Meriwether County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 36 - WATER AND SEWERAGE / Article IV - PUBLIC SEWER USE
Sec. 36-103. Regulations.
Sobre este texto
- As published by Municode, current through 2026-01-12
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) General prohibitions:
(1) No person shall direct discharge any wastewater, industrial waste, sanitary wastewater or other polluted water into any waters of the state within unincorporated the county without a NPDES permit and without first notifying the director.
(2) No person shall discharge to any stormwater conveyance within unincorporated the county any wastewater, industrial waste, sanitary wastewater or other pollutant including, but not limited to, septic tank effluent, car wash wastewater, oil, radiator fluid, laundry wastewater, roadway accident spillage and household hazardous waste.
(3) No person shall discharge any wastewater to the POTW except as authorized by the director in accordance with the provisions of this article.
(b) Pass through or interference prohibitions:
(1) General prohibitions. No person shall introduce or cause to be introduced, directly or indirectly, into the POTW any pollutant or wastewater which causes pass through or interference. These general prohibitions apply to all users of the POTW whether or not they are subject to categorical pretreatment standards or any other national, state, or local pretreatment standards or requirements.
(2) Specific prohibitions. No person shall introduce or cause to be introduced, directly or indirectly, into the POTW the following pollutants, substances, or wastewater:
a. A pollutant which by reason of its nature or quantity is, or may be, sufficient either alone or by interaction with other substances to create a fire or explosion hazard in the POTW, including but not limited to, waste streams with a closed cup flashpoint of less than 140 degrees Fahrenheit or 60 degrees Centigrade using the test methods specified in 40 C.F.R.
§ 261.21. In addition, at no time shall two successive readings on an explosion hazard meter, at the point of discharge into the system, or at any point in the system, be more than five percent or any single reading exceed ten percent of the lower explosive limit (LEL) of the substance measured. Such pollutants may include, but are not limited to, gasoline, kerosene, naphtha, benzene, toluene, xylene, ethers, alcohols, ketones, aldehydes, peroxides, chlorates, perchlorates, bromates, carbides, hydrides and sulfides;
b. A solid or viscous pollutant, or other substances, which may cause obstruction to the flow in a sewer or other interference with the operation of the POTW such as, but not limited to: grease, garbage with particles greater than one-half inch in any dimension, animal guts or tissues, paunch manure, bones, hair, hides or flashings, entrails, whole blood, feathers, ashes, cinders, sand, spent lime, stone or marble dust, metal, glass, straw, shavings, grass clippings, rags, spent grains, spent hops, waste paper, wood, plastics, gasoline, tar, asphalt residues, residues from refining, or processing of fuel or lubricating oil, mud, or glass grinding or polishing wastes;
c. Petroleum oil, non-biodegradable cutting oil or products of mineral oil origin in amounts that may cause interference or pass through;
d. Any pollutant having a pH greater than 10.0 S.U. more than one percent of the time each month or for a period exceeding 30 minutes; or any pollutant having any corrosive property capable of causing damage or hazard to structures, equipment, or personnel of the POTW; or, in no case, any discharges with pH lower than 5.0 S.U. The POTW may require continuous documentation of compliance through pH strip chart recordings;
e. Any pollutant which would either singly or by interaction with other pollutants result in the presence of noxious or toxic gases, vapors, or fumes within the POTW in a quantity sufficient to create a public nuisance or hazard to human health or to prevent entry into the sewers for maintenance, repairs, inspections, or monitoring;
f. Any pollutant, which may cause the POTW's effluent or any other product of the POTW such as residues, sludge, or scum to be unsuitable for reclamation and reuse or to interfere with the reclamation process. In no case, shall a pollutant discharged to the POTW cause the POTW to be in noncompliance with sludge use or disposal criteria, guidelines or regulations of the Act; any criteria, guidelines, or regulations affecting sludge use or disposal developed pursuant to the Solid Waste Disposal Act, the Clean Air Act, the Toxic Substance Control Act, or state criteria applicable to the sludge management method being used;
g. Any pollutant which may cause the POTW to violate NPDES permits;
h. Any wastewater with objectionable color not removed in the treatment process, such as, but not limited to, dye wastes and vegetable tanning solutions;
i. Any wastewater having a temperature which will inhibit biological activity in the POTW resulting in interference or damage to the POTW, but in no case wastewater causing the temperature at the introduction into the POTW to exceed 40 degrees Centigrade (104 degrees Fahrenheit);
j. Any pollutant, including an oxygen demanding pollutant such as, but not limited to, BOD5 or COD, released at a flow rate which will either singly or by interaction with other pollutants, cause interference with the POTW. In no case, shall a slug discharge have a flow rate for any time period longer than 15 minutes, that is more than five times the flow during normal operation;
k. Any pollutant, including an oxygen demanding pollutant such as, but not limited to, BOD5 or COD, released at a pollutant concentration or contain concentrations or quantities of pollutants, cause interference with the POTW. In no case, shall a slug discharge have pollutant concentration or contain concentrations or quantities of pollutants that exceed the average 24-hour concentration or quantities during normal operation.
