend not more than twenty-four

(24) inches from the wall.

(b) Signs attached at an angle to a wall may extend outward from the wall of a building not more than five (5) feet.

(Res. of 3-9-82, § III(6)) Sec. 2-16-35. Illuminated signs.

Illumination devices (on and off premises) shall be so placed and so shielded that light from the sign itself will not be directly cast into any residential district, sleeping rooms in any district or the eyes of an automobile or vehicular driver.

(Res. of 3-9-82, § III(7)) Sec. 2-16-36. Outdoor advertising signs.

Outdoor advertising signs shall meet the following requirements:

(1) The outside measurements of all such signs shall be twelve (12) feet in height and fifty (50) feet in length, with or without trim.

(2) All illuminated signs shall use base mounted fluorescent or mercury vapor lights and shall be activated by photoelectric cells. Additional lighting including but not limited to neon, animation and running lights is prohibited.

(3) All signs shall be a minimum of ten (10) feet above adjacent interstate pavement measuring from the lower portion of the sign face. Signs shall not exceed thirty

(30) feet in height. Two (2) signs in the same location (back-to-back) to "V" formation shall be the same height above the interstate's surface.

(4) Extrusions beyond the face of the sign, excluding aprons, are prohibited.

(5) Only one (1) sign shall be allowed to face the same direction per location. This alROADS AND BRIDGES § 2-16-36 lows either a back-to-back sign or a "V"

formation sign but prohibits two (2) signs (side-by-side) facing the same direction.

(6) Sign locations shall be no less than five hundred (500) feet apart measuring from the two (2) closest points.

(7) Sign structures shall be no less than ten

(10) feet from any property or right-ofway line.

(8) Three (3) outdoor advertising signs shall be allowed per quadrant of an interchange adjacent to the Interstate Highway. These signs must be within a commercial or industrial area as specified in state law and are restricted to an area one

thousand two hundred (1,200) feet long beginning five hundred (500) feet from the point where the pavement widens on the main traveled way to accommodate the longest entrance or exit ramp.

(9) No sign shall be placed in or obstruct the view of a marshland or an area of designated historic interest.

(10) Outdoor advertising shall be limited to the following:

a. Travel service facilities including lodging, gas, food, camping;

b. Areas of scenic beauty;

c. Public attractions including historic, natural, scientific or recreational amenities; and

d. Any combination of the above-listed facilities.

Further, the content of all advertising shall be directional in nature.

(Res. of 3-9-82, § III(8)) Sec. 2-16-37. On-premises signs.

On-premise signs located within one hundred

(100) feet of a regularly used part of the activity (building, parking lot) being advertised and located on the same property and "for sale" or "for lease" signs located on the property being advertised are not prohibited.

(Res. of 3-9-82, § IV(9)) Secs. 2-16-38—2-16-50. Reserved.

ARTICLE III. ROAD NAME SYSTEM*

Sec. 2-16-51. Established.

There is hereby established an official system of road names in the county as shown on the map entitled "Base Map—Lamar County," dated August 21, 1990, as produced by the McIntosh Trail Area planning and development commission. A

copy of such map is made a part of this article.

(Res. of 8-21-90, § 1) Sec. 2-16-52. Changing of names by resolution.

Names of roads in the county shall remain as shown on the map unless officially changed by resolution.

(Res. of 8-21-90, § 2) Sec. 2-16-53. Acceptance of roads by county;

assignment of names.

No new roads shall be accepted by the county, and no improvements made therein until such roads have been named. If there are extensions of existing roads, the existing name(s) shall be continued. If not an extension, name(s) recorded may not duplicate or closely approximate road names

already assigned.

(Res. of 8-21-89, § 3) Sec. 2-16-54. Maintenance of system; revisions to base map.

The county administrator shall be responsible for the maintenance of the system of road names.

He/she or his/her designee shall maintain a copy of the map adopted by this article and shall record thereon all changes made by resolution or new assignments accepted by subdivision platting or other legal means. He/she shall cause to be made revisions to the base map to include all official changes made up to the date of revision which is also to be clearly recorded thereon.

(Res. of 8-21-90, § 4) Secs. 2-16-55—2-16-60. Reserved.

ARTICLE IV. RESERVED*

Secs. 2-16-61—2-16-79. Reserved.

ARTICLE V. ROAD USE AND

REGULATION

Sec. 2-16-80. Purpose.

This article is made, adopted, and enacted so as to promote the traditional police power goals of health, safety, morals, and the general welfare of the community, the lessening of congestion of county roads and streets, security of the public, promotion of health and general welfare of its citizens, protection of the aesthetic qualities of the county, and facilitation of the adequate provision of transportation and other public requirements; and for the purpose of protecting the county's significant investment in rights-of-way,

roads, bridges, infrastructure, and improvements to its road system.

(Ord. No. 05-03, §§ 1, 2, 5-24-05) Sec. 2-16-81. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

(1) County shall mean Lamar County, Georgia.

(2) County road system shall mean all roads, streets, and roadways owned by the county and operated and maintained for the travel and convenience of the public and shall include all bridges, culverts, ditches, drainage structures, rights-of-way, sidewalks, and appurtenances and improvements to the county roads.

(3) Road shall mean the entire width between the boundary lines of every way publicly maintained when any part thereof is open to the use of the public for the purpose of vehicular travel.

(4) Unimproved road system means those roads in the county road system that are not paved.

(5) Truck shall mean every motor vehicle with more than six (6) wheels or having an overall length in excess of thirty (30) feet designed, used, or maintained primarily for the transportation or property, goods and material.

(Ord. No. 05-03, §§ 1, 2, 5-24-05) Sec. 2-16-82. Route of travel; through trucks.

(a) [Through trucks.] All trucks are prohibited from using or parking on any road within the unincorporated area of the county which is posted "No through trucks".

(b) Exceptions. This section shall not be interpreted to prohibit the following:

(1) The operation of trucks upon any road, when necessary to the conduct of a business, to a destination point; provided roads upon which such truck traffic is

permitted are used until reaching the intersection nearest the destination point.

(2) The operation of emergency vehicles upon any road in the county.

(3) The operation of trucks owned or operated by the county, state, municipality, public utility, public works, or any contractor engaged in the repair, maintenance, or construction of roads, road improvements, or road utilities within the county.

(4) The operation of trucks upon any officially established detour in any case where such truck could lawfully be operated upon the road for which such detour is established.

(c) The following roads shall be designated and posted for "No through trucks":

(1) Johnsonville Road;

(2) High Falls Park Road;

(3) Brent Road;

(4) Fredonia Church Road;

(5) Piedmont Road;

(6) Five Points Road;

(7) Zebulon Road (in Milner);

(8) Yatesville Road;

(9) Forsyth-Yatesville Road;

(10) Old Milner Road;

(11) Ramah Church Road;

(12) Van Buren Road;

(13) Liberty Hill Road;

(14) South Sixth Street;

(15) Philip Weldon Road;

(16) Trice Road;

(17) Martin Dairy Road;

(18) Chappell Mill Road;

(19) High Falls Road;

(20) Burnette Road;

(21) Cannafax Road;

(22) Williams Road;

(23) Berry Road;

(24) Grove Street;

(25) Parker Branch Road;

(26) Crawford Road;

(27) Mckenzie Road beginning at Milner city limits and ending at the intersection with Martin Dairy Road;

(28) Camp Road beginning at its intersection with South 6th Street and ending at the Spalding County line.

(Ord. No. 05-03, §§ 1, 2, 5-24-05; Ord. No.

2020-06, § 1, 9-15-20; Ord. No. 2020-25, § 1, 12-15-20; Ord. No. 2021-07, § 1, 5-18-2021; Ord.

No. 2023-15, § 1, 10-17-23) Sec. 2-16-83. Travel on unimproved roads.

Trucks shall not travel over any part of the county's unimproved road system during periods of rain or inclement weather when said travel will clearly cause excessive damage and maintenance to the road system such that conditions for the travel of passenger vehicles will be substantially impaired.

(Ord. No. 05-03, §§ 1, 2, 5-24-05) Sec. 2-16-84. Travel over bridges.

Notwithstanding any provision of this article to the contrary, no truck or other vehicle shall be operated over any bridge with a posted weight limit which is less than the total gross weight of the truck or vehicle and its load.

(Ord. No. 05-03, §§ 1, 2, 5-24-05) Sec. 2-16-85. Enforcement.

(a) Any law enforcement agency of Lamar County shall have the authority to require any person driving or in control of any truck operating on any restricted road to submit to an inspection of said driver's log book, weight slips,

delivery slips, or other written evidence of the truck's point or origin and destination point to justify its presence on a prohibited road.

(b) Any person violating the provisions of this article shall, upon conviction in the Lamar County Magistrate Court, or other court of competent jurisdiction, or upon a plea of guilty or nolo contendere, shall be punished by a fine not to exceed five hundred dollars ($500.00) and/or up to sixty (60) days' confinement in the Lamar County jail.

(Ord. No. 05-03, §§ 1, 2, 5-24-05) Secs. 2-16-86—2-16-89. Reserved.

ARTICLE VI. TIMBER HARVESTING

Sec. 2-16-90. Timber harvesting.

(a) All persons or firms harvesting standing timber in any unincorporated area of Lamar County for delivery as pulpwood, logs, poles, posts, or wood chips to any woodyard or processing plant located inside or outside this state shall provide notice of such harvesting operations to the Lamar County Governing Authority or the designated agent thereof prior to entering

onto the property if possible, but in no event later than twenty-four (24) hours after entering onto the property. Further, such persons shall give notice of cessation of cutting within twentyfour (24) hours after the job is completed.

(b) The notice of harvesting operations required by this article shall be provided for each separate tract to be harvested. Such notice shall be made in such form as prescribed by rule or regulation of the director of the Georgia Forestry Commission, and shall include the following information:

(1) A map of the area which identifies the location of the tract to be harvested and, as to those trucks which will be traveling to and from such tract for purposes of picking up and hauling loads of cut forest products, the main point of ingress to such tract from a public road and, if different, the main point of egress from such tract to a public road. If multiple points of ingress and/or ingress will be used, all such points shall be identified;

(2) A statement as to whether the timber will be removed pursuant to a lump sum sale, per unit sale, or owner harvest for purposes of ad valorem taxation under

O.C.G.A. § 48-5-7.5;

(3) The name, address, and daytime telephone number of the timber seller if the harvest is pursuant to a lump sum or per unit sale or of the timber owner if the harvest is an owner harvest; and

(4) The name, business address, business telephone number, and nighttime or emergency telephone number of the person or firm harvesting such timber.

(c) Subject to the provisions of subsection (e) of this section, the notice required by this article may be submitted in person, by transmission of an electronic record via telefacsimile or e-mail, or by mail.

(d) Subject to the provisions of subsection (e) of this section, upon notification published by the Director of the Georgia Forestry Commission that a state-wide notification website or platform is available for public use, persons or firms wishing to utilize said website or platform to provide the notice required by this article may do so at their option, and Lamar County will accept notifications submitted in this manner.

(e) On and after a date specified and published by the Director of the Georgia Forestry Commission, use of the state-wide notification website or platform shall be mandatory and shall be the

sole means of providing the notice required by this article; on and after said date submission of the notice by any of the means listed in subsection (c) above shall cease and will no longer be deemed acceptable or in compliance with this

article.

(f) The notice required by this article shall not be or remain effective unless and until the person or firm providing such notice has delivered to the Governing Authority of Lamar County or its designated agent a valid surety bond, executed by a surety corporation authorized to transact business in this state, protecting Lamar County against any damage caused by such person or firm in the amount of five thousand dollars ($5,000.00); provided, however, that at the option of the person or firm harvesting timber a valid irrevocable letter of credit issued by a bank or savings and loan association, as defined in O.C.G.A. § 7-1-4, in the amount of five thousand dollars ($5,000.00) may be provided in lieu of a surety bond. Such bonds or letters of credit shall be subject to the conditions set forth in subsections (g) and (h) of this section. No more than one bond or letter of credit shall be required from

each person or firm harvesting timber, regardless of the number of tracts harvested in the county for so long as the bond or letter of credit

remains in effect. The bond or letter of credit required herein shall be valid only for the calendar year in which it was delivered.

(g) The bond or letter of credit required by subsection (f) of this section shall protect Lamar County against any damage requiring re-ditching or repair of existing ditch structures or the removal of any harvesting residue, including

tree tops, debris, logs, pulpwood and other materials, placed in or around the county's rights-ofROADS AND BRIDGES § 2-16-90 way caused by such person or firm tendering the

bond or letter of credit. The proceeds of such bond or letter of credit shall be available to reimburse the county for any cost incurred to repair such damages or remove such debris in or around the county's rights-of-way. The proceeds of such bond or letter of credit shall also be available to reimburse the county for any costs incurred to maintain or repair county roads damaged by the ingress or egress of motor vehicles engaged in the harvest operations located within five hundred (500) feet of any point of ingress or egress of the timber harvesting operation. The right of Lamar County to call such bond or letter of credit in accordance with the

provisions of subsection (h) of this section shall be in addition to any other remedies available to the county at law or in equity for damage to county roads or rights-of-way.

(h) When damage results from a person or firm's harvesting activities, the governing authority of Lamar County shall make and provide a written claim to the person or firm causing the

damage within thirty (30) business days after the governing authority becomes aware of the damage. Such claim may be given in person, by telefacsimile, email or mail. The claim shall describe the damage in detail and, in compliance with subsection (i)(1) of this section, give the person or firm the opportunity to repair such damage within thirty (30) days of the notification; provided, however, the county shall be authorized to repair the damage immediately if

the governing authority or its designee determines the conditions present a threat to public safety, health or welfare and, upon making such repairs, shall present to the person or firm and the issuer of the applicable bond or letter of credit an itemized list of expenses incurred as a claim against the responsible party and the issuer of its bond or letter of credit. Upon the issuance of a claim as provided in this section the governing authority of Lamar County or its designee shall notify the issuer of the bond or letter of credit that a claim has been made and will be resolved or adjudicated according to the terms of this article.

(i) Within thirty (30) days of receipt of the written claim described in subsection (h), the person or firm against whom the claim is submitted may:

(1) Repair such damage at his or its own expense with the approval and supervision of the governing authority of Lamar County or its designee. When repairs are

completed to the satisfaction of the governing authority or its designee, the governing authority or its designee shall provide a written notification of satisfactory

completion within five (5) business days to the responsible person or firm and to the surety issuing the bond or the bank issuing the letter of credit, thereby terminating the claim.

