The application for a special permit for the construction of a telecommunications facility shall include, without altering any other application requirements set forth in this section or elsewhere in this article:

(1) A complete project application form in such detail and containing such information as the planning board may require.

(2) A site plan in accordance with the requirements for site plans generally, and, if more detailed, in accordance with the site plan requirements of this section including, without limitation, the following:

a. The exact location including geographic coordinates of the proposed telecommunications facility including any towers, guy wires and anchors, if applicable;

b. The maximum height of the proposed facility, including all appurtenances;

c. A detail of tower type, if any, including engineering drawings from the tower manufacturer (monopole, guyed, freestanding, or other);

d. The location, type, and intensity of any lighting on the tower;

e. Property boundaries and names of all adjacent landowners;

f. Proof of the landowner's consent to the erection of the facility and agreement to abide by this article if the applicant is not the landowner;

g. The location of all other structures on the property and all structures on any adjacent property within 100 feet of the property lines, together with the distance of these structures from any proposed tower;

h. The location, nature and extent of any proposed fencing;

i. The location and nature of any actual or proposed utility easements and access roads or drives;

j. Engineer's certification that the telecommunication facility and all related components have been designed in accordance with generally accepted good engineering practices and in accordance with generally accepted industry standards, and, if constructed in accordance with the plans, the entire facility (including the soils of the site itself) will be safe, will be in accordance with all applicable governmental building codes, laws and regulations and in accordance with generally accepted good engineering practices and industry standards, including, without limitation, acceptable standards as to stability, wind and ice loads, and bird protection.

(3) Agreement that the applicant will negotiate in good faith with any subsequent applicant seeking to collocate a telecommunications facility on the initial applicant's structure.

(4) The agreement for removal of the facility referred to above.

(5) Copies of all documents submitted to the FCC or any other governmental agency having jurisdictions.

(6) Any applicable application or other fees required by the county for application to the costs of any consultants retained by the county as provided in this section.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 12-12-2006(02), § 13)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:marion-county/code/58-35@2022-03-08-2af2dfbaad

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Marion County Code of Ordinances, Sec. 58-35. Application | Georgia Commons