l. Any pollutant containing any radioactive wastes or isotopes of such half-life or concentration as may exceed limits established under applicable state or federal regulations;
m. Any pollutant, which either alone or by interaction with other pollutants, causes a hazard to human health, creates a public nuisance, or is detrimental to the POTW;
n. Stormwater, surface water, groundwater, artisan well water, roof runoff, subsurface drainage, swimming pool drainage, condensate, deionized water, and non-contact cooling water, unless specifically authorized by the director;
o. Sludges, screenings, or other residues from the pretreatment of industrial wastes;
p. Medical wastes, except as specifically authorized by the director through an industrial wastewater discharge permit;
q. Detergents, surface-active agents, or other substances which may cause excessive foaming in the POTW; and
r. Trucked or hauled pollutants, except as allowed by the director under special circumstances.
(c) National categorical pretreatment standards. A user who falls within a regulated industrial subcategory shall comply with the national categorical pretreatment standards (40 C.F.R. §§ 405—471, as amended from time to time) for that particular industrial subcategory. If the national categorical pretreatment standards are less stringent than the state pretreatment standards or local pollutant limitations applicable to the user, the user shall comply with the more stringent standards. The national categorical pretreatment standards (40 C.F.R. §§ 405—471), as amended from time to time, are hereby incorporated by reference into this article.
(1) Where a categorical pretreatment standard is expressed only in terms of either the mass or the concentration of a pollutant in wastewater, the director may impose equivalent concentration or mass limits in accordance with subsection (g) of this section.
(2) When the limits in a categorical pretreatment standard are expressed only in terms of mass of pollutant per unit of production, the director may convert the limits to equivalent limitations expressed either as a mass of pollutant discharged per day or effluent concentration for purposes of calculating effluent limitations applicable to individual industrial user.
(3) When wastewater subject to a categorical pretreatment standard is mixed with wastewater not regulated by the same standard, the director shall impose an alternate limit in accordance with 40 C.F.R. § 403.6(e).
(d) State pretreatment standards. A user shall comply with state pretreatment standards applicable to the user. If the state pretreatment standards are less stringent than the national pretreatment standards or local pollutant limitations applicable to the user, the user shall comply with the more stringent standards. The state pretreatment standards, as amended from time to time, are hereby incorporated by reference into this article.
(e) Local pollutant limitations. No person shall discharge wastewater containing concentrations, referred to as local pollutant limitations, in excess of:
20 mg/L Ammonia nitrogen
2.1 mg/L Arsenic
1.2 mg/L Cadmium
4.5 mg/L Copper
1.75 mg/L Cyanide 100 mg/L Total fats, oils or grease (FOG)
0.60 mg/L Lead
0.02 mg/L Mercury
4.1 mg/L Nickel
1.0 mg/L Phenol
10.0 mg/L Phosphorous
1.2 mg/L Silver 20 mg/L Total Kjeldahl nitrogen
7.0 mg/L Total chromium
4.2 mg/L Zinc The above limits apply at the point where the wastewater is discharged to the POTW. All concentrations for metallic substances are for total metal unless indicated otherwise. The control authority may impose mass limitations in addition to the concentration-based limitations above.
(f) Best management practices. The director may develop BMPs, by ordinance or in individual wastewater discharge permits, to implement local limits and the requirements of subsections (a) and (b) of this section.
(g) Equivalent mass limits. When a categorical pretreatment standard is expressed only in terms of pollutant concentrations, an industrial user may request that the control authority convert the limits to equivalent mass limits. The determination to convert concentration limits to mass limits is within the discretion of the director. The control authority may establish equivalent mass limits only if the industrial user meets all the conditions listed in subsection (g)(1) and (2) of this section.