(2) In the event of inclement weather or other factors preventing repair of the damage, request a thirty (30) day extension to repair the damage from the governing authority of Lamar County, provided that no extensions shall exceed ninety

(90) days from the date the claim was tendered. Approval of any extension shall be at the discretion of the governing authority of Lamar County or its designee.

(3) Appeal the claim to the magistrate court of Lamar County. Any such appeal must name the issuer of the bond or letter of credit as a party, who shall be served with all pleadings in the action and shall have the right to appear. The magistrate court will hear evidence and arguments within thirty (30) days of the written appeal and issue a ruling within ten (10) days of such hearing. Any such appeal shall toll the thirty (30) day period, or any extension thereof, required by subsection (h) of this section. If the magistrate court rules in favor of the person or firm

against whom the claim was made, the county shall have no right to recover any proceeds of the bond or letter of credit, and judgment shall be entered against the county. If the magistrate court rules in favor of the county the court shall determine the amount of damages to which the county is entitled to recover and enter judgment accordingly; the governing authority of Lamar County shall be authorized to call the bond or letter of credit and recover from the proceeds thereof an amount equal to the judgment entered by the court, up to the total amount of the bond or letter of credit. The portion of any judgment entered in favor of the county that exceeds the amount of the bond or letter of credit shall be subject to collection by any additional remedies at law or equity.

(4) In the event the person or firm against whom the claim has been submitted fails to take any of the actions allowed under subsections (i)(1), (i)(2) or (i)(3) of this section within the time required therein, such person or firm shall be deemed to have waived any and all rights to contest the call of the bond or letter of credit.

(j) If the person or firm tendering a bond or letter of credit pursuant to the requirements of this article continues its timber harvesting operation beyond the calendar year in which the bond or letter of credit was issued, the person or firm

continuing the timber harvesting operation shall tender a new bond or letter of credit within five

(5) business days after the first day of the new calendar year.

(k) In the event a bond or letter of credit tendered pursuant to the requirements of this article is revoked by the surety or bank, then a valid replacement bond or letter of credit must be delivered to the governing authority of Lamar County within five (5) business days after the date of revocation in order for timber harvesting operations to continue. In addition, if the person or firm tendering the bond or letter of credit caused its revocation, the amount of the bond or letter of credit required shall be increased to seven thousand five hundred dollars ($7,500.00) after the first revocation, and ten thousand dollars ($10,000.00) after a second revocation caused by the person or firm tendering the bond or letter of credit. The maximum amount of the bond or letter of credit shall not exceed ten thousand dollars ($10,000.00).

(l) Submission of the notice required by this article shall authorize the person or firm submitting same to undertake the timber harvesting operation described in the notice and shall remain

in effect until such time as the person or firm gives notice that the harvesting operation is complete; provided, however, that any change in the facts required to be provided for purposes of such notice, including but not limited to a change in the scope or extent of the operation, must be reported to the governing authority of Lamar County within three (3) business days after such change.

(m) Any person or firm that engages in a timber harvesting operation in the unincorporated portion of Lamar County without complying with the notice requirements of this article shall be subject to a citation and trial, and upon conviction shall be fined in an amount not to exceed one thousand five hundred dollars ($1,500.00) for each violation.

(n) This article applies to activities which qualify as forestry land management practices or agricultural operations under O.C.G.A. § 12-7- 17(5) and (6) on land that is zoned for or used for forestry, silvicultural or agricultural purposes. It shall not authorize land disturbing activities incidental to development in conflict with the limitations set forth in O.C.G.A. § 12-7-17(6).

(o) Consistent with O.C.G.A. § 12-6-24:

(1) No fee shall be charged to provide and submit the notice required by this article;

and

(2) No permit, including a driveway permit, shall be required of the person or firm engaged in a timber harvesting operation as defined by said Code section.

Persons and firms providing the notice required by this article may be asked to consult with county officials responsible for roads and public works for the purpose of minimizing damage to the county's roads, rights-of-way and infrastructure, and are urged to follow recommendations from county officials. Notwithstanding the forgoing, the person or firm conducting the timber harvest operation bears ultimate responsibility for their actions,

and nothing in this article shall preclude the governing authority of Lamar County from taking any and all legal action necessary to protect its property and the health, safety and welfare of its citizens.

(Ord. No. 2021-03, § 1, 4-20-21) Chapter 2-17

SOLID WASTE AND RECOVERED MATERIALS*

ARTICLE I. IN GENERAL

Sec. 2-17-1. Solid waste plan.

The Lamar County Solid Waste Plan as adopted by the Lamar County Commission on September 7, 1993 is incorporated into and made a part of this chapter.

(Mo. of 6-9-75; Ord. of 12-7-93) Sec. 2-17-2. Littering.

(a) It is unlawful for any person to place, pile, dump or dispose of any trash, garbage or debris of any type on the public roads or on public or private properties in the county except at an approved landfill site. This section does not apply to any person disposing of wastes originating from his own residence on to land and facilities owned by him.

(b) This section shall be enforced by the Lamar County Magistrate Court.

(c) Any person violating the provisions of this section shall be punished by a fine not exceeding one thousand dollars ($1,000.00) or be imprisoned not to exceed sixty (60) days or both.

(Ord. of 6-9-75) Sec. 2-17-3. Definitions.

Animal carcass means a deceased animal or portion thereof greater than ten (10) pounds in weight.

Authority means the Lamar County Regional Solid Waste Management Authority established pursuant to O.C.G.A. § 12-8-51 et seq., by enabling resolutions of the governing entities of Lamar County and the City of Milner.

Building and zoning department means the Lamar County Building and Zoning Department, same being the department charged with the day-to-day duty of overseeing the administration of all building, land disturbing, and zoning ordinances assigned to it by the Lamar County Board of Commissioners and the Lamar County Code of

Ordinances.

Bulky waste means appliances, furniture, automobile parts and other materials that exceed fifty (50) pounds in weight or four (4) cubic feet by

volume.

Commercial waste means waste material resulting from commercial operations that differs in weight, bulk, volume or character from domestic

waste as defined herein.

Construction and demolition (C&D) landfill means a facility accepting waste building materials and rubble resulting from construction, remodeling, repair, or demolition operations on pavements, houses, commercial buildings, and other structures. Such waste includes, but is not limited

to, waste containing asbestos, wood, bricks, metal, concrete, wallboard, paper, cardboard, and other nonputrescible wastes associated with construction and demolition activities which have a low potential for ground-water contamination.

Container means collection container supplied through the authority's solid waste programs, whether supplied by the county, the authority or by a company contracting with the authority to provide solid waste collection services in Lamar County, including without limitation residential curbside collection bins, dumpsters, and recyclable collection bins, containers or trailers.

Construction debris means waste building materials resulting from construction, remodeling, repair or demolition operations.

Domestic waste means waste, garbage, rubbish and trash such as is ordinarily generated at a residence or light commercial establishment. By way of example, such waste includes but is not limited to waste accumulated from the preparation, processing, consumption, handling, packing, canning, storage and decay of food products, food

containers and other consumer goods containers, waste wood, paper, plant, crockery, cloth, glass, packaging material and floor sweeping materials, rags, straw, floor sweepings, and deceased animal matter of less than ten (10) pounds.

Hazardous waste means any chemical, compound, mixture, substance or article which is designated by the United States Environmental

Protection Agency or appropriate agency of the state to be "hazardous" as that term is defined by or pursuant to federal or state law or regulation.

Housing. The term housing shall be interpreted to include double wide, dwelling, cluster dwelling, condominium, garden apartment, multiple-family dwelling, patio dwelling, singlefamily attached, single-family detached, townhouse, two-family dwelling, factory built housing, industrialized home, manufactured home, mobile

home, modular homes, multisection home, prefabricated homes, sectional home and single wide; all as defined in section 203 of the Lamar County

Zoning Ordinance.

Incinerator means a furnace for destruction of solid waste by controlled flame combustion. An incinerator must be capable of reducing solid waste to ash.

Inert waste landfill means a facility of more than one (1) acre accepting only wastes that will not or are not likely to cause production of leachate of environmental concern. Such wastes are limited to earth and earth-like products, concrete, cured asphalt, rock, bricks, yard trimmings,

stumps, limbs, and leaves. This definition excludes industrial and demolition waste not specifically listed above. This definition also excludes any site created by a person disposing of organic

inert waste (e.g. stumps and other vegetative debris) originating from their own property on to land and facilities owned by said person.

Materials recovery facility means a solid waste handling facility that provides for the extraction from solid waste of recovered materials.

Municipal solid waste landfill means a disposal facility where any amount of municipal solid waste, whether or not mixed with or including commercial waste, industrial waste, nonhazardous sludges, or small quantity generator hazardous wastes, is disposed of by means of placing an approved cover thereon.

Recovered materials means those materials which have known use, reuse or recycling potential; can be feasibly used, reused or recycled; and have been diverted or removed from the solid

waste stream for sale, use, reuse or recycling, whether or not requiring subsequent separation and processing.

Recovered materials processing facility means a facility engaged solely in the storage, processing, and resale or reuse of recovered materials.

Such term shall not include a solid waste handling facility; provided however, any solid waste generated by such facility shall be subject to all

applicable laws and regulations relating to such solid waste. A recovered materials processing facility may also be referred to as a "recycling center."

Sanitary landfill means an area of land in which solid waste is placed for permanent disposal. The term sanitary landfill shall be interpreted to include inert waste landfills, municipal solid waste landfills, and construction and demolition (C&D) landfills.

Solid waste means any garbage or refuse; sludge from a wastewater treatment plant, or air pollution control facility; and other discarded material including solid, liquid, semisolid or contained

gaseous material resulting from industrial, commercial, mining and agricultural operation and from community activities, but does not include

recovered materials; solid or dissolved materials in irrigation return flows or industrial discharges that are point sources subject to permit under 33 U.S.C. § 1342; or source, special nuclear or byproduct material as defined by the Federal Atomic Energy Act of 1954, as amended (68 Stat.

923) or hazardous materials as defined under 40 C.F.R. § 261.3. The term solid waste shall be interpreted to include bulky waste, commercial waste, construction debris, domestic waste and yard waste.

Solid waste handling facility means any facility, the primary purpose of which is the storage, collection, transportation, treatment, utilization,

processing, or disposal, or any combination thereof, of solid waste. This term includes the terms inert waste landfill, municipal solid waste landfill, materials recovery facility, construction and demolition (C&D landfill), incinerator and transfer station, each as defined in this section.

Transfer station means a facility used to transfer solid waste from one transportation vehicle to another for transportation to a disposal facility or

processing operation.

Yard waste means leaves, tree limbs, weeds, decomposed vegetation and other natural and biodegradable waste such as normally results from clean-up or landscaping of residential or business yards and grounds.

Zoning administrator means the person designated by the Lamar County Board of Commissioners to administer the Lamar County Zoning Ordinance and their authorized representative.

(Ord. of 12-7-93; Ord. No. 2008-02, §§ 2—4, 7-24- 08) Sec. 2-17-4. Scope of authority.

Lamar County's authority with regards to solid waste management is transferred to the authority to the extent authorized by the authority's enabling resolution, the agreement among participants, and state law. The authority will initiate a curbside domestic waste collection program as set

forth herein, will establish facilities for collection of recyclables, will operate and manage the Lamar County landfill, and will perform such other functions as it sees fit within the scope of its

authority. Lamar County shall be bound by the contracts of the authority to the extent such contracts are authorized by law and within the scope of the authority's powers under its enabling resolution, agreement among participants and state law.

(Ord. of 12-7-93) Secs. 2-17-5—2-17-15. Reserved.

ARTICLE II. COUNTY COLLECTION AND

DISPOSAL SERVICE

Sec. 2-17-16. Responsibility for county garbage collection.

Pursuant to Official Code of Georgia Annotated Section 12-8-51 et seq., and the enabling resolution of the Lamar County Regional Solid Waste Management Authority (henceforth "the authority"), the Lamar County Board of Commissioners transfers to the authority the power and responsibility of arranging for the collection and disposal of solid waste, after consultation with the county,

which authority shall include but not limited to the following specific powers:

(1) The power to establish a program for curbside pickup and disposal of domestic waste as defined herein and to contract for same, including the power to establish curbside pickup and disposal of bulky waste or other waste as defined herein at additional cost to individual consumers of said service;

(2) The power to arrange for collection of mandatory fees from each county residence and business for curbside pickup and disposal of domestic waste;

(3) The power to establish and operate facilities and sites for the collection and disposal of solid waste and recyclable materials, including but not limited to landfills, dumpsters, recycling containers and recycling centers;

(4) The power, concurrently with the Lamar County Board of Commissioners, the Lamar County Sheriff, and the Lamar County Health Department, to enforce by citation

or civil action solid waste management programs to the extent they are set forth in this chapter;

(5) All other legal powers necessary to effectively carry out the aforesaid tasks.

(Ord. of 12-7-93) Sec. 2-17-17. Frequency of collection.

The Lamar County Regional Solid Waste Management Authority (henceforth "the authority"), within one hundred twenty (120) days of the

adoption of this chapter, shall provide for curbside pickup of domestic waste at residences and such other sites as the authority deems fit a least once each week and shall provide common sites where solid waste and recyclable material may be dropped off by individuals and businesses. The authority shall see that the common sites are serviced at regular intervals so as to keep such sites from becoming legal nuisances.

(Res. of 9-27-74; Ord. of 12-7-93) Sec. 2-17-18. Restrictions on placement of wastes.

(a) Domestic waste shall be placed in containers specifically designated for that purpose.

(b) No person, business, or other entity shall place hazardous waste, bulky waste, animal carcasses, construction debris or commercial debris, in containers provided for the collection of domestic waste; nor shall any person, business, or other entity place such waste in areas of the landfill

unless such area is specifically designated by the authority for those purposes and the person, business or entity complies with rules and regulations set by the authority, including payment of such fees as are set by the authority for placement

of same.

(c) No person shall knowingly place items that are not recyclable into containers designated for recyclable material.

(d) No person shall place waste outside a container.

(Res. of 9-27-94; Ord. of 12-7-93) Sec. 2-17-19. Use of county landfill and collection sites by commercial and governmental entities.

(a) The authority is specifically authorized to contract with private and governmental entities both inside and outside of Lamar County with regards to the disposal of solid waste at the Lamar County landfill, pursuant to such fee rates, payment provisions and rules regarding disposal as are set by the authority.

(b) No private or governmental entity is permitted to dispose of solid waste at the landfill, or at any collection site operated by the authority, or

in any curbside container provided pursuant to an authority program, without permission of the authority and compliance with authority fee rates, payment provisions and rules regarding disposal.

(Res. of 9-27-74; Ord. of 12-7-93) Sec. 2-17-20. Reserved.

