Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 118 - SUBDIVISION STANDARDS / Article VI - REQUIRED IMPROVEMENTS

Sec. 118-214. Water supply.

Sobre este texto

  • As published by Municode, current through 2015-12-01
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

All lots, tracts or parcels must be served by a water source. The water source may be an individual water system, a municipal/county water system, or a community water system. The water source must be approved by the governing authority, the health department and, when necessary, the environmental protection division of the state department of natural resources.

All required improvements must meet the requirements of these agencies. Individual wells shall be installed in accordance with the rules and administrative regulations of the county health department.

(1) Subdivisions located in any municipality, or near or adjacent to an existing municipal/ county water supply, shall connect to that municipal/county water supply, unless the municipality/county certifies that it will not supply water to the proposed development.

(2) Subdivisions not located within and served by a municipality/county owned water system and located adjacent to an existing private water supply may connect to that water supply provided that the owner agrees to the connection in writing, that the proposed system is approved as mentioned above, and that the existing system is capable of providing an adequate supply of water.

(3) When the water main is located in the street to serve the abutting lots, a water service line shall be stubbed out to the property line to serve each lot before the street is surfaced. The location of each service line shall be marked clearly on the record drawings and submitted to the governing authority.

(4) All developments shall address provisions for fire protection. For developments with municipal/county or community water systems, appropriate water sources, water flows and pressures must be provided for fire protection and be approved by the county's fire coordinator and building official. For developments of more than ten lots, where the minimum lot size is one or more acres, and all lots are served by individual private water systems, dry hydrants or other means of fire protection shall be considered. For developments with individual water systems:

a. With ten or fewer lots where the minimum lot size is one or more acres; or

b. When the minimum lot size for the development is three or more acres, no provision for community or central fire protection is required, but individual building protection (such as sprinkler systems) is encouraged.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 2-3-2015, § 6.19.2)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:long-county/code/118-214@2015-12-01-b3ae000eb5

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Long County Code of Ordinances, Sec. 118-214. Water supply | Georgia Commons