Appendix B - LAND DEVELOPMENT

Sec. 11. Administration, enforcement, and penalties.

Sobre este texto

  • As published by Municode, current through 2021-12-13
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

11-1 Land Development Administrator. An administrative official designated as the Land Development Administrator by the Board of Commissioners, Lanier County, Georgia, shall administer and enforce the provisions of this ordinance.

11-2 Building/Development Permit Required. A building/development permit issued by the Land Development Administrator is required in advance of the initiation of construction, erection, moving, demolition, or alteration of any building or structure or any land development. No building or development permit shall be issued except in conformity with the provisions of this ordinance; however, a building permit issued before the adoption of this ordinance shall remain valid with the same qualifications as issued under this ordinance.

11-3 Application for Building/Development Permit. All applications for building/ development permits, except single-family residential, duplexes and agricultural buildings not intended for human occupancy, and their accessory uses shall be accompanied by two (2) site plans drawn to scale showing the actual dimensions of the lot to be built upon, the size and location of the lot, the number of dwelling units the building is designed to accommodate, the setback lines of the building on the "permit lot," the various easements on the lot and such other information as may be essential for determining whether the provisions of this ordinance are being observed. The following is required on the site plan before the site plan is considered by the Land Development Administrator and any permits are approved (single-family residential, duplexes and agricultural buildings, and their accessory uses are excluded from the following items except number 3 below):

1. Topography (MSL) existing and proposed.

2. Drainage plans.

3. Location and size of ingress/egress.

4. Water mains and services, both existing and proposed.

5. Water services as well as fire hydrants in the lot and the specific meter size and location.

Any building/development permit shall become void if the work involved has not begun within six (6) months after the date of issuance of the permit or if the work or development authorized by such permit is suspended or abandoned for a period of six

(6) months after the work or development is commenced; provided that extensions of time and periods not exceeding six (6) months each may be allowed in writing by the Land Development Administrator. Any unapproved deviation from the site plan shall cause the Land Development Administrator to not issue a Certificate of Occupancy.

Single-family residential, duplexes and agricultural buildings, and their accessory uses, site plans need not be drawn to scale, but must be accurate as to dimensions of lot and proposed building.

The applicant for a building/development permit shall submit a certificate with his application which certifies that the lot which he proposes to develop is a lot of record. When the lot in question does not meet the lot width and lot area requirements of this ordinance, then the applicant shall certify that such lot was a lot of record prior to the adoption of this ordinance or is a lot which has been created through governmental taking of property.

All applications for a building/development permit shall be closely coordinated with Lanier County's Soil and Sedimentation and Erosion Control Ordinance.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:lanier-county/code/11@2021-12-13-93d87261a3