Sec. 2-17-21. Fires in containers; placing flammable objects in containers.

No person shall set the contents of a container afire or place highly flammable materials in a container.

(Res. of 9-27-74) Sec. 2-17-22. Scavenging containers.

No unauthorized person shall scavenge or remove the contents of a container.

(Res. of 9-27-74) Sec. 2-17-23. Damaging containers.

No person shall damage a container.

(Res. of 9-27-74) Sec. 2-17-24. Service fees; lien for unpaid charges.

(a) The fees specified in section 2-17-16, and any other charges, fees, or assessments imposed by the authority, are levied against both the owner and occupant of the premises served, jointly and severally, but collection from one shall relieve the other. These fees shall be collected in the same manner and at such intervals as may be prescribed by resolution of the authority. All uncollected fees due the authority shall constitute a continuing lien against the property served to the

same extent, and subject to the same addition of interest and costs, as provided by law with respect to county ad valorem taxes, and may be enforced and collected in the same manner provided for the collection of delinquent taxes, including, but not limited to, the filing of record of a fi.

fa. against the property in the Lamar County Superior Court Clerk's Office.

(b) It shall be the duty of the Lamar County Tax Commissioner to collect the amount of the lien imposed under subsection (a) as if it were a real property ad valorem tax, using all methods available for collecting real property ad valorem tax, including specifically O.C.G.A. title 48, chapter 4; provided, however, that the limitation of O.C.G.A. § 48-4-78 which requires twelve (12)

months of delinquency before commencing a tax foreclosure shall not apply.

(Ord. No. 04-02, § 1, 6-22-04) Secs. 2-17-25—2-17-40. Reserved.

ARTICLE III. LANDFILL

Sec. 2-17-41. Scope.

This article III entitled "Landfill" shall only apply to the landfill facility(ies) owned by Lamar County and operated by the authority. The requirements of article V shall not apply to this landfill, to the authority, or to authority facilities.

(Res. of 9-27-74; Ord. of 12-7-93; Ord. No. 2008- 02, § 5, 7-24-08) Sec. 2-17-42. Reserved.

Sec. 2-17-43. Operating hours.

The landfill shall be open during such hours as are set by the authority from time to time, which hours are subject to change. The authority shall operate the landfill in such a manner as to adequately serve the needs of county residents and businesses for reasonable access to same. Hours

of operation shall be posted in a place accessible to the public; and no person shall enter the landfill when it is not open.

(Res. of 9-27-74; Ord. of 12-7-93) Sec. 2-17-44. Wastes prohibited.

(a) No person, business, or other entity shall place hazardous waste, bulky waste, animal carcasses, construction or commercial debris, in the landfill except in areas and under conditions

specifically designated by the authority for those purposes. Each person, business or entity must comply with rules and regulations set by the authority, including payment of such fees as are set by the authority, in placing any such waste in the landfill.

(b) No waste that is not acceptable under state and federal environmental laws, rules and regulations shall be placed at the landfill.

(Res. of 9-27-74; Mo. of 3-26-75; Ord. of 12-7-93) Sec. 2-17-45. Fires.

No person shall set fire to any waste at the landfill.

(Res. of 9-27-74) Sec. 2-17-46. Scavenging.

No unauthorized person shall scavenge, sort or remove material from the landfill.

(Res. of 9-27-74) Sec. 2-17-47. Fees.

Landfill fees and rates shall be set by the authority and shall change from time to time as the authority deems necessary.

(Res. of 9-27-74; Mo. of 3-26-75; Mo. of 12-29-88;

Ord. of 12-7-93) Secs. 2-17-48—2-17-59. Reserved.

ARTICLE IV. ENFORCEMENT

Sec. 2-17-60. Penalties.

(a) Pursuant to Official Code of Georgia Annotated section 36-1-20, violation of any of the provisions of Chapter 2-17, Lamar County's Solid

Waste Ordinance, shall be punishable by a fine of one thousand dollars ($1,000.00), imprisonment for up to sixty (60) days, or both.

(b) Jurisdiction over violations of this chapter shall be in Lamar County Magistrate Court.

(c) The authority and the county have joint and several rights and authority to file civil lawsuits against persons or entities violating the provisions of Chapter 2-17, to enjoin violations, request equitable relief, or seek damages and costs. Such suits may be filed in any court that would have jurisdiction to entertain them, at the discretion of the filing entity. The right to seek civil remedies is in addition to, and not in lieu of, the right to prosecute citations and seek penalties as set forth herein.

(d) The authority is authorized to enforce by ordinance or resolution the collection of taxes, fees, or assessments due to it in the same manner as authorized by law for the enforcement of the collection and payment of state taxes, fees, or assessments as provided in O.C.G.A. § 12-8-39.3.

(Ord. of 12-7-93; Ord. No. 04-02, § 2, 6-22-04) Secs. 2-17-61—2-17-69. Reserved.

ARTICLE V. SOLID WASTE HANDLING

FACILITIES AND RECOVERED

MATERIALS PROCESSING FACILITIES

Sec. 2-17-70. Definitions.

The definitions contained in article I entitled "General" shall apply to the provisions of this article entitled "Solid Waste Handling Facilities and Recovered Materials Processing Facilities".

(Ord. No. 2008-02, § 6, 7-24-08) Sec. 2-17-71. Permit required.

No person shall operate any solid waste handling facility or recovered materials processing facility within the jurisdictional boundaries of

Lamar County without first obtaining a permit approved by the Lamar County Board of Commissioners and issued by the Lamar County Building and Zoning Department.

(Ord. No. 2008-02, § 6, 7-24-08) Sec. 2-17-72. Application requirements.

(a) Applications for a solid waste handling facility or recovered materials processing facility permit shall be made on forms published and provided by the Lamar County Building and Zoning Department. Permit applications may be initiated upon application by the owner(s) of the subject property or the authorized agent of the owner(s). For the purposes of this section, the term "facility" shall mean a solid waste handling facility or a recovered materials processing facility.

(b) Each applicant shall complete all questions contained within the required application form.

The applicant shall, under penalty of perjury, certify that all information contained in the permit application and all information submitted in connection with the permit application is true and

correct. At a minimum the applicant shall provide all of the following:

(1) The mailing address, email address, fax number and phone number of any applicant or agent who is authorized to represent the owner(s) of the subject property;

(2) Description:

a. A legal description of the property and a copy of any deed vesting title in the owner. This description should include a reference to the deed book and page number or other evidence of title the current property owner may have;

b. Location of property by tax map and parcel number;

c. Description of any existing rights-ofway, easements, or restrictive covenants affecting the property;

d. List of all adjoining property owners giving their name, address, telephone numbers and the zoning classification of their property;

(3) A plat of survey of the property, prepared within the last two (2) years and signed and sealed by a land surveyor registered in the state showing the boundary lines of said property and the location of the proposed facility. Said survey shall:

a. Indicate the complete boundaries of the subject property and all buildings and structures existing thereon;

b. Include a notation as to the total acreage or square footage of the property;

c. Delineate the boundaries of the 100- year floodplain;

d. Delineate all jurisdictional wetlands by metes and bounds;

e. Delineate all streams by metes and bounds;

(4) A site plan representing the location of the proposed facility, which shall depict the following information about the property:

a. A correct scale, date, north arrow, and legend;

b. The owner's name and present zoning classification of all parcels adjacent and across any right-of-way from the property;

c. The location of the property relative to existing and proposed streets;

d. The location of existing and/or platted streets, easements, buildings, railroads, cemeteries, bridges, sewers, water mains, culverts, wells and gas

and electric transmission lines;

e. All easements for water lines and sewer lines, both existing and proposed on the property;

f. Required setbacks hereunder and for the underlying zoning district;

g. Topographic information sufficient to show the elevation and drainage conditions of the property;

h. Existing improvements located on the property;

i. All buildings and structures proposed to be constructed and their location on the property;

j. Height of proposed building(s) on the property;

k. Proposed use of each portion of each building on the property;

l. The location and extent of required buffer areas on the property, including the extent of natural vegetation or fences as required;

m. The proposed location of all driveways and entry/exit points for vehicular traffic for the property, using arrows to depict direction of movement;

n. Proposed vehicular traffic circulation patterns within the property and all interior road construction,

using arrows to depict direction of movement;

o. The location of water bodies, water courses, groundwater aquifers, springs, jurisdictional wetlands and other pertinent water features on the property;

p. The location of all test wells and/or borings on the property;

q. The location of the 100-year flood plain, and records of flood, including inundation due to dam break on the property;

r. The location of historic properties and gravesites, including any plans of relocation of graves and properties having historical significance on the property;

s. The location of any archeological sites on the property;

t. The location of all threatened or endangered species of state and federal governments and their habitat on

the property;

u. The location of any cultural facilities such as churches, campgrounds, schools, burial sites on the property;

v. The location of any food crop production areas on the property; and

w. The location of any commercial plant nurseries on the property;

(5) Applicant's erosion and sedimentation control plan and supporting data;

(6) An affidavit from an engineer licensed in the state certifying compliance with the requirements of the Lamar County Soil Erosion and Sedimentation Control Ordinance;

(7) A letter from the Lamar County Water and Sewer Authority verifying whether or not the property has water service with sufficient pressure for the proposed use;

(8) A letter from the Lamar County Health Department verifying that the proposed use is not in violation with the health department's applicable rules, regulations and laws;

(9) A letter from the zoning administrator verifying compliance with the requirements of the Lamar County Watershed Protection Ordinance and Lamar County

Zoning Ordinance;

(10) An operation plan showing how applicant plans to operate the facility, including, but not limited to, hours of operation, number of employees, dust reduction measures, traffic control, screening for the dumping of illegal and prohibited waste,

and noise reduction measures;

(11) A description of the scope of the proposed project, including an estimated schedule of how much and what kinds of waste the facility would accept, where the material would come from, what pretreatment will be required of wastes unacceptable to the facility without such pretreatment, and how long the facility is expected to operate;

(12) A traffic plan describing the method of travel to and from the property from each state and federal highway traversing Lamar County;

(13) A traffic impact and transportation facilities improvement study, including recommendations for access, road and intersection improvements to minimize adverse traffic impacts;

(14) A letter demonstrating access approval from the Georgia Department of Transportation where the facility is to have access on a state road, or from the Lamar County

Public Works Department where facility is to have access on a county road or the applicable city where access is on a city street;

(15) A copy of all permits issued by and through the Georgia Department of Natural Resources, Environmental Protection Division, including, but not limited to, permits issued "by rule." If not yet available, the

applicant should provide copies of permits as soon as possible but before issuance of land development or grading permits;

(16) A letter signed by all signatories of the Lamar County Regional Solid Waste Management Authority setting forth whether or not the facility is compliance with the

joint solid waste management plan;

(17) Evidence of liability insurance coverage with minimum limits of one million dollars ($1,000,000.00) for sudden events and ten million dollars ($10,000,000.00) for

nonsudden events. Such insurance shall cover injury or damage occurring upon the site of the operation and upon properties in the vicinity of the facility as the result of conditions or activities occurring

in connection with the operation of the facility. Such policy shall be filed with the Lamar County Board of Commissioners.

The deductible written into the insurance policy shall not exceed five (5) percent of the per-incident limit of the liability of the policy. The coverage obtained by the owner/ operator to fulfill the requirements of this section shall include the provision that the insurer shall notify the Lamar County Board of Commissioners thirty (30) calendar days prior to the cancellation of the insurance for any reason. The insured

shall provide evidence that ten million dollars ($10,000,000.00) liability insurance is to run for five (5) years subsequent to closure to cover postclosure liabilities.

Also provide a history of any claims against the applicant, owner or operator at any site, including the record of any subsidiary or parent corporation;

(18) A description of emergency procedures and safety and security precautions that will be in use at the facility. This information should include details on emergency assistance and emergency medical treatment that will be required from the area's medical facilities;

(19) A phase I environmental impact study, or any study phase greater as required by the zoning administrator after his/her review of the phase I environmental impact study;

(20) Documentation showing compliance the site location requirements of [sub]section 2-17-74(a)(8) and the Lamar County Zoning Ordinance; and

(21) Any other information that the building and zoning department, zoning administrator, or the board of commissioners may require to properly evaluate the proposed

facility.

(c) Signed and notarized affidavit of all owners, or in the case of a corporation, partnership or association, all officers, directors, managers or

shareholders of five percent or more of stock or financial interest, (hereinafter, "affiant" or "affiants") of the subject property demonstrating the following:

(1) Authorization to file the application for a solid waste handling facility or recovered materials processing facility permit, and where applicable, the signed and notarized affidavit of all affiants authorizing an applicant or agent to act on their

behalf in the filing of the application for such facility permit;

(2) No affiant has intentionally misrepresented or concealed any material fact in the application submitted to the zoning

administrator;

(3) No affiant has been finally convicted in the state or any federal court of any felony involving moral turpitude within thirty

(30) years immediately preceding the application for a permit, excluding those affiants adjudicated pursuant to any applicable first offender Georgia statute;

(4) No affiant has been convicted of any violation of any environmental laws punishable as a felony in any state or federal court within thirty (30) years preceding

the application for a permit, excluding those affiants adjudicated pursuant to any applicable first offender Georgia statute;

and

(5) No affiant has been adjudicated in contempt of any court order enforcing any federal environmental laws or any environmental laws of the state within thirty

(30) years preceding the application for a permit, excluding those affiants adjudicated pursuant to any applicable first offender Georgia statute.

(d) The applicant shall remit application fees as set by the Lamar County Board of Commissioners from time to time so as to reasonably defray the actual cost incurred by the county for review

and evaluation of the application; initially, however, the fee shall be five hundred dollars ($500.00) until amended.

(e) Solid waste generated outside of Lamar County shall not be accepted by any solid waste handling facility for any permitted purpose without the solid waste handling facility property owner(s) and owner(s) of property on which the

solid waste handling facility is operated first having executed a fee agreement with Lamar County.

(Ord. No. 2008-02, § 6, 7-24-08) Sec. 2-17-73. Application review procedure.

(a) Once the completed application, all fees remitted and all documentation as described in section 2-17-72 above has been submitted, the applicant shall provide the zoning administrator with written notice of same. Upon receipt of the applicant's written notice, the zoning administrator shall, within forty-five (45) calendar days, review the application to ensure that all requested information and documentation has been submitted, required fees paid and necessary affidavits have been submitted. Any deficiencies shall be conveyed in writing to the applicant who, after

supplementing the application, shall submit a new notice of completeness letter to the zoning administrator. Nothing in this subsection waives the county's right to deny the application due to its insufficiency.

(b) Should the applicant fail to obtain any of the required documentation enumerated in section 2-17-72 above, the applicant and/or owner in the case of an agent applicant, shall make all

reasonable efforts to obtain the required documentation from the designated authority.

