Meriwether County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 22 - ROADS AND BRIDGES / Article VI - HARVESTING TIMBER
Sec. 22-143. Ingress and egress approval, inspection and related requirements.
Sobre este texto
- As published by Municode, current through 2026-01-12
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) For any ingress or egress identified by any harvester pursuant to the notice requirements set forth above and if said ingress and egress so identified shall access or cross any right-of-way of Meriwether County, the harvester shall be required, in addition to obtaining ingress/egress approval, to comply with the following temporary harvesting driveway requirements:
(1) Gravel the temporary harvesting driveway with a minimum pad of 30 feet in width for the first 20 linear feet from the entrance and then no less than 20 feet in width after the first 20 linear feet from the entrance for 100 linear feet with three-inch to five-inch size stone, unless another size is approved by Meriwether County. Said driveway shall be a minimum depth of three inches of stone to ensure mud and/or other debris will not be tracked onto the county roadway.Meriwether County shall also require the placement of geotextile fabric on all new drive cuts. These driveway requirements shall apply to all county paved roads and unpaved roads under certain circumstances and weather conditions where mud, dirt, rock or other debris may be deposited on the county roadway. All ingress and egress locations used by the harvester as a temporary harvesting driveway shall be maintained during the entire harvesting operation. All temporary harvesting driveways shall be piped by the harvester; and, upon completion of the harvesting, said pipe(s) shall be removed and the right(s)-of-way and drainage returned to its original condition by the harvester. Prior to pipe installation, Meriwether County shall inspect the proposed drive entrance and approve the necessary size and length of pipe to maintain proper road drainage.
(2) No harvester equipment, trailer, or vehicle may be parked on a county right-of-way. County right-of-way shall not he used as a loading facility for the operation.
(3) Entrance/egress/ingress signs shall be placed at 500 feet and 1,000 feet in each direction from each permitted entrance. Said signs shall be a minimum of 36 inches by 36 inches, orange and/or reflective in color and indicate "Trucks entering Hwy" or "Logging operation ahead," or similar language as may be approved by the county.
a. County Roadways used for transport of harvested products shall be maintained in passible condition for all vehicular traffic at all times, and harvester shall be responsible for any damages caused by the timber harvest operation.
b. Mud, dirt, gravel, and any other associated debris on county roadways shall be removed daily by harvester to ensure safety of traveling public.
c. Except as modified herein. The Code of Ordinances of Meriwether County, Georgia is hereby reaffirmed and restated. The codifier is hereby granted editorial license to include this amendment in future supplements of said Code by appropriate section, division, article or chapter.
Historia
(Ord. No. 2021-01, § 9-154, 2-10-2021)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.