Ir al contenido
Georgia Commons
Menú

Macon County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 14 - ENVIRONMENT / Article III - GROUNDWATER RECHARGE AREA PROTECTION / Division 3 - GROUNDWATER PROTECTION STANDARDS

Sec. 14-248. Criteria for waste disposal facilities.

Sobre este texto

  • As published by Municode, current through 2020-08-20
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) For all pollution susceptibility areas, new waste disposal facilities must have synthetic liners and leachate collection systems.

(b) New agricultural waste impoundments shall meet the following requirements:

(1) For areas of high pollution susceptibility, a liner shall be provided that is approved by the U.S. Soil Conservation Service (SCS).

(2) For areas of medium pollution susceptibility, a liner approved by the SCS shall be provided if the site exceeds 15 acre-feet.

(3) For areas of low pollution susceptibility, a liner approved by the SCS shall be provided if the site exceeds 50 acre-feet.

(4) No land disposal of hazardous waste shall be permitted within any significant groundwater recharge area.

(5) For all significant groundwater recharge areas, the handling, storage and disposal of hazardous materials, as identified in section 312 of the Resource Conservation and Recovery Act of 1976, as amended, excluding underground storage tanks, and in amounts of 10,000 pounds or more on any one day, shall take place on an impermeable surface having spill and leak protection approved by the state department of natural resources, environmental protection division (EPD), and in conformance with local fire prevention code requirements.

(6) For all significant groundwater recharge areas, new, aboveground chemical or petroleum storage tanks larger than 650 gallons must have secondary containment for 110 percent of tank volume or 110 percent of the largest tank in a cluster of tanks. Such tanks used for agricultural purposes are exempt from this requirement, provided they comply with applicable federal regulations.

(7) For high pollution susceptibility areas, new wastewater treatment basins shall have an impermeable liner approved by EPD.

(8) For high pollution susceptibility areas, no new stormwater infiltration basins may be constructed.

(9) For high pollution susceptibility areas, the use of wastewater spray irrigation systems and the land application of wastewater sludge shall be practiced in accordance with the department of natural resources criteria for slow rate land treatment. An application for a development permit for activities involving wastewater spray irrigation or land application of wastewater sludge must be accompanied by proof that the applicant has received a land application system permit from EPD.

(10) Minimum lot sizes and septic systems. Construction of new homes to be served by septic tank/drain systems shall not commerce until such time as the required building permit has been issued, and the proposed septic tank installation has been approved by the county health department in conformance with minimum lot size requirements.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:macon-county/code/14-248@2020-08-20-3c9e327ea6

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Macon County Code of Ordinances, Sec. 14-248. Criteria for waste disposal facilities | Georgia Commons