(c) Any action by the zoning administrator to approve or deny an application for a solid waste handling facility or recovered materials processing facility permit shall be taken within one hundred eighty (180) calendar days of receipt of a

completed application. Any solid waste handling facility permit application for which no action has been taken after one hundred eighty (180) calendar days or more shall be deemed to be approved.

(d) The zoning administrator may deny an application that does not comply with any of the provisions of this article, incomplete applications, and applications containing any false material statements by giving written notice to applicant and property owner. Should it be determined that a permit was issued pursuant to an incomplete application or an application containing a false material statement, or that a permit has been erroneously issued in violation of this article, the zoning administrator is authorized to immediately revoke the permit.

(e) Should the zoning administrator deny or revoke a permit, the reasons for the denial shall be stated in writing and mailed by certified mail, return receipt requested, to the address on the permit application, postmarked on or before the one hundred eightieth (180th) calendar day after the zoning administrator's receipt of the complete application, or by hand delivery to the applicant at time of denial.

(f) A permit shall not be denied or revoked except for due cause, being the violation of the provisions of this article, other applicable ordinances, state or federal law, or the submission of an incomplete application or an application containing false material statements.

(g) Any application denied and later resubmitted shall be deemed to have been submitted on the date of resubmission, not the date of the

original submission.

(h) Permits are not transferable from one site or facility to another. In accordance with the Georgia Department of Natural Resources rules and regulations, a permit is transferable to a subsequent operator of the permitted facility provided that a new and completed permit application is submitted to the zoning administrator by the proposed permitted, and the proposed permittee agrees to abide by all permitting conditions, agreements and outstanding orders in effect as of

the date of the new application or thereafter imposed. Proposed permittees shall likewise comply with all transfer requirements of any applicable state or federal agency.

(Ord. No. 2008-02, § 6, 7-24-08) Sec. 2-17-74. Uniform requirements for operation of solid waste handling facilities and recovered materials processing facilities.

(a) In addition to the requirements of this article, the zoning Ordinance, Lamar County Soil Erosion and Sedimentation Control Ordinance, joint solid waste management plan, and any other federal, state or local, ordinance, rule or regulation, all solid waste handling facilities and recovered materials processing facilities shall comply with the following requirements of this section.

For the purposes of this section, the term "facility" shall mean a solid waste handling facility or a recovered materials processing facility.

(1) [Permit.] Applicant shall hold a valid permit from the Georgia Department of Natural Resources and/or U.S. Environmental Protection Agency (EPA), if applicable, to operate the facility.

(2) [Copies of permits.] The applicant shall provide the zoning administrator with a current copy of all applicable permits from the Georgia Department of Natural Resources upon application for a land disturbance permit.

(3) Ingress and egress.

a. The main entrance of the facility shall be located on a paved road with a classification of collector or arterial as shown in the street classification system map of the Lamar County Land Use Plan.

b. The board of commissioners may consider all traffic impact and transportation facilities improvement stud-ies, including, but not limited to,

studies submitted by the applicant pursuant to section 2-17-72, above, and require the applicant to construct or improve a road to accommodate the truck travel necessitated by the operations, as condition of

such operation, and for the purpose of minimizing traffic impacts to residential areas.

c. The facility shall designate at least one (1) entrance-only driveway separate from at least one (1) exit-only driveway in order to mitigate traffic

congestion. All other driveways shall be designed so vehicles will exit the facility in a forward direction.

d. Unless otherwise required by the traffic impact and transportation facilities improvement study, a stop sign shall be erected and maintained

by the owner/operator at all egress roads from the facility.

e. Under no circumstances shall drives or access routes to or from the facility be located within three hundred

(300) linear feet of any existing residential driveway or residential subdivision entrance, as measured along the right-of-way line.

f. The applicant shall construct an acceleration/deceleration lane for entry into the main entrance of the facility consistent with state and

county requirements and standards and post appropriate signage.

g. Vehicles using the facility or operating within the facility shall be covered to prevent blowing of material from the vehicle.

h. All points of vehicular access to the facility shall be locked and secured after normal business hours by means of a gate or other means of security approved by the building and zoning department.

(4) Setback requirements, site barriers, and fencing.

a. No such facility shall operate within one hundred fifty (150) feet of adjoining property boundaries and public highways, except for maintenance of

said one hundred fifty (150) foot set back area including the required berm, security fence, sight barrier, and animal control.

b. A sight barrier shall be provided along all property lines of the site.

Sight barrier shall consist of a onehundred-foot-wide vegetated buffer.

Where natural screening conditions of at least three hundred (300) living trees per acre do not exist, the following shall be planted: evergreen trees, not more than ten (10) feet

apart in staggered rows. Trees shall be at least two (2) inches in caliper, as measured at breast height, and shall be sufficiently spaced to provide an effective sight barrier when ten (10) feet in height. Trees that die

shall be promptly replaced.

c. The facility is to be enclosed by an eight-foot high, chain-link security fence with three (3) strands of barbed wire, angled forty-five (45) degrees toward the outside of the premises to the top. The security fence shall be located no less than one hundred

(100) feet from the property line, along the inside edge of the sight barrier.

d. A planted berm shall be located between the security fence and the facility operations to visually screen

the facility operations, but no closer than twenty (20) feet and no farther than fifty (50) feet from the security fence, as measured from the base of the berm. The berm shall consist of the following: a grassed berm six (6) feet in height and planted with evergreen trees not more then ten (10) feet apart, in staggered rows on the

berm. Trees shall be at least two (2) inches in caliper, as measured at breast height, and shall be sufficiently spaced to provide effective sight barriers when ten (10) feet in

height. Trees that die shall be promptly replaced.

e. All entrances shall have an eightfoot-high gate, which shall be closed and locked at all times that the facility is not open.

(5) Documentation. Written logs shall be maintained of persons who deposit solid waste or recovered materials into the facility

including their name, the date, make, model and license plate of the vehicle, time in and time out, and a description of the material that is being dumped.

(6) Hours of operation. Facility hours of operation shall be limited to 9:00 a.m. to 6:00 p.m., Monday through Saturday. A sign

clearly indicating the hours of operation and prohibiting dumping at all other times shall be placed in a conspicuous location at all entrances.

(7) Safety.

a. Applicant shall use extreme care and take all available precautions to insure that prohibited waste is not dumped into the facility.

b. Suitable means shall be provided at the facility to prevent and control fires. Stockpiled soil is considered to be a satisfactory fire fighting material.

(8) Siting: proximity and expansion.

a. No portion of a facility shall be located within one thousand (1,000) feet of any of the following preexisting uses: schools, day cares, churches, hospitals, retirement

homes, personal care homes, or subdivisions of record consisting of residential dwellings for which a final plat has been approved and filed

with the Lamar County Superior Court Clerk. The distance shall be measured by a straight line from the property boundary of the facility to the property boundary of the aforementioned use.

b. Any new facility or expansion of an existing facility shall be located either contiguous to an existing facility, or entirely outside of a ten-mile radius of any existing facility, as

measured in a straight line from the property boundaries of the existing facility.

c. No portion of a new facility or expansion of any existing facility shall be located within a one-mile radius

which contains fifty (50) or more residential dwellings. The one-mile radius shall be measured in a straight line from the boundary of the property to be used for a facility. For purposes of this paragraph, a residential dwelling shall include double wide, dwelling, cluster dwelling, condominium, garden apartment, multiple-family dwelling, patio dwelling, single-family attached, singlefamily detached, townhouse, twofamily dwelling, factory built housing, industrialized home, manufactured

home (including class A, B & C), mobile home, modular homes, multisection home, prefabricated homes, sectional home and single wide; all as defined in section 203 of the Lamar County Zoning Ordinance. This paragraph does not apply, however, to a facility to be located contiguous to an existing Facility as provided under subparagraph b. above.

(9) Nuisance abatement.

a. Air pollution, noise, and vibration, and their effects upon adjacent property owners shall be minimized by the use of adequate soundproofed

equipment and buildings designed to accomplish such minimization and approved by the board of commissioners, and by the proper use of berms, walls, and natural planting screens.

Interior and adjoining roads used in the operations shall have their surfaces treated to minimize air pollution, noise and vibration.

b. Rodent traps shall be placed one hundred (100) yards apart around the perimeter of the facility, inside the security fence, and shall be inspected and cleaned not less than once per day.

c. Any security lighting deemed necessary by the owner/operator shall be the sodium-vapor type and shall be

aligned so that no part of the illuminated field falls on adjacent property.

d. Every facility shall, at its own expense, connect to a public water supply and install at least one (1) outlet every two hundred (200) to four hundred (400) linear feet, as determined by the Lamar County Fire Chief,

along the perimeter of the facility's operational area in order to ensure adequate water supply and facilities for quick delivery of water to any part of the property for the purpose of extinguishing fires. Capacity shall be such that at least fifty (50) gallons of water per minute can be applied to any fire, continuously, for at least ten (10) hours. The source of the water supply and facilities to provide for the delivery of the water shall be indicated on the plans submitted for approval to the board of commissioners.

(Ord. No. 2008-02, § 6, 7-24-08) Sec. 2-17-75. Operation standards particular to solid waste handling facility and recovered material processing facility categories.

(a) [Compliance with standards, etc.] All federal, state and local statutes, ordinances and rules and regulations, as applicable, shall be met

pertaining to the operation of inert landfills, municipal solid waste landfills and construction and demolition (C&D) landfills. Moreover, operations

of said landfills shall be consistent with the joint solid waste management plan for Lamar County and the City of Milner.

(b) Materials recovery facility (MRF) and recovered materials processing facility standards.

(1) All recyclable materials shall be stored in containers with no stockpiling outside the containers.

(2) Collection, storage containers, or receptacles shall not be allowed in buffer areas.

(3) The sorting, extraction and other processing of recyclable materials shall be done within a fully enclosed building.

(4) A maximum continuous sound level of sixty-five (65) dBA and a maximum peak sound level of seventy-five (75) dBA shall not be exceeded at property lines of adjacent property.

(5) Collected materials shall not be disposed on or in the property on which the materials recovery facility (MRF) or recovered materials processing facility is located.

However, an MRF or recovered materials processing facility may be operated in conjunction with a sanitary landfill.

(6) The materials recovery facility or recovered materials processing facility shall be sited and operated in accordance with

applicable state and federal statutes, rules and regulations as well as the joint solid waste management plan for Lamar County and the City of Milner.

(c) Transfer station standards.

(1) Solid waste brought to a transfer station shall not be disposed of on or in the property on which the transfer station is located. However, a transfer station may be operated in conjunction with a sanitary landfill or recovered materials processing facility.

(2) Transfer stations shall be sited and operated in accordance with applicable state and federal statutes, rules and regulaSOLID WASTE AND RECOVERED MATERIALS § 2-17-75 tions as well as the joint solid waste

management plan for Lamar County and the City of Milner.

(d) Incinerator standards.

(1) Solid waste must be burnt for not less than thirty (30) minutes at a temperature sufficient to reduce the solid waste to ash, followed by burial in a sanitary landfill.

(2) The operator of the incinerator must date and initial time/temperature records for each batch of solid waste. Said records are to be made available upon request.

(3) An incinerator may be operated in conjunction with a sanitary landfill or recovered materials processing facility.

(4) Incinerators shall be sited and operated in accordance with applicable state and federal statutes, rules and regulations as well as the joint solid waste management plan for Lamar County and the City of Milner.

(Ord. No. 2008-02, § 6, 7-24-08) Sec. 2-17-76. Closure of sanitary landfills.

(a) The owner/operator shall comply with all applicable state and federal statutes, rules and regulations pertaining to closure and postclosure.

(b) Notice of final closure shall be provided to the zoning administrator within thirty (30) calendar days of receiving the final load of waste. Any site not receiving waste for in excess of one

hundred eighty (180) calendar days shall be deemed abandoned and in violation of this article unless properly closed. Notice of closure shall include the date of final waste receipt and an accurate legal description and plat of survey of the boundaries of the sanitary landfill area and property boundaries.

(c) Notice that the property has been used as a sanitary landfill shall be filed in the office of the Lamar County Superior Court Clerk within thirty

(30) calendar days of closure. Said notice shall include notice that the property was used as a sanitary landfill, the date the sanitary landfill operation commenced and terminated, an accurate legal description and plat of survey of the actual location of the landfill area, and a description of the type of solid wastes which have been deposited in the landfill. Concurrent with the

submission of notice of final closure to the zoning administrator, the owner or operator shall submit to the zoning administrator a recorded copy of said notice.

(d) All deeds for real property which have been used for sanitary landfilling shall include notice of the sanitary landfill operations, the date the sanitary landfill operation commenced and terminated, an accurate legal description and plat of survey of the actual location of the sanitary landfill disposal area, and a description of the types of solid waste which have been deposited in the

landfill. Concurrent with the submission of notice of final closure to the zoning administrator, the owner or operator shall submit to the zoning administrator confirmation that the information required in this section has been noticed on the property deed.

(Ord. No. 2008-02, § 6, 7-24-08) Sec. 2-17-77. Appeal.

(a) Any appeal of a decision by the building and zoning department, zoning administrator, or other county official regarding this article shall be presented in writing to the board of commissioners within fifteen (15) calendar days of the decision of said county official(s). The appeal shall set forth with particularity the specific violation(s)

that occurred, reference all applicable section(s) of this article, any other county ordinance, state or federal law, regulation, etc., give the name of the alleged violator, and provide a statement of the decision being appealed as well as the remedy sought by the appellant.

(b) The county administrator shall review the written appeal and schedule a hearing at either a regular or specially called board of commissioners meeting, provided that said hearing is held no sooner than thirty (30) calendar days and no later than sixty (60) calendar days from the date of the filing of the appeal. Notice of the hearing of the appeal shall be provided in the same manner as public hearings are noticed for rezonings initiated by the county under the zoning ordinance.

(c) The board shall review the appeal on the basis of the documentation provided as part of the written appeal and any relevant evidence submitted by county staff or the applicant at the public hearing.

(d) The laws and regulations of Lamar County, the state and federal governments, and decisions made by county official(s) are presumed to be valid. It shall be the responsibility of an applicant seeking relief to assume the burden of proof and rebut the presumption by presenting clear and convincing evidence to explain how the law, regulation, action or decision is in error and how the applicant's proposed action is consistent with the

provisions of this article.

(e) It is the duty of the board to review such facts and evidence in light of the provisions of this article to balance the public health, safety and general welfare against the injury to a specific applicant that would result from the strict application of this article to the property.