(1) To be eligible for equivalent mass limits, the industrial user must:
a. Employ, or demonstrate that it will employ, water conservation methods and technologies that substantially reduce water use during the term of its individual wastewater discharge permit;
b. Currently use control and treatment technologies adequate to archive compliance with the applicable categorical pretreatment standard, and not have used dilution as a substitute for treatment;
c. Provide sufficient information to establish the facility's actual average daily flow rate for all waste streams, based on data from a continuous effluent flow monitoring device, as well as the facility's long-term average production rate. Both the actual average daily flow rate and the long-term average production rate must be representative of current operating conditions;
d. Not have daily flow rates, production levels, or pollutant levels that vary so significantly that equivalent mass limits are not appropriate to control the discharge; and
e. Have consistently compiled with all applicable categorical pretreatment standards during the period prior to the industrial user's request for equivalent mass limits.
(2) An industrial user subject to equivalent mass limits must:
a. Maintain and effectively operate control and treatment technologies adequate to achieve compliance with the equivalent mass limits;
b. Continue to record the facility's flow rates through the use of continuous effluent flow monitoring device;
c. Continue to record the facility's production rates and notify the director whenever production rates are expected to vary by more than 20 percent from its baseline production rates determined in this article;
d. Upon notification of a revised production rate, the director will reassess the equivalent mass limit and revise the limit as necessary to reflect changed conditions at the facility; and
e. Continue to employ the same or comparable water conservation methods and technologies as those implemented pursuant to subsection (g)(1)a of this section so long as it discharges under an equivalent mass limit.
(3) When developing equivalent mass limits, the director:
a. Will calculate the equivalent mass limit by multiplying the actual average daily flow rate of the regulated processes of the industrial user by the concentration-based daily maximum and monthly average standard for the applicable categorical pretreatment standard and the appropriate unit conversion factor;
b. Upon notification of a revised production rate, will reassess the equivalent mass limit and recalculate the limit as necessary to reflect changed conditions at the facility; and
c. May retain the same equivalent mass limit in subsequent individual wastewater discharge permit terms if the industrial user's actual average daily flow rate was reduced solely as a result of the implementation of water conservation methods and technologies, and the actual average daily flow rates used in the original calculation of the equivalent mass limit were not based on the use of dilution as a substitute for treatment pursuant to subsection
(i) of this section. The industrial user must also be in compliance with subsection (q) of this section regarding the prohibition of bypass.
(4) The director may convert the mass limits to the categorical pretreatment standards of 40 C.F.R.
§§ 414, 419, and 455 to concentration limits for purposes of calculating limitations applicable to individual industrial users. The conversion is at the discretion of the director.
(5) Once included in its permit, the industrial user must comply with the equivalent limitations developed in this section in lieu of the promulgated categorical standards from which the equivalent limitations were derived.
(6) Many categorical pretreatment standards specify one limit for calculating maximum daily discharge limitations and a second limit for calculating maximum monthly average, or four-day average, limitations. Where such standards are being applied, the same production or flow figure shall be used in calculating both the average and the maximum equivalent limitation.
(7) Any industrial user operating under a permit incorporating equivalent mass or concentration limits calculated from a production-based standard shall notify the director within two business days after the user has a reasonable basis to know that the production level will significantly change within the next calendar month. Any user not notifying the director of such anticipated change will be required to meet the mass or concentration limits in its permit that were based on the original estimate of the long-term average production rate.
(h) County's right of revision. The county reserves the right to establish, by ordinance or permit, more stringent limitations or requirements on discharges to the POTW and stormwater conveyance system if the county deems it necessary in order to comply with the objectives of this article.
(i) Dilution prohibitions:
(1) No user shall ever increase the use of process water or, in any other way attempt to dilute a discharge as a partial or complete substitute for adequate treatment to achieve compliance with a pretreatment requirement or standard.
(2) Unpolluted water, including, but not limited to, county or municipal water, non-contact cooling water, or blowdown shall not be discharged to the POTW for purposes of diluting wastewater in order to reduce sewer rates or charges of the user.
(j) Fats, oil and grease. Controlled devices and other regulations regarding fats, oil, and grease interceptors are subject to the requirements of section 36-106.
(k) Control manhole requirements:
(1) Non-residential users who own, operate, or maintain a commercial or industrial facility connected to the POTW who make a new connection or modify an existing connection to the POTW shall install a control manhole unless the director determines that a control manhole is not required.
(2) Additionally, the director shall have the authority to require any user, at the user's expense, to install a control manhole if determined that such manhole is necessary to protect the POTW.
(l) Limitations on point of discharge. No person shall discharge any waste, wastewater, pollutant or other substance directly into a manhole or other opening in the POTW other than through the approved sewer lateral, except in accordance with the terms of this article or by express written permission of the director.
