Meriwether County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 22 - ROADS AND BRIDGES / Article III - DRIVEWAY CULVERTS
Sec. 22-56. Installation.
Sobre este texto
- As published by Municode, current through 2026-01-12
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Specifications. Driveways and culvert pipes shall be installed to the latest county specifications which may be obtained from the office of the public works department.
(b) Material. Material and size of culvert pipe shall be approved by the director of community development prior to construction. A 12-inch culvert pipe shall be the minimum; however, where drainage and grade conditions warrant, the director of community development shall require a larger size.
(1) Culvert pipe for agricultural and residential purposes shall not be less than 20 feet in length nor more than 30 feet in length. For commercial and industrial uses culvert pipes shall not exceed 40 feet in length.
(2) Culvert pipe ends shall be riprapped when required by the director of community development.
(c) Location. The end of a culvert pipe shall not be less than five feet from the side property line extended.
(d) Separation. The distance between culvert pipes shall not be less than 20 feet.
(e) Length. The total length of all culvert pipes shall not exceed 20 percent of the lot frontage in residential districts and 40 percent in industrial or commercial districts. In the event lot frontage is less than 100 feet the property owner shall be entitled to one 20-foot driveway culvert pipe.
Historia
(Code 1991, § 9-57; Ord. No. 90-0516(2), § 1, 5-16-1990)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.