(f) The board may consider whether strict application of this article would create an unnecessary or undue hardship, but only if the hardship is not the result of action taken by the applicant,

owner or a previous owner. Any resulting remedy proposed by the board of commissioners shall be the minimum necessary to relieve the applicant of the hardship.

(g) After reviewing an appeal filed in accordance with this article, the board may take any of the following actions:

(1) Affirm the decision below;

(2) Refer the matter back to the decisionmaker for reconsideration as to any specific criteria enumerated in this article;

(3) Grant the applicant's petition;

(4) Grant the applicant's petition with conditions regarding the use of the property, or the facilities, improvements or activities

thereon.

(h) Any person aggrieved by a decision of the board of commissioners pursuant to this article may appeal to the Superior Court of Lamar County by writ of certiorari as provided by law.

(Ord. No. 2008-02, § 6, 7-24-08) Chapter 2-18

TRAFFIC*

Sec. 2-18-1. Traffic signs, signals, etc.

The erection and location of all traffic control signs, signals, devices and markings which are in place on the adoption date of this Code are ratified and approved by the board of commissioners.

Sec. 2-18-2. Use of radar detection devices to enforce traffic laws in the City of Milner.

The sheriff of Lamar County, Georgia, and any and all of his certified, licensed deputies are authorized to perform and do all acts necessary to assist the City of Milner, Lamar County, Georgia, in the use of radar detection devices in enforcing the traffic laws in said City of Milner, Lamar County, Georgia.

(Res. of 2-24-88) Sec. 2-18-3. Speed zones established.

The following speed zones are established:

ON-SYSTEM

State Route Within the City/ Town Limits of and/or School Name From Mile Point To Mile Point Length in Miles Speed Limit SR 7 Monroe County Line

0.00 A point 845 feet northwest of State Route 18 (Southeast Barnesville City Limit)

8.28 8.28 55 SR 7 *** A point 50 feet northwest of Yatesville Road/Murphey Avenue (Barnesville City Limits)

8.96 A point 740 feet northwest of Yatesville Road/Murphey Avenue (Barnesville City Limits)

9.09 0.14 45 SR 7 A point 4,750 feet south of State Route 36 (North Barnesville City Limit)

11.58 A point 580 feet southeast of Old Highway 41 (Southeast Milner City Limit)

14.22 2.75 60 SR 7 MILNER A point 580 feet southeast of Old Highway 41 (Southeast Milner City Limit)

14.22 A point 475 feet northwest of Zebulon Street (Northwest Milner City Limit)

15.66 1.44 60 SR 7 A point 475 feet northwest of Zebulon Street (Northwest Milner City Limit)

15.66 Pike County Line 19.09 3.43 60 SR 18 Pike County Line 0.00 A point 704 feet west of Trojan Way (West Barnesville City Limit)

4.52 4.52 55 SR 18 Runs common with State Route 7 from MP 5.07 to MP 7.10 State

Route Within the City/ Town Limits of and/or School Name From Mile Point To Mile Point Length in Miles Speed Limit SR 18 State Route 7 7.10 A point 1,637 feet south of Gordon Road (a South Barnesville City Limit)

7.81 0.71 55 SR 18 A point 310 feet North of Gordon Road (a South Barnesville City Limit)

8.18 A point 1,585 feet north of Gordon Road (a South Barnesville City Limit)

8.42 0.24 55 SR 18 A point 1,265 feet east of Forsyth Street (North Barnesville City Limit)

9.19 Monroe County Line

13.95 4.76 55 SR 36 Upson County Line 0.00 State Route 7 4.19 4.19 55 SR 36 Runs common with State Route 7 from MP 4.19 to MP 7.22 SR 36 State Route 7 7.22 Butts County Line 19.14 11.92 55 SR 401 Monroe County

Line

0.00 Butts County Line 2.68 2.68 70 Signs on state routes to be installed by the Georgia Department of Transportation.

***Indicates distance is too short for use of radar detection devices and is listed for signing purposes only.

OFF-SYSTEM

Road Name Within the City/ Town Limits of and/or School Name From To Length in Miles Speed Limit Abbott Road State Route 7 Upson County Line 2.19 45 Adkins Road Johnstonville Road Fredonia Church Road 0.47 35 Aldora Street State Route 18 Barnesville City Limit 1.26 35 Barnesville Avenue Aldora Street Grove Street 0.72 35

Barnesville Road State Route 36 Spalding County Line 1.99 55 Bottoms Road State Route 36 City Pond Road 1.99 35

Brent Road State Route 7 Monroe County Line 5.28 45 Brooks Road Johnstonville Road Bottoms Road 3.30 45 Brown Springs Road Old Highway 41 Skinners By-pass 0.53 35 Burnette Road Barnesville City Limit Cannafax Road 1.23 45 Bush Road Fredonia Church Road State Route 18 4.47 45

By-Pass Road Yatesville Road Abbott Road 0.44 45 Camp Road South Sixth Street Extension Spalding County Line 1.28 45 Cannafax Road Berry Road Old Milner Road 3.45 45 Chappell Mill Road High Falls Park Road Butts County Line 3.87 45 Church Street Aldora Street Barnesville Avenue 0.51 35

Community House Road State Route 7 Brent Road 5.18 45 Cook Road Spalding County Line Cook Road 1.41 45 Road Name Within the City/ Town Limits of and/or School Name From To Length in Miles Speed Limit Country Kitchen Road State Route 36 Freeman Road 2.36 45 County Line Road South Sixth Street Extension Spalding County Line 1.38 55 Crawford Road Johnstonville Road Howard Road 1.23 45 Eady Creek Road City Pond Road State Route 36 2.70 35 English Road High Falls Park Road End of Pavement (Monroe County Line)

3.28 45 Ethridge Mill Road Zebulon Road McLean Road 2.20 45 Evans Road Old Highway 41 Weldon Lake Road 1.41 45 Fawn Road McKenzie Road Tom Bell Road 1.30 35 Fellowship Drive Old Highway 41 Old Milner Road 0.83 45 Five Points Road U.S. Highway 41/State Route 7 Zebulon Road 1.0 35 Five Points Road Zebulon Road State Route 18 3.67 45 Fredonia Church Road Brent Road State Route 18 2.90 45 Fredonia Church Road State Route 18 Johnstonville Road 1.44 45 Freeman Road State Route 36 Country Kitchen Road 1.61 45 Forsyth Yatesville Road State Route 7 Monroe County Line 2.80 45 Gordon Road Fredonia Church Road Barnesville City Limit 1.10 45 Grape Creek Road Martin Dairy Road Zebulon Road 1.45 45

Grove Street Old Milner Road Barnesville City Limit 2.10 35 High Falls Park

Road State Route 36 Chappell Mill Road 0.52 45 High Falls Park Rd Chappell Mill Road Monroe County Line 3.94 50 High Falls Road Chappell Mill Road Monroe County Line 4.56 45 Holloway Road Williams Road End of Pavement 0.81 35

Howards Road State Route 36 Crawford Road 1.19 35 Hoyt Road McKenzie Road Cauthen Road 0.62 35 Industrial Drive State Route 7 Grove Street 1.82 45 Ingram Road Ramah Church Road Monroe County Line 2.30 45 Jackson Road Barnesville City Limit State Route 36 1.00 55 Johnstonville Road Barnesville City Limit Monroe County Line 6.99 45 Lamar County Line

Road Old Highway 41 Cook Road 1.45 45 Lanette Circle Johnstonville Road End of Pavement 0.43 35 Ledbetter Road State Route 7 Brent Road 0.36 35

Liberty Hill Road State Route 36 East Milner City Limits

2.12 45 Liz Acres Road State Route 7 Jackson Road 0.37 25 Martin Dairy Road State Route 7 Ethridge Mill Road 1.48 45 Matthews Road Milner City Limit Silver Dollar Road 0.62 45 McCollum Road Abbott Road Yatesville Road 0.76 35

McCollum Road State Route 36 Country Kitchen Road 1.35 35 McKenzie Road Milner City Limits Old Highway 41 2.77 45

McKneely Road Morgan Dairy Road Spalding County Line 1.91 45 McLean Road State Route 7 Pike County Line 0.25 35

Midway Road State Route 36 Upson County Line 1.14 45 Road Name Within the City/ Town Limits of and/or School Name From To Length in Miles Speed Limit Morgan Dairy Road State Route 36 Old Highway 41 4.65 45 North Ridge Road Van Buren Road Johnstonville Road 2.32 45 Old Highway 41 State Route 7 (South) State Route 7 (North) 1.89 45 Old Highway 41 Milner City Limits Spalding County Line 4.22 45 Old Alabama Road Liberty Hill Road Old Highway 41 1.22 45 Old Milner Road State Route 18 Cannafax Road 0.84 35

Old Milner Road Cannafax Road Milner City Limits 2.63 45 Parker Branch Road Chappell Mill Road High Falls Park Road 2.04 45 Piedmont Road Pike County Line State Route 18 5.30 45 Phillip Weldon Road Old Highway 41 South Sixth Street Extension

2.22 45 Ponderosa Lane Midway Road End of Pavement 0.71 30 Ramah Church Road A point 655 feet east of State Route 18 (South Monroe County Line) Monroe County Line 8.56 45 Roberts Road Johnstonville Road Bush Street 0.57 30 Rock Springs Road Chappell Mill Road High Falls Road 0.99 35 Rogers Circle Cannafax Road Warner Road 0.91 25

Ruffner Road Piedmont Road Pike County Line 0.98 45 Sanders Road Chappell Mill Road Spalding County Line 1.37 45 Sappington Road Community House

Road Ramah Church Road 1.40 35 Silver Dollar Road State Route 7 A point 6,495 feet north of State Route 7

1.23 35 Skinner's By-Pass Trice Road Brown Springs Road 1.34 35 Skyler Road Milner City Limit Weldon Lake Road 0.44 45 Steele Road Liberty Hill Road A point 0.47 miles north of Liberty Hill Road

0.47 35 South Sixth Street Extension New Hope Road Spalding County Line 2.96 55 The Rock Road Piedmont Road Upson County Line 0.87 45 Tom Bell Road Yancey Road Milner City Limit 1.34 35 Trice Road State Route 7 McKenzie Road 2.01 45 Van Buren Road Johnstonville Road State Route 36 5.83 45 Weldon Lake Road Old Highway 41 Morgan Dairy Road 2.75 45 Willis Road State Route 7 Upson County Line 0.52 35

Willis Road The Rock Road Upson County Line 1.73 45 Yancey Road Old Highway 41 McKenzie Road 0.64 35 Yatesville Road Upson County Line Barnesville City Limit 3.39 45 Zebulon Road State Route 7 Pike County Line 2.90 45

Zellner Road State Route 7 Ramah Church Road 1.09 30 Zellner Road Ramah Church Road Forsyth-Yatesville Road

1.1 45 Lamar County will be responsible for proper speed zone sign placement on non-state route roadways corresponding to this list as well as any advisory speed warning signs roadway conditions warrant.

(Ord. No. 9-95-171, 10-17-95; Ord. No. 897-171, 9-2-97; Ord. of 7-16-19; Ord. No. 2023-13, § 1, 8-15-23;

2023-22, § 1, 12-19-23)

CHAPTER 2-19

UTILITIES

ARTICLE I. WATER

DIVISION 1. GENERALLY

Sec. 2-19-1. Definitions.

Authority shall mean the members of the Lamar County Water and Sewer Authority, its successors, agents and employees.

Consumer shall mean any person, corporation, company, partnership, organization (whether for profit or not), association, venture, public body, public agency, public authority, or other entity that uses, has use of, has use for, or seeks to use water furnished by the authority.

County shall mean the governing body of Lamar County, Georgia, and its successors, agents, and employees.

Customer shall mean any consumer or developer who desires to receive water services from the authority and who has satisfied the reasonable conditions of the authority to receive said services.

Developer shall mean any person, corporation, company, partnership, organization (whether for profit or not), association, venture, public body, public agency, public authority, or other entity which purchases or owns property for the purpose of dividing, developing, and reselling at least a portion of the same (whether for residential, commercial, and industrial uses).

Subdivision shall mean any property divided by a developer for the purpose of developing and reselling at least a portion of the same (whether for residential, commercial, or industrial uses).

No property shall meet the definition of the term "subdivision" for the purposes of this chapter unless the same has been properly platted and recorded of record according to the applicable ordinances of Lamar County, Georgia.

(Ord. of 2-5-02, Art. I) Sec. 2-19-2. Access to private property by agents and employees of the authority.

Duly authorized agents and employees of the authority shall have access at all hours to the property and premises of consumers and developers for the purposes of installing and removing the property of the authority, inspecting the

authority's facilities, reading and testing meters, and repairing and maintaining the facilities of the authority.

(Ord. of 2-5-02, Art. II) Secs. 2-19-3—2-19-24. Reserved.

DIVISION 2. WATER SERVICE

Sec. 2-19-25. Water service where no extension is required.

(a) Application. Any consumer or developer desiring to be provided water services by the authority to property owned by that consumer or developer shall make an application for water services in person at the offices of the authority or at such other place as the authority may designate from time to time. The owner (whether consumer or developer) of the property to be

served shall be responsible for filling out and providing the authority with a completed application.

(b) Water services to consumer with no extension. If the water distribution system:

(1) Is adjacent to a consumer's property and no water line extension is required, service will be provided upon the consumer executing the water subscription contract

and payment of the connection fees.

(2) Is across the road from a consumer's property, service will be provided upon the consumer executing the water subscription contract, receipt of payment from the consumer for the boring, easing and pipe

to cross the road, and receipt of payment from the consumer of the connection fees.

(c) Water services to developer with no extension.

(1) If the water distribution system is adjacent to a developer's property (as described in the vesting deed before subdivision), service will be provided to the nearest property line of the developer's

property (as described in the vesting deed before subdivision) so long as the property (as planned for development) has been properly deeded, zoned, subdivided into a platted subdivision and recorded of record as a subdivision (whether commercial, industrial, or residential) according to the laws of the State of Georgia and the ordinances of Lamar County; and so long as the developer has executed a water subscription contract and has paid the applicable connection fees.

If the water distribution system is directly across the road from a developer's property, service will be provided according to the provisions above, with the addition of the developer paying for the boring, casing and pipe to cross the road.

(2) A developer shall, at his, her or its sole cost, extend water lines into each subdivision so that the line will serve each lot developed therein.

(3) Any property owner (not otherwise meeting the definition of developer) who purchases a subdivided plot of property from a developer that has extended water lines

into a subdivision shall be considered a consumer for the purposes of this section.

(d) Waiting list. Once a consumer or developer complies with the above-stated terms, that customer will be placed upon the authority's meter installation waiting list. Thereafter, the authority

will install a meter and commence service as soon as is practicable.