(m) Regulation of waste received from other jurisdictions:
(1) If another public entity located outside of the county's sewer service area, contributes wastewater to the POTW, the control authority shall enter into an inter-governmental agreement with the contributing public entity.
(2) Prior to entering into an agreement required by subsection (m)(1) of this section, the control authority shall request the following information from the contributing public entity:
a. A description of the quality and volume of wastewater discharged to the POTW by the contributing public entity;
b. An inventory of all users located within the contributing public entity that are discharging to the POTW; and
c. Such other information as the control authority may deem necessary.
(3) An inter-governmental agreement, as required by subsection (m)(1) of this section, shall contain the following conditions:
a. A requirement for the contributing public entity to adopt a sewer use ordinance which is at least as stringent as this article and local limits, including required baseline monitoring reports (BMRs) which are at least as stringent as those set out in section 36-104(c)(2). The requirement shall specify that such ordinance and limits must be revised as necessary to reflect changes made to the county's ordinance or local limits;
b. A requirement for the contributing public entity to submit a revised user inventory on at least an annual basis;
c. A provision specifying which pretreatment implementation activities, including industrial wastewater discharge permit issuance, inspection and sampling, and enforcement, will be conducted by the contributing public entity; which of these activities will be conducted by the director and which of these activities will be conducted jointly by the contributing public entity and the director;
d. A requirement for the contributing public entity to provide the director with access to all information that the contributing public entity obtains as part of its pretreatment activities;
e. Limits on the nature, quality, and volume of the contributing public entity's wastewater at the point where it discharges to the POTW;
f. Requirements for monitoring the contributing public entity's discharge;
g. A provision ensuring the director access to the facilities of users located within the contributing public entity's jurisdictional boundaries for the purpose of inspection, sampling, and other duties deemed necessary by the director; and
h. A provision specifying remedies available for breach of the terms of the inter-local agreement.
(n) Acceptance of wastewater - unusual or extraordinary circumstances. The director, acting on behalf of the POTW, may make arrangements with any person when, in the opinion of the director, unusual or extraordinary circumstances warrant acceptance of certain wastewater for treatment, subject to payment of applicable fees. Under no circumstances shall the director allow the discharge of any wastewater to the POTW, if it will violate any section of this article or which permits the person to violate any applicable pretreatment standard or requirement.
(o) Right to reject wastewater. The director shall have the right to reject wastewater and prohibit the discharge of rejected waste into the POTW. The director may require pretreatment of the wastewater when the strength or character of the wastewater is such that it could cause damage to or interfere with the operation of the POTW.
(p) Spills, slug discharges and operational upsets:
(1) Slug discharge prevention/control plan:
a. Each significant industrial user (SIU) shall provide protection from spills or slug discharges. The director shall determine if a slug discharge control plan is required by a SIU.
A SIU that is required to have a slug discharge control plan shall implement the plan and not commence discharging to the POTW until the plan has been submitted to the director.
The director's review of such plan including any facilities and operating procedures, shall not relieve the SIU from the responsibility to modify such plan as necessary to maintain compliance with applicable federal, state, and local regulations. In addition, the submission of such plan to the director shall not relieve the SIU of its responsibility to comply with all other laws and regulations governing the use, storage, and transportation of hazardous substances. The SIU shall provide and maintain all facilities needed to implement the plan.
b. The slug discharge control plan may be part of an SIU's existing contingency plan, emergency response plan, or spill plan developed under other federal, state or local regulations. At a minimum, the following elements shall be part of the submitted plan:
1. Description of discharge practices, including non-routine batch discharges;
2. Description of stored chemicals, including chemical name, amount stored and storage location;
3. Notification procedures, in accordance with subsection (p)(2) of this section, for immediately notifying the POW of spills or slug discharges, including any discharge prohibited by this article. If necessary, procedures to prevent adverse impacts from slug discharges or spills, including, but not limited to, the following:
(i) Inspection and maintenance of storage areas;
(ii) Handling and transfer of materials;
(iii) Loading and unloading operations;
(iv) Control of plant site runoff;
(v) Worker training;
(vi) Building of containment structures or equipment;
(vii) Measures for containing toxic organic pollutants, including solvents; and (viii) Measures and equipment for emergency responses.
c. Such plans shall be revised and updated whenever plant operational changes affect the validity of the plans, but in any case, not less often than every three years. Failure to comply with this requirement may result in administrative enforcement as defined in section 36-106(a). Any significant plan revisions, including revisions involving construction of new facilities, shall be submitted to the director prior to implementation of such revisions.
d. Notice to employees. A notice shall be permanently posted on the SIU's bulletin board or other prominent place advising employees who to call in the event of a spill or slug discharge. Employers shall ensure that all employees who may cause such a spill or slug discharge to occur are advised of the emergency notification procedure.
