Sec. 74-187. Required improvements.

Sobre este texto

  • As published by Municode, current through 2026-09-15
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Subdivision improvements which are subject to section 74-186, immediately above include, but are not limited to, the following:

(a) Lot markers. In addition to the development's outer perimeter, all lot boundaries shall be marked with iron pipes, pins, or rebar not less than one-half inch in diameter and not less than twenty-four inches long, and shall be driven so as to be flush with the finished grade.

Prior to submittal of a final or as built plat all lot lines at their juncture with the right-of-way shall be indicated with a one-inch × two inches or greater wooden posts or three inches (diameter) or greater white PVC pipe, or other marker as approved by the planning commission, which shall clearly indicate the lot number. Such marker shall extend a minimum of 24 inches above common grade. Lot markers located in the center of the front property line are not acceptable.

(b) Storm drainage (R). An adequate drainage system, including, but not limited to pipes, culverts, drains, inlets, headwalls, bridges and detention/retention facilities, shall be provided as engineered for the proper drainage and detention/retention of all surface water. All engineered storm drainage systems shall be approved before such systems may be installed and before preliminary and final plat approval will be issued by the planning commission.

(c) Street development. Every subdivision lot or parcel shall have access to a street system which shall be designed and engineered according to the design criteria contained in this chapter, article III herein, and such criteria as referenced below.

(1) Preparation of right-of-way. The full width of all roadways shall be prepared so that pavement, sidewalks, and other required improvements may be constructed in such a manner that future extension of additional utilities or street improvements will not damage yards of abutting property. Abutting property shall be suitably sloped to the right-of-way line. Due regard shall be shown for desirable trees not impairing visibility.

(2) Preparation of subgrade. Before grading is started, the entire area to be paved shall first be cleared of all stumps, roots, brush and other objectionable materials. In all areas to be graded or filled, the subdivider shall stockpile the topsoil to be spread later in all disturbed areas not paved.

(3) Protection of banks. Immediately after grading, filling, and re-spreading of topsoil, all areas of disturbed soil shall be fertilized, seeded, sodded, or otherwise appropriately treated with suitable vegetative cover to retard erosion. The stabilization as evidenced by an adequate stand of grass on all right-of-ways shall be obtained to the satisfaction of the director of public works before approval of the final plat.

(4) Roadway base. Roadway base material and compaction shall conform to the county's specifications for such, and shall be approved by the director of public works.

(5) Curb-and-gutter and paving (R). All new streets shall be surfaced by the developer with paving materials as required by county specifications regarding street paving and surface materials. Concrete curbs and gutters shall be required on all new streets and shall be constructed by the subdivision developer in accordance with the county's specifications for curbs and gutters available from the office of the director of public works. Where a subdivision abuts an existing state or county road, the developer shall be required to extend the subdivision's road improvements (paved roadway, curb/ gutter, etc) out to, and to improve such public road in compliance with the minimum requirements of this chapter.

(6) New streets (R). The preparation and development of all new roads shall comply with the county's specifications herein, and shall be approved by the county before such streets may be developed and accepted by the county.

(7) Turn lanes (R). Center turn lanes may be required at entrances into residential, industrial, and commercial developments which front on arterial streets. Turn lanes shall be 12 feet in width for a minimum distance of 200 feet which distance shall be measured from the intersection of the right-of-way lines. Contact the planning commission for analysis of county roadway at proposed subdivision entrance(s) and the requirements for turn lanes.

(8) Acel/decel lanes (R). Acel/decal lanes shall be required for all subdivision entrances fronting a primary or secondary arterial roadway, or what is determined by the planning commission to be a major collector road or street of increased speed and traffic flow. Acel/decal lanes shall be constructed to the design criteria as required by the public works director.

(9) Number of entrances (R). To facilitate ease of traffic, every subdivision having frontage greater than 2,000 feet on an existing public roadway, or has frontage on multiple county roadways, may be required to provide more than one entrance to such subdivision.

(d) Sidewalks (R). Concrete sidewalks shall be required for all residential subdivisions, multi-family and PUD developments. Sidewalks may be required in industrial and commercial developments depending on the characteristics and density of the development. Sidewalks shall be constructed on both sides of the streets to the county's design standards as found in the office of the director of public works and shall be four feet in width and four inches in depth.

For standard (upright) curb and gutter, the sidewalk may join or abut the back side of the curb.

For roll-top curbing, the front (street) edge of the sidewalk shall be placed not closer than five feet from the back side of the curb. To stabilize the edges of the sidewalk and curbing, turf grass shall be placed in the five-foot area between the back of the curbing and the front edge of the sidewalk. For standard curbing with abutting sidewalk, a single row of turf shall be placed on the back side of the sidewalk. Sidewalks shall not be located less than one-foot from all front property lines to prevent interference or encroachment by fencing, walls, hedges or other plantings or structures placed on the property line at a later date. At street corners and other required locations, sidewalk handicap ramps shall be installed. In addition to interior subdivision sidewalks, sidewalks along exterior roadways or other public right-of-ways shall also be required where deemed by the planning commission as an integral part of a pedestrian traffic system within a one-mile radius of existing or planned schools, neighborhood recreation, or commercial areas, or other public places, and for continuation of existing sidewalks.

(e) Site improvements. Banks which infringe on sight lines at intersections shall be appropriately graded to correct the deficiency. Wherever grading or filling occurs on lots within the subdivision, the subdivider shall first stockpile the topsoil from the affected areas immediately after grading and filling, and shall redistribute to areas of disturbed soil, sufficient topsoil to support growth of lawn grass and other vegetation, and shall immediately seed such areas with appropriate vegetative cover to prevent erosion, silting of streams and other damages. Due regard shall be shown for such desirable trees which are already on the site, and grading and filling should be planned to preserve as many of such trees possible; however, no retained planting shall infringe on sight lines at intersections. If trees are planted by the subdivider, they shall be located five feet inside or behind property lines where they are less subject to injury, decrease the chances of motor accidents and enjoy more favorable conditions for growth. If trees are to be planted within a planting strip in the right-of-way, the proposed locations and species of such trees to be used must be submitted for the planning commission's approval since the public inherits the care and maintenance of such trees. Where land is platted or reserved for commercial or industrial use bordering or across from residential lots, a suitable buffer planting of trees and shrubs which are approved by the planning commission shall be required, such trees and shrubs shall not infringe on sight lines at intersections where planted.

(f) Sanitary sewerage (R).

(1) All subdivisions (including any/all phases) shall be connected to an existing public sewerage system if service is available within the following distances.

Size of Development Distance to Public Sewerage1 2 Lots 100 Feet 3-5 Lots 200 Feet 6-10 Lots 500 Feet 11-25 Lots 750 Feet

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:mcduffie-county/code/74-187@2026-09-15-b40af196cd

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

McDuffie County Code of Ordinances, Sec. 74-187. Required improvements | Georgia Commons