(Ord. of 2-5-02, Art. III) Sec. 2-19-26. Water line extensions.

(a) Generally. Initially, when public funds are available and a need for expansion arises, in the sole discretion of the authority, the authority will extend water lines throughout the county in the order established by a priority road list adopted by the authority. The priority road list shall be based upon a balance of sound engineering and the goal of expansion of service to most possible consumers and developers. A current road priority list shall be maintained by the authority and made available to the public for inspection. Said

priority list may be changed, from time to time without notice, at the sole discretion of the authority.

During the initial extension of water lines throughout the county and thereafter, extension of water lines at the request of a consumer or developer

shall be governed by the provisions of this section.

(b) Water service to residential consumers requiring line extensions.

(1) Generally. Water lines may be extended along county roads which have a minimum dedicated right-of-way of sixty (60) feet, or along presently existing county

roads where easements acceptable to the authority for the installation and maintenance of the water line have been obtained at no expense to the authority.

(2) Application. Any residential consumer wishing to have water lines extended to their property shall make an application for water services in person at the offices of the authority or at such other place as the authority may designate from time to time.

(3) Application fee. Prior to the commencement of construction, the residential consumer to whose property water lines are to be extended shall pay a sum estimated

by the authority per linear foot of water line (of sufficient capacity to service the residential consumer) installed from the authority's existing line to a point perpendicular to the residential consumer's residence (or, in the case of planned but not yet constructed residences, to a point perpendicular to where the residence is planned to be constructed). The estimated

sum shall be sufficient to cover all costs associated with design, materials, and construction involved in the extension.

Installations over rock and wetlands are impossible to estimate and will be charged at cost.

i. In its sole discretion, the authority may establish a program by which the residential consumer may finance the cost of the extension over a set period of time. In such instances, the residential consumer would make regular payments as

part of the monthly water billing.

ii. In the event that it becomes apparent to the authority that the cost of extension of water lines to a residential consumer exceeds the charged estimate, the authority may immediately terminate work on the extension until such time as the residential consumer pays (or agrees to pay under subsection i. of this section)

such additional funds as are necessary.

iii. In the event that it becomes impossible, in the authority's sole discretion, to install water lines to a residential consumer, the authority shall refund the application fee provided

for in this section.

(4) Additional obligations. In addition to all other obligations placed upon a residential consumer by this chapter or other applicable law, prior to the authority approving any residential consumer's application for the extension of water lines and water services, the residential consumer

shall:

a. Obtain such right-of-way deeds and/or easements as are required by the county and/or the authority;

b. Execute the line extension petition provided by the authority;

c. Pay the water line extension fees described in subsection (b)(3);

d. Pay the applicable connection fee;

e. Execute a water subscription contract.

(5) Approval by authority. Once the application has been completed, it will be submitted to the authority for approval. If the application is approved by the authority,

an estimated date of completion will be given to the residential consumer; however, a date of completion cannot be guaranteed due to changes in work schedule, weather conditions, equipment breakdown, delays in delivery of materials, improvement of right-of-way or other unpredictable circumstances.

(c) Water services to residential developers requiring line extensions.

(1) Generally. If a water line extension is to serve a developer's residential subdivision development, the developer shall, in addition to obligations set forth in subsection (b) above (regarding residential consumers requiring line extensions), submit to the authority the following:

a. An application for line extension;

b. Three (3) copies of a plat or accurate drawing of the property to be served.

The plat or drawing shall contain the following information:

i. Location of the closest existing water line of the authority which is of sufficient size to serve the property;

ii. Location of the existing roads and proposed roads to serve the property;

iii. An exact footage measurement of water line required to be installed in order to serve the property;

iv. Location of all water lines and appurtenances to be constructed in the area to be developed.

c. The required water line extension fee.

(d) Water services to industrial and commercial developers requiring line extensions.

(1) Generally. If a water line extension is to serve a developer's industrial or commercial development, the developer shall, in addition to obligations set forth in subsection (b) above (regarding residential consumers requiring line extensions), submit to the authority the following:

a. Line extension application to serve industrial/commercial development;

b. A letter from the Lamar County Planning and Zoning Board stating that the property has been properly zoned

for the proposed use;

c. Three (3) copies of a plat or accurate drawing of the property to be served.

The plat or drawing shall contain the following information:

i. Location of the closest existing water line of the authority which is of sufficient size to serve the property;

ii. Location of the existing roads and proposed roads to serve the property;

iii. An exact footage measurement of water line required to be installed in order to serve the property;

iv. Location of all water lines and appurtenances to be constructed in the area to be developed;

v. Estimated daily consumption.

d. The required water line extension fee.

(2) Additional lines. if units served will require fire lines and/or sprinkler systems to the structure, expenses for same shall

be borne by the developer.

(e) Water line services inside residential subdivisions, industrial sites and commercial sites.

(1) Generally. It shall be a developer's responsibility to construct and complete water systems inside all residential, industrial,

and commercial subdivisions, as well as all industrial and commercial sites. The developer shall:

a. Submit the required application to the authority for its approval;

b. Pay for all labor and materials necessary to construction of the water line inside the area to be developed,

which cost shall include supply lines, fire hydrants, tees, gate valves, reducers and regulators, together with all meter service connection material, including corporation and curb stops, wyes, inserts and service lines

to meters, and any other pertinent structure that may be needed for proper construction of said lines and appurtenances thereto;

c. Construct all water lines according to plans and specifications of the authority.

(2) Additional obligations. Upon completion of the construction of the water lines into the subdivision, but prior to commencement of water services by the authority, a developer shall:

a. Execute an affidavit stating the actual cost of all labor and materials expended in the construction of all

water lines and appurtenances thereto;

b. Execute a deed conveying the water line, appurtenances thereto, and a 20-foot permanent easement to the authority;

c. Post a surety bond or letter of credit from a banking institution located within the State of Georgia with the authority in the amount of ten (10) percent of the total cost of construction of said line which said bond or letter of credit shall guarantee payment to the authority for any repairs or maintenance needed in said line

over a period of one (1) year from date of conveyance of said line;

d. Submit three (3) copies of "as-built" plans of said water lines and appurtenances thereto showing the exact location of the water lines and appurtenances thereto;

e. Execute an affidavit prescribed by the authority stating that the cost of all labor and material has been paid in full;

f. Pay the required connection fees set forth in this chapter.

(Ord. of 2-5-02, Art. IV) Sec. 2-19-27. Water subscription contracts required.

Prior to commencement of water service by the authority each consumer and/or developer wishing to become a customer of the authority must execute a water subscription contract with the

authority.

(Ord. of 2-5-02, Art. V) Sec. 2-19-28. Charges for initial water service.

(a) Definitions. For the purposes of this section, the following terms shall be defined as follows (said definitions shall not limit the meaning of the same terms found elsewhere herein):

(1) Construction of water lines. The placing of water lines and the burial thereof in connection with the original line extension project as determined by the authority.

(2) Defined service area. The area in which the authority has extended water lines and is currently, or in the future plans to, serve the citizens of Lamar County with water, as that area is defined, from time to time, by said authority.

(b) Water connection fees.

(1) Consumers.

a. For each connection before construction of water lines:

3 11 11

b. For each connection after construction of water lines:

3 11 11

(2) Developers. For each connection where developer installs line at no charge to the authority:

3 11 11

(c) Relocations. Any relocation of waterlines, appurtenances, fire hydrants, or the like requested by the customer or required by the authority will be billed to the customer at the actual cost of the removal or relocation of each of said

items. An additional ten-percent fee shall be charged for administrative expenses.

(d) Duplexes, quadraplexes, apartments, mobile home parks and mobile home subdivisions. A duplex, quadraplex, apartment building, or mobile home park shall have a meter installed for each unit and the prevailing tap-on fee shall be

paid for each unit. A master meter may be installed at the owner's request and cost.

(e) Professional buildings. A professional building shall have a meter installed for each unit and the prevailing tap-on fee shall be paid for each

unit.

(f) Security deposits. A fifty dollar ($50.00) security deposit shall be collected for water from all consumers who rent for residential purposes.

A one hundred dollar ($100.00) security deposit shall be collected from all consumers who rent for commercial purposes. Security deposits for industrial renters shall be charged on a case-by-case basis.

(g) Unpaid bills. Property owners shall be responsible for any unpaid water bills.

(Ord. of 2-5-02, Art. VI) Sec. 2-19-29. Authority's responsibilities and liabilities.

(a) Upon a customer meeting all requirements as may be promulgated by the authority, the authority will run a water distribution line to the property of said customer.

(b) The authority may, at its sole option, install its meter at or near the property line, or on the customer's property within three (3) feet of

the right-of-way.

(c) The authority reserves the right to refuse service to any customer whose lines and/or pipings are not installed in such a manner as to prevent cross connections and/or backflow.

(d) Under normal conditions a customer will be notified of any anticipated interruptions of service by the authority.

(Ord. of 2-5-02, Art. VII) Sec. 2-19-30. Customer's responsibilities and liabilities.

(a) Water furnished by the authority shall be used for consumption by the customer, members of his household and employees only, except for customers using master meters as provided in this section, in which case, water furnished by the authority shall be used by those lawfully connected to the master meter only. Customers shall not sell water to any other person or permit any

other person to use said water. Customers shall not allow anyone else to connect onto the water system serving the customer without the express written consent of the authority. Water shall not be used for irrigation, fire protection, or other purposes, except when water is available in sufficient quantity without interfering with the regular domestic consumption in the area served.

Violation of this subsection shall be sufficient cause for refusal and/or termination of service.

(b) The customer shall have the following additional responsibilities and duties:

(1) Where a meter or meter box is placed on the premises of a customer, a suitable place shall be provided by the customer therefor, which is unobstructed and accessible at all times to the authority or its designee.

(2) The customer shall furnish and maintain a private cutoff valve on the customer's side of the meter.

(3) The customer's piping and apparatus shall be installed and maintained at the customer's expense so as to prevent backflow.

(4) In order to be received as a customer and entitled to receive water from the authority's water system, all applicants must offer proof that any private wells located on their property are not physically connected to the lines of the authority's water system; and all applicants, by becoming customers of the authority, covenant and agree that, so long as they continue to be customers of the

authority, they will not permit the connection of any private wells to the authority's water system.

(Ord. of 2-5-02, Art. VIII) Sec. 2-19-31. Turning on or connections to authority's water by persons other than authority personnel.

Only authorized authority personnel, or such qualified persons as are specifically designated by the authority, can connect or tap on to the authority's water distribution system. No customer, consumer, developer, person, or entity will be authorized to connect or tap on to any water

distribution system owned by the authority or on to any water lines carrying water owned by the authority. Violation of this provision of this article shall authorize the authority to immediately terminate water services without notice to the violating customer.

(Ord. of 2-5-02, Art. IX) Sec. 2-19-32. Rate schedules.

(a) Generally. All water rates for the customers of the authority shall be set from time to time by the authority without requirement of approval

by the county. However, water rates will not increase without ten (10) days notice to the customer. Notice will be sufficiently given to the customer by a publication of the rate changes

once in the official newspaper of Lamar County prior to the rate increase.

(b) Water rates.

(1) The water rates for residential, industrial and commercial customers with a meter of one (1) inch or less shall be as follows:

a. For the first one thousand (1,000) gallons used, whether or not any water is used at all, there shall be a minimum charge of fifteen dollars ($15.00).

b. For any usage over one thousand (1,000) gallons, there shall be a charge of three dollars thirty-five cents ($3.35) per thousand (1,000) gallons, rounded to the next thousand (1,000).

(2) The minimum monthly charge for water meters in excess of one (1) inch in diameter for residential, industrial and commercial customers shall be as follows:

Water Meter Size Fee

(a) 11 /2-inch $21.00

(b) 2-inch 75.00

(c) 3-inch 160.00

(d) 4-inch 200.00

(e) 6-inch 350.00

(f) 8-inch 425.00

(g) (Above 8 inches) (Set by the authority)

(3) The fire line monthly minimum rates for industrial and commercial customers shall be as follows:

Water Fire Line Size Rates

(a) 4-inch $8.00

(b) 6-inch 10.00

(c) 8-inch 15.00

(d) 10-inch 20.00

(e) (Above 10 inches) (Set by the authority) (Ord. of 2-5-02, Art. X) Sec. 2-19-33. Meter readings.

The water meter serving a customer's property shall be read on a monthly basis by the authority or its designee and official records of each reading thereof shall be kept for a period of one (1) year.

(Ord. of 2-5-02, Art. XI) Sec. 2-19-34. Billing and collection.

(a) Generally. The costumer shall pay promptly on a monthly basis for all water registered by the meter serving said property at the rate or rates set by the authority from time to time, which shall include water used and water wasted (including by leakage), except for water that may be traced by the authority to the authority's system.

Failure to pay a water bill creates an automatic lien of record in favor of the authority against the property to which the water services are being provided. Said lien may be foreclosed in the same manner as any other lien against real estate as provided by law.

(b) Bills. The authority or its designee shall generate and provide each customer with a bill each month for water used. Said bill shall be paid within fifteen (15) days from the date of said bill.

In the event that the charges assessed thereon are not paid within twenty (20) days from the date of said bill, the authority shall charge a late fee of one and one-half (1.5) percent interest on the outstanding amount from the twenty-first (21st) day from the date of said bill until water service is terminated, and shall have the right to commence procedures to terminate water services.

(c) Bad checks. Customers who make payments with checks that are not covered with sufficient funds in the depository upon which they

are drawn shall be charged a "bad check fee" as shall be set by the authority. Initially, the bad check fee shall be fifty dollars ($50.00). This fee may be amended by resolution of the authority from time to time and any such amendment shall become effective upon publication of notice thereof in the official organ of Lamar County for one (1) week. In its sole discretion, the authority may require any customer whose check has been returned for insufficient funds to pay monthly water bills and all other charges assessed by the authority in cash or certified funds.

(d) Resumption of discontinued service. If water service is discontinued for nonpayment, the authority shall not resume water service to the

violating customer until the bill and all penalties have been paid in full and a twenty-five dollar ($25.00) nonrefundable service fee has been paid to the authority by the violating customer.

(Ord. of 2-5-02, Art. XII) Sec. 2-19-35. Complaints, adjustments.

(a) Complaints.

A. If a customer believes his bill to be in error, he shall present his claim, in writing, to the authority at the office of the authority before the bill becomes delinquent. Such claim, if made after the bill has become delinquent, shall not be effective in preventing termination of service as heretofore provided. The customer may

pay such bill under protest and said payment shall not prejudice his claim.

