Ir al contenido
Georgia Commons
Menú

Marion County · Código de ordenanzas

Chapter 58 - TELECOMMUNICATIONS / Article II - TELECOMMUNICATIONS FACILITIES

Sec. 58-30. Appearance and buffering.

Sobre este texto

  • As published by Municode, current through 2022-03-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) The use of any portion of a telecommunications facility for signs, promotional or advertising purposes, including, but not limited to, company name, phone numbers, banners, streamers, and balloons, is prohibited.

(b) The facility shall have the least practical visual effect on the environment, as determined by the planning board. Any tower that is not subject to FAA marking as set forth in section 58-29 shall otherwise:

(1) Have a galvanized finish, or shall be painted gray above the surrounding tree line and gray or green below the tree line, as deemed appropriate by the planning board; or

(2) Be disguised or camouflaged to blend in with the surroundings, to the extent that such alteration does not impair the ability of the facility to perform its designed function.

(c) Without limiting the requirements of subsection (b) of this section, existing on-site vegetation shall be preserved to the maximum extent possible, and no cutting of trees exceeding four inches in diameter (measured at a height of four feet off the ground) shall occur in connection with the telecommunications facility prior to the granting of special permit and site plan approval. The clearcutting of all trees in a single contiguous area exceeding 20,000 square feet shall be prohibited.

(d) The planning board may require additional information, such as line-of-sight drawings, detailed elevation maps, visual simulations, before and after renderings, and alternate tower designs to more clearly identify adverse impacts for the purpose of their mitigation.

(e) Equipment or vehicles not used in direct support, renovations, additions or repair of any telecommunications facility shall not be stored or parked on the facility site.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 12-12-2006(02), § 8)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:marion-county/code/58-30@2022-03-08-e0c3ab2d8e

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Marion County Code of Ordinances, Sec. 58-30. Appearance and buffering | Georgia Commons