B. Settlement of claims and adjustments of bills are subject to the following additional provisions:

(a) Any consumer who fails to notify the authority in writing within thirty

(30) days after the date of a bill of any irregularities or errors that may be in said bill shall waive any right or claim for correction or refund under said bill.

(b) The authority will regularly test and replace malfunctioning meters. In addition, water meters will be tested at the request of the customer. If the meter is found to be malfunctioning, no charge will be made. However, if the meter is found not to be malfunctioning, the consumer will be required to pay a service fee of twentyfive dollars ($25.00) plus the actual cost to the authority for the inspection. Said fee and costs will be added to the next month's billing.

(c) If the seal of a meter is broken by any person other than the authority's representative, or if the meter fails to register correctly or is stopped for any cause, the customer shall pay an amount equal to the average of the three (3) previous months' bills.

(Ord. of 2-5-02, Art. XIII) Sec. 2-19-36. Termination of water service for failure to pay bill.

(a) Termination of services. The authority shall be empowered to terminate water services for the failure of a customer to pay his water bill. The following procedure shall be followed prior to termination of water service:

(1) The following written notice shall be forwarded to the customer and the same shall appear on current billing when said

customer has a previous balance:

"If there is a previous balance (on your account) and it is not paid within 10 days, you are hereby required to appear at a hearing to be held before the Clerk of the Authority at the Lamar County Water and Sewer Authority office 15 days from date of this bill (or next working day if this date is a holiday or weekend) at 9:30 a.m. to show cause why your service should not be terminated. You have 10 days from said hearing date to file for injunctive relief in Superior Court of Lamar County;

if not, service at this location will be terminated until account is paid in full."

(2) The hearing shall be set no earlier than ten (10) days from the date of the notice and not later than fifteen (15) days from the date of the notice.

(3) If the customer and the clerk of the authority are unable to resolve any discrepancies that may appear in the bill, the customer shall have ten (10) days from

the date of the hearing in which to file for injunctive relief in the Superior Court of Lamar County, Georgia. If no injunction is filed within said time, water service to the customer shall be terminated.

(4) If the customer fails to pay the disputed bill or any amount agreed upon by the customer and the clerk of the authority, plus all amounts owed in penalties or late fees, within ten (10) days after the date of the hearing, then said customer's water service shall be terminated.

(5) The clerk of the authority, or such other representative as may be appointed by the authority from time to time, is hereby authorized to conduct in behalf of the authority the above-stated hearings.

(6) If the customer does not provide access to the meter so that service may be restored, and the authority is required to make an additional service call to restore service, an additional fee of twenty-five dollars ($25.00) per service call will be assessed and added to the customer's water bill.

(7) If service has been discontinued for nonpayment, a customer can re-establish service by paying the total amount due the authority, together with any other applicable service call fees, charges and penalties. Payment must be received in the office of the authority by 12:00 noon on

normal business days for same day restoration of service. Service will be restored the following business day for payment

received after 12:00 noon.

(Ord. of 2-5-02, Art. XIV) Sec. 2-19-37. Suspension of services.

(a) Generally. When water service is discontinued, whether by written notice from the customer to the authority or by unilateral act of the authority, the authority shall apply any refundable deposits to the balance of any bill owed by the customer and refund the difference, if any exists,

to the customer.

(b) Suspension of services. The authority reserves the right to discontinue its service without notice for the following reasons:

(1) To prevent fraud or abuse;

(2) Customer's willful disregard of the rules of the authority;

(3) Emergency repairs;

(4) Insufficiency of water supply due to circumstances beyond the authority's control;

(5) Legal processes;

(6) Direction of public authorities;

(7) Strike, riot, fire, flood, unavoidable accident, actions of others, or acts of God. The authority reserves the right to terminate

the services granted by the authority for any other reason other than those stated above by giving the customer ten (10) days written notice of the date of termination, and further providing the customer with a right to hearing prior to termination of the service.

(Ord. of 2-5-02, Art. XV) Sec. 2-19-38. Plans and specifications for construction of water lines.

The authority shall have the right to specify the requirements, plans and specifications for the construction of water lines in Lamar County. All water lines constructed by any consumer or developer shall be constructed according to the plans and specifications established by the authority for the construction of water lines in Lamar County. No water line shall be covered without

first being inspected and approved by the authority.

(Ord. of 2-5-02, Art. XVI) Sec. 2-19-39. Cross connection control and backflow prevention.

(a) Installation of backflow prevention device required. All customers shall have in place a backflow prevention device of the type, design, and specifications set forth in subsection (c). Purchase, installation and inspection of the backflow prevention device shall be at the expense of the

customer, consumer, or developer.

(b) Designation as high-, medium-, or low-risk customer; monthly surcharge.

(1) The authority is authorized to categorize and designate customers as high-, medium-, or low-risk customers. Said designation shall be made by the backflow prevention program manager, or such other employee or representative of the authority as may be appointed from time to time, based upon his/her evaluation of the customer's property's use and potential for contamination of the public water supply.

(2) The authority is authorized to charge each high-risk customer of the system an amount not to exceed two dollars ($2.00) monthly as a surcharge to maintain and administer the cross connection and backflow prevention program.

(c) Type of backflow prevention device required;

approval of devices.

(1) A backflow prevention device shall be of the following types and installed in the following manner:

a. Low- and medium-risk customers:

The low- or medium-risk customer shall provide a double check valve (DCV) backflow prevention device in a size to match that of the required service meter.

i. Specifications. The DCV checks shall have replaceable seats, capture springs and the device assembly shall include a fullport ball valve on the inlet and outlet sides, with a union or

swivel coupling nut between the device and each valve. Unions or swivel nuts must be integral with the device or valves. Devices shall have three (3) ballvalve test cocks in the vertical position fitted with brass or plastic threaded plugs. A fourth vertical test cock shall be provided on the upstream side of the

inlet shutoff valve. All components of the assembly, including ball valve handles and assembly bolts, shall be equal in corrosion resistance to bronze

or stainless steel in order to resist electrolysis. Access to both checking devices shall be by top and/or side entry for maintenance and repair of all interior parts. Valve handles, except Ttype, shall turn up to close and in board (ninety (90) degrees)

to open.

ii. Installation. The DCV backflow prevention device shall not be buried in earth, but models with ready access to both checks may be installed in meter boxes, pits or vaults, provided ball valve test cocks seated with threaded plugs are used. All components of a DCV installed below ground should be resistant to electrolysis. A resilient seat shutoff valve should be near the inlet

and outlet side of the device, and three (3) approved test cocks provided on the device. Test cocks below ground shall be chlorinated before use.

iii. Sample approved devices:

Hersey Model # FDC/Unions Watts Model # U-007-QT

b. High-risk customers. The high-risk customer shall install a reduced pressure zone (RPZ) backflow prevention device.

i. Specifications. The RPZ shall be of a size to match that of the required service line or meter.

The RPZ assembly shall consist of a pressure differential relief valve located between two (2) positive seating check valves.

The relief valve shall function automatically by sensing the pressure differential across the first check valve and discharge the backflow to atmosphere should the check valve become damaged or fouled. The relief and check valves shall have replaceable seats, and the check valves provided with captured

springs. A full-port ball valve in sizes through two (2) inches, and resilient-seat OS & Y gate valve in sizes over two (2) inches shall be on the inlet and outlet sides of the device, with a union, swivel coupling nut, or flanges between the device and each valve. Unions and swivel nuts must be integral with the device or valves. The device shall be provided with three (3) ball

valve test cocks and a fourth test cock shall be provided on the upstream side of the inlet shut-off valve. Sizes through two

(2) inches shall have all test cocks in the vertical position.

Test cocks on all assemblies shall be provided with brass or plastic threaded plugs, and relief valve vent-ports shall have suitable connections for an air gap.

When a meter or other device with bronze strainer, integral or attached, is not immediately upstream of the backflow preventer, a bronze strainer shall be provided between the inlet shutoff valve and the RPZ on sizes through two (2) inches.

All components of the assembly, including ball valve handles and assembly bolts shall be equal in corrosion resistance

to stainless steel. Access to both checking devices shall be by top and/or side entry for maintenance and repair.

ii. Installation. The RPZ backflow prevention device shall not be buried in earth but shall be installed above ground in a structure that permits positive drainage, has freeze protection, and is located as close as practical to the outlet side of the meter. In lieu of above ground

installation, the RPZ may be installed immediately inside the facility provided no intervening connections exist between the meter and the device. Where relief valve discharge could cause water damage, it shall be piped via an air gap at the relief valve vent-port to a floor drain.

iii. Sample approved devices.

Hersey Model Nos. FRP II-U;

6CM; 6CM-RPDA

Watts Model Nos. U-009-QT;

909OSY; 909DDC.

(2) All backflow prevention devices shall be approved by the American National Standards Institute, the American Society of Sanitary Engineering, the American Water Works Association, the University of Southern California Foundation for Cross

Connection Control and Hydraulic Research, or the Canadian Standards Association. All shutoff valves used with backflow prevention devices shall be resilient seated.

(d) Time for compliance; authorization for installation services by the authority.

(1) Upon application for new water service from the authority, a consumer or developer shall be categorized as a low-, medium-, or high-risk customer and shall install the designated backflow prevention device required for that category prior to

receipt of water services.

(2) Existing high-risk customers shall install the designated backflow prevention device within thirty (30) days of the adoption of this section.

(3) Existing low- and medium-risk customers shall install the designated backflow prevention device within sixty (60) days of the adoption of this section.

(4) The authority is authorized to provide service for the installation of backflow prevention devices in compliance with the standards set out in subsection (c). Installation shall be at the expense of the property owner.

(e) Inspection of backflow prevention devices required, maintenance and submission of records by property owner.

(1) All backflow prevention devices shall be maintained in proper working order. Reduced pressure zone (RPZ) devices shall be tested immediately after installation

and not less than annually thereafter.

Double check devices (DCV) in use by lowor medium-risk customers shall be inspected and tested immediately after installation and at not less than five-year intervals following installation.

(2) The backflow prevention device shall be tested by a nationally recognized testing laboratory in accordance with the following standards:

a. Double check valve device. ASSE standard 1015, and shall bear the ASSE seal.

b. RPZ. ASSE standard 1015, and shall bear the ASSE seal.

c. [Synthetic components.] Synthetic (i.e.

rubber or nylon) components within a backflow prevention device shall be replaced not less than every five

(5) years.

(3) Each customer and/or owner of property which receives water services from the authority shall maintain a written record of the location, testing, and maintenance of each backflow prevention device on his/her property. Said records shall be provided to the authority upon written request by the backflow prevention program manager.

(4) High-risk customers shall submit backflow prevention device inspection and test reports annually to the backflow prevention program manager, or such other employee

or representative as may be appointed by the authority from time to time, or more frequently upon written request. Said report shall be submitted within fourteen

(14) days of completion of the inspection or written request.

(5) The authority is authorized to suspend water service to a customer's premises in the event backflow prevention device inspection and test reports are not provided as required.

(f) Entry upon premises for purposes of inspection. The authority shall be authorized to conduct inspections to determine compliance with this

section at the discretion of the program manager, or such other employee or representative as may be appointed by the authority from time to time.

Agents and employees of the authority shall be authorized to enter the premises of the customer without notice during daylight hours for the purpose of inspection and testing of the backflow prevention device.

(g) Installation of thermal expansion device.

An auxiliary release valve, or expansion chamber, shall be installed where water is heated and stored in a customer's water system, or a branch of the system, which has been closed by the installation of a backflow prevention device. Said auxiliary release valve or expansion chamber shall be installed to limit thermal expansion of the heated water to not more than eighty (80) psi static (no-flow) pressure at any fixture on the system.

(h) Lawn sprinkler or irrigation systems.

(1) Lawn sprinkler or other irrigation systems, when connected to the authority's water system, shall include adequate provision for drainage and backflow prevention.

(2) Where chemicals, pesticides, fertilizer, or other additives are utilized with a sprinkler system, said system shall have an approved reduced pressure zone (RPZ)

backflow prevention device.

(i) Penalties for failure to comply with section.

(1) In the event a backflow prevention device is found not to be in compliance with those standards set forth in this article, the property owner or customer shall cause said device to be repaired or replaced so as to meet the standards set forth in this section within five (5) days of written notice by the authority. In the event the backflow prevention device is not repaired or replaced within five (5) days after written notice by the authority, the authority is authorized to suspend water service to

the property owner or customer's premises without further notice until such time as the device is repaired or replaced such

as to be in compliance with this section.

(2) Violation of this section by a customer or property owner may be punished by a maximum fine of five hundred dollars ($500.00) per occurrence.

All existing industrial and commercial customers of the Lamar County Water and Sewer Authority shall install at their own expense a backflow prevention valve approved by the Lamar County Water and Sewer Authority and all future industrial and commercial customers of the Lamar County Water and Sewer Authority shall be required to install at their own expense a backflow prevention valve approved by the Lamar County

Water and Sewer Authority prior to the commencement of service.

(Ord. of 2-5-02, Art. XVII) Sec. 2-19-40. Allocation of water services.

The authority shall have the right from time to time, if necessary, to allocate water to a customer under specific rules and regulations that may hereinafter be adopted by the authority.

(Ord. of 2-5-02, Art. XVIII) Sec. 2-19-41. Amendments to chapter.

Since special circumstances frequently occur which require changes, amendments or modifications to this chapter, this chapter may be amended without notice upon the approval of said changes,

amendments or modifications by the authority and the county. The authority has the right to amend this chapter without approval of the county to set rates and fees and to provide for the construction, operation and maintenance of the Lamar County Water System, generally.

(Ord. of 2-5-02, Art. XIX) Sec. 2-19-42. Promulgation of rules and/or policies.

The authority is authorized to develop, implement, and administer such rules, regulations, and policies as are necessary for the construction,

maintenance and operation of the water facilities of Lamar County, including, but not limited to, achieving and maintaining compliance with the rules, regulations and policies of all federal or state agencies having jurisdiction over same.

Nothing in this chapter shall be construed to limit any power whatsoever granted to either the county or the authority by that entity's respective legislative grant.

(Ord. of 2-5-02, Art. XX) Sec. 2-19-43. Enforcement, generally.

The authority shall enforce the terms of this chapter through the administrative procedures herein set out or through legal actions in a court of law. The authority shall have the power to issue citations and to call upon the Lamar County Sheriff's Department or any police department created by Lamar County or its successors to enforce the terms of this chapter.

Any fine which is imposed for violation of any part of this chapter shall be collected by the county and paid from the coffers of the county to the authority for the purpose of mitigating the costs of constructing, operating, and maintaining the water system of Lamar County.

(Ord. of 2-5-02, Art. XXI) Sec. 2-19-44. Tampering with authority and county property prohibited;

penalties.

(a) Generally. All water system facilities shall be considered the property of the Lamar County Water and Sewer Authority. Any consumer, developer, customer, person, firm, corporation, company, joint venture, public body, public agency, public authority, or other entity who, without the

authorization of the authority:

(1) Connects onto a water line of the authority;

(2) Disconnects a water line from a water line of the authority;

(3) Connects onto a water meter of the authority;

(4) Disconnects a water meter of the authority;

(5) Moves, removes, changes, or alters the location of a water meter;

(6) Changes, alters, or damages any water meter or water line so as to prevent proper registration of water passing through said water meter or line;

(7) Obtains water;

(8) Prevents any other person from obtaining water;

(9) Obstructs or otherwise interferes with the reading or maintenance of any water meter;

(10) Obstructs or otherwise interferes with any water line, fire hydrant, pumping station or any appurtenances to water facilities of Lamar County;

(11) Creates a hazardous or unsafe condition to the water facilities of Lamar County;

shall be issued a citation and, if found guilty, shall be subject to a minimum fine of five hundred dollars ($500.00) to a maximum fine of one thousand dollars ($1,000.00) and/or imprisonment in the county jail for a minimum of thirty (30) days

to a maximum of one hundred twenty (120) days.

(b) Hearings. The Magistrate Court of Lamar County, Georgia, shall have jurisdiction to hear, try and dispose of citations that are issued for said violations.

(c) Citations. Any consumer, developer, customer, person, firm, corporation, company, joint venture, public body, public agency, public authority, or other entity who is charged with having violated this chapter shall be issued a citation by

the Lamar County Police Department, Lamar County Sheriff's Department or a representative of the authority. Said citation shall require the appearance of the violator in the Magistrate Court of Lamar County, Georgia, to answer said charges.

(Ord. of 2-5-02, Art. XXII) Sec. 2-19-45. Water use restrictions; enforcement.

(a) Generally. The authority shall be empowered, in times of drought or otherwise whenever, in the discretion of the authority, such measures

are needed, to promulgate restrictions on the use of water by consumers.

(1) If a customer uses water in violation of restrictions imposed by the authority, the authority shall be empowered to automatically impose a fine upon said customer which shall not exceed one hundred fifty

dollars ($150.00) per violation. Said fine shall appear on the customer's current billing and shall be delineated separately from water and sewer use billing in such a manner as would be reasonably likely to inform a person of normal intelligence that a fine is being imposed for violation of water use restrictions.

(2) If a fine imposed by the authority under this article is disputed by the customer, said customer shall, upon written request within fifteen (15) days of the date of the bill which includes the fine (or the next working day if the fifteenth day is a weekend or legal holiday), be entitled to a hearing before the clerk of the authority,

or his or her designee, to attempt to resolve the dispute. Said hearing shall be set on the first available date after receipt of the request, except that three (3) days shall be allowed for sufficient notice of the hearing to the consumer.

(3) Notice of the customer's right to hearing shall be included in any bill which imposes a fine and shall read substantially as follows:

"If you dispute that you have violated Lamar County's Water Use Restrictions, you have the right to request a hearing (in writing), within fifteen (15) days (or next working day if the fifteenth (15th) day is a legal holiday or weekend) before the clerk of the Lamar County Water and Sewer Authority, or his or her designee. Your hearing will be set on the first available date after receipt of the request and you will be given at least three (3) days notice thereof. Continuances will be granted for legal cause only."

(4) The clerk of the authority, or his or her designee, at the hearing, shall provide the customer (or his or her appointed attorney in fact) with a full and fair opportunity to present relevant facts regarding the alleged violation in the most informal

fashion practicable, without regard to the rules of evidence. If, after hearing, the clerk (or duly appointed designee) is unable, based on the facts presented, to remove the fine, the same shall become

due and payable and the consumer shall have the right to seek a refund in the Superior Court of Lamar County, by filing a petition therein.

(b) Termination of services for failure to pay fine. If a customer fails to pay a fine that is due and payable under this article, the authority shall be empowered to terminate water services to that customer.

(Ord. of 2-5-02, Art. XXIII) Chapters 2-20—2-24

RESERVED

Chapter 2-25

WATERSHED PROTECTION*

ARTICLE I. IN GENERAL

Secs. 2-25-1—2-25-18. Reserved.

ARTICLE II. LITTLE TOWALIGA RIVER

WATERSHED

Sec. 2-25-19. Introduction; purpose.

The Eady Creek Reservoir is located in Lamar County, Georgia, and is owned by the City of Barnesville. The Little Towaliga River watershed is upstream of a supplemental withdrawal at the "Low-Head" Dam on the Little Towaliga River.

This withdrawal discharges to the Eady Creek Reservoir. The Eady Creek Watershed upstream of the Eady Creek Reservoir is contained within the Little Towaliga River Watershed. The reservoir is a water supply reservoir for the City of Barnesville, Aldora, Milner and unincorporated

portions of Lamar County. The purpose of this watershed protection plan is to establish criteria pursuant to O.C.G.A. 12-2-8 for the protection of drinking water watersheds. This protection is necessary for the enhancement of public health, safety and welfare as well as to assure that surface sources of drinking water are of high quality in order to be treated to meet all state and federal drinking water standards. The criteria set forth accomplish this by establishing buffer zones around streams and by specifying allowable impervious surface densities within the Little Towaliga River watershed upstream of the low

head dam intake.

Secondary objectives are to:

(a) Manage the reservoir and the Little Towaliga River watershed in a manner that will conserve the basic resources of air, soil, and water;

(b) Provide for diverse and viable plant, animal, and fish communities;

(c) Give special consideration for the protection of threatened and endangered plant and animal species;

(d) Manage the reservoir to properly establish, enhance, and maintain acceptable fish and wildlife habitat, aesthetic quality, and sustain natural environmental conditions;

(e) Manage use of the reservoir in a manner that provides the least environmental impact;

(f) Provide for the protection of public land and water.

(Ord. of 6-21-99, § I) Sec. 2-25-20. Definitions.

This chapter is made part of and hereby references the Lamar County Zoning Ordinance adopted by the Lamar County Board of Commissioners on October 20, 1992, including section 2101, Sensitive Land-Watershed Protection and is hereby

made part of this watershed protection plan. For purposes of this watershed protection plan, certain words or terms used herein are defined as follows:

Agriculture means the raising of soil crops, poultry, and livestock in a customary manner on tracts of land at least three (3) acres in size, including all related buildings, structures, and appurtenances necessary to carry out all associated activities. Agricultural zoning districts are intended to establish and preserve quiet areas

where the primary activities are those of farming, agriculture, livestock, timber cultivation, and related uses consistent with maintaining the land resources of Lamar County. Residences of a lowdensity nature which are incidental to these activities are also permitted.

Buffer means a natural or enhanced vegetated area with limited minor land disturbances, such as trails, picnic areas, and land-use practices in accordance with published best management practices such as best management practices for forestry. Buffer setbacks are specified in sections 2-25-23 and 2-25-24.

Corridor means all land within the buffer areas and other setback areas specified in sections 2-25-23 and 2-25-24 of this plan.

Impervious surface means a man-made structure or surface which prevents the infiltration of stormwater into the ground below the structure

or surface. Examples are buildings, roads, driveWATERSHED PROTECTION § 2-25-20 ways, parking lots, decks, swimming pools, or

patios. No impervious surface areas are allowed within the reservoir buffer area as specified in subsection 2-25-23(2)b.

Land-disturbing activity means any grading, scraping, excavating, or filling of land; clearing of vegetation, and any construction, rebuilding, or alteration of a structure. Land-disturbing activity shall not include activities such as ordinary maintenance and landscaping operations, individual home gardens, yard and grounds upkeep, repairs,

additions or minor modifications to a singlefamily residence, and the cutting of firewood for personal use.

Perennial stream means a stream which flows throughout the whole year as indicated on a USGS quad map.

Reservoir boundary means the edge of a water supply reservoir defined by its normal pool level of six hundred fourteen and one-half (614.5) feet above mean sea level for Eady Creek Reservoir.

Utility means public or private water or sewer piping systems, water or sewer pumping stations, electric power lines, fuel pipelines, telephone lines, roads, driveways, bridges, river/lake access facilities, stormwater systems and railroads or other utilities identified by Lamar County, the City of

Milner and the City of Barnesville, Georgia.

Water supply reservoir means the City of Barnesville-owned impoundment of water (Eady Creek Reservoir) for the primary purpose of providing water to the cities of Barnesville, Milner, and Aldora and Lamar County public drinking

water systems.

Water supply watershed means the drainage area of land upstream of the "Low-Head" Dam water intake, located on the Little Towaliga River at the intersection of Harmony Hill Ranch Road.

Water supply watershed protection plan is a land use plan prepared and adopted by Lamar County, the City of Milner and the City of Barnesville, Georgia, for the protection of the quality of drinking water obtained from the water supply watershed.

(Ord. of 6-21-99, § II) Sec. 2-25-21. Coverage area.

These criteria shall apply to portions of Lamar County located within the Little Towaliga River watershed upstream of the Low-Head Dam intake. These criteria do not apply to watersheds not used for public drinking water supply.

(Ord. of 6-21-99, § III) Sec. 2-25-22. Exemptions.

The following activities shall be exempt from the plan. Utilities from the stream corridor buffer and setback area provision of the watershed protection plan in accordance with the following conditions if the utilities to be located in the

buffer or setback areas cannot feasibly be located outside these areas:

(1) The utilities shall be located as far from the stream bank as reasonably possible;

(2) The installation and maintenance of the utilities shall be such to protect the integrity of the buffer and setback areas as best as reasonably possible;

(3) The utilities shall not impair the quality of the drinking water stream. Best management practices shall be installed to control erosion.

(Ord. of 6-21-99, § IV) Sec. 2-25-23. Minimum criteria.

The Little Towaliga River is classified as a small water supply watershed. A small water supply watershed is one that contains less than one hundred (100) square miles of land within the drainage basin upstream of a governmentally owned public drinking water supply intake. Eady Creek Reservoir contains nineteen and eighttenths (19.8) square miles of drainage area upstream of the City of Barnesville raw water intake and the Little Towaliga River watershed contains forty-nine and nine-tenths (49.9) square

miles drainage area upstream of the low head dam intake. The Eady Creek Reservoir watershed is contained within the Little Towaliga River watershed.

Stream corridor criteria.

(1) The perennial stream corridors of a small water supply watershed within a sevenmile radius upstream of a governmentally owned public drinking water supply intake or water supply reservoir are protected by the following criteria:

a. A buffer shall be maintained for a distance of one hundred (100) feet on both sides of the stream as measured from the stream banks;

b. No impervious surface shall be constructed within a 150-foot setback area on both sides of the stream as

measured from the stream banks;

c. Septic tanks and septic tank drain fields are prohibited in the setback area of b. above.

(2) The perennial stream corridors within a small water supply watershed but beyond a seven-mile radius distance upstream of a governmentally owned public drinking water supply intake or water supply reservoir are protected by the following criteria:

a. A buffer shall be maintained for a distance of fifty (50) feet on both sides of the stream as measured from the stream banks;

b. No impervious surface shall be constructed within a 75-foot setback area on both sides of the stream as measured from the stream banks;

c. Septic tanks and septic tanks drain fields are prohibited in the setback areas of b. above.

(3) The following criteria apply at all locations in a small water supply watershed:

a. No sanitary landfills are allowed in the Eady Creek water supply watershed drainage area;

b. New hazardous waste treatment or disposal facilities are prohibited;

c. The impervious surface area, including all public and private structures, utilities, or facilities, of the entire

water supply watershed shall be limited to twenty-five (25) percent, or existing use, whichever is greater.

Determination of compliance of this section regarding impervious surface area shall be made by the Lamar County Zoning Administrator by comparison of proposed development of impervious area versus open spaces to the total current impervious area and open space of the reservoir drainage area. The total impervious area ratio shall be calculated at time of adoption of this article and

maintained in the office of the Lamar County Zoning Administrator;

d. All permitted and acceptable land disturbing activities will be vegetated or re-vegetated immediately with appropriate grasses or legumes;

e. Agricultural activity including farm ponds shall be consistent with best management practices established by the Georgia Department of Agriculture, and shall comply with Georgia Pesticide Act of 1976, Georgia Pesticide and Use Act of 1976, and Georgia Laws 1982, House Bill 1780

(O.C.G.A. § 2-1-4);

f. Forestry management within the forty-nine and nine-tenths (49.9) square mile drainage area will follow the

Georgia State Forestry Commission's best management practice guidelines for streamside management zones, stream crossings, access roads

and their construction, timber harvesting, site preparation, and reforestation and forest protection (prescribed burning, firelines, and chemical fire retardant);

g. New livestock feedlot operations will be allowed provided best management practices are followed;

h. New industrial development projects will be allowed on a case-by-case basis. Industrial facilities which handle hazardous materials of the types and amounts determined by the Department of Natural Resources shall perform their operations on impermeable surfaces having spill and leak collection systems as prescribed by

the Department of Natural Resources;

i. Permitting for activities in the watershed will be governed by the watershed protection criteria of this section 2-25-23, administered by the

Lamar County Planning Commission through the zoning administrator. It shall be the responsibility of every land user, developer or builder

to present plans for land use alterations within the drainage areas to the Lamar County Planning Commission for review and approval.

Plans for commercial projects shall bear a stamp by a Georgia registered engineer and shall include at a minimum the calculated total impervious area(s) and shall have a detention/ retention pond to control stormwater

runoff from the site.

(Ord. of 6-21-99, § V) Sec. 2-25-24. Reservoir management.

The City of Barnesville owns and maintains the reservoir. The reservoir shall be governed by a management plan which addresses the recreational use of the reservoir and the maintenance of the buffer around the reservoir. The City of

Barnesville has adopted a reservoir management plan and is made a part of the Lamar County Watershed Protection Plan by reference hereto.

Please see Appendix A.

(Ord. of 6-21-99, § VI) Sec. 2-25-25. Enforcement.

Violations of the criteria set forth in this plan for protecting the water quality of the Little Towaliga River Watershed shall be enforced by Lamar County, its assigns or duly authorized agents. All incidents of littering, water pollution, or any other act which threatens water quality, after the first warning, shall be punishable by the maximum fine of one thousand dollars ($1,000.00) allowed by law in the magistrate court pursuant to O.C.G.A. § 15-10-60 et seq. This is in addition to any other punishment provided by other local, state or federal law.

(Ord. of 6-21-99, § VII)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:lamar-county/code/whole@2024-12-17-84b4089701

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.