(2) Reports of spills. Slug discharges and operation upsets:
a. Oral notice. The user shall notify the county and county water and sewer authority by telephone within 15 minutes of becoming aware of any spill, slug discharge, or operation upset. The notification shall include all information known at that time, including, but not limited to location and duration of the discharge, type of waste, including concentration, pH, volume and corrective actions.
b. Written notice:
1. Within five working days following such an incident, the user shall submit to the director a detailed written report signed by the user describing the cause of the discharge and the measures to be taken by the user to prevent similar future occurrences.
2. Such notification shall not relieve the user of any expense loss, damage or other liability which may be incurred as a result of damage to the POTW, fish kills, or any other damage to person property or environment, damage to person, property or the environment.
3. Such notification shall not relieve the user of any fines, civil penalties, or other liability, which may be imposed by this article or other applicable law.
4. Following such an incident, the user may be required by the director to appear before the control authority and provide a full explanation of the discharge and of steps being taken to prevent its reoccurrence.
(q) Industrial pretreatment bypasses:
(1) Allowable bypasses. An industrial user may allow a bypass to occur if:
a. The bypass does not cause a violation of this article or a condition of the industrial user's wastewater discharge permit;
b. The bypass is for the sole purpose of allowing for essential maintenance of the facility to assure future efficient operation; and
c. The industrial user provides notification to the director as specified in subsection (q)(3) of this section.
These allowable bypasses are not subject to the provisions in subsection (q)(2) of this section.
(2) Prohibited bypasses:
a. In the event a prohibited bypass occurs, the director may take enforcement action against an industrial user for such bypass, unless the industrial user can establish to the satisfaction of the director the following conditions: Such bypass was unavoidable to prevent loss of life, personal injury or severe property damage;
1. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if, in the opinion of the director, adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent such a bypass from occurring during normal periods of equipment downtime or preventative maintenance; and
2. The industrial user complied with the notification requirements as specified in subsection (q)(3) of this section.
b. The director may approve an anticipated bypass, after considering its effects on the public, the POTW and the environment, if the director determines that it will meet the three conditions listed in subsection (q)(1) of this section.
(3) Notification of bypasses. With any bypass, the industrial user shall comply with the following notification requirements.
a. Anticipated industrial pretreatment bypasses. If an industrial user knows in advance of the need for an industrial pretreatment bypass, the director shall receive written notification from the industrial user at least 48 hours before the date of such bypass describing the cause of the bypass, the bypass's impact on any effluent limits, and the anticipated date and duration of the bypass.
b. Unanticipated industrial pretreatment bypasses. An industrial user shall notify the director of any unanticipated industrial pretreatment bypass. The notification shall include the following:
1. Oral notice to the director within 15 minutes after the industrial user becomes aware of the bypass. The notification shall include all information known at that time, including, but not limited to location and duration of the discharge, type of waste, including concentration, pH, volume and corrective actions.
2. A written report within five calendar days of the time the industrial user becomes aware of such bypass. This report shall specify the following:
(i) A description of the bypass, the cause thereof, and the bypass's impact on any effluent limits;
(ii) The volume and duration of the bypass, including if the cause of the bypass has not been corrected, the anticipated time the bypass is expected to continue;
and (iii) Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass.
(r) Compliance schedules:
(1) Any user, which is not in compliance with any limitations or requirements of this article, shall develop a compliance schedule of corrective measures to be taken in order to return to compliance. This schedule shall be submitted to the director for review and approval. If the user does not submit an acceptable schedule, the director may develop and enforce a schedule for the user. This schedule shall contain milestone dates for the commencement and completion of major events leading to the construction and operation of additional facilities required for the user to comply with this article. This may include, but is not limited to, dates relating to:
a. Hiring an engineer;
b. Hiring other appropriate personnel;
c. Completing preliminary plans;
d. Completing final plans and specifications;
e. Executing contracts for major components;
f. Commencing construction;
g. Completing construction and startup; and
h. All other acts necessary to achieve compliance with this article.
(2) Any user subject to a compliance schedule shall submit a progress report to the director no later than 14 calendar days following each date in the compliance schedule. This report shall include whether the user complied with the increment of progress to be met on that date, the reason for any delay if the date was not met, and the steps being taken to return to compliance. In no event, can more than nine months elapse between progress reports.
(s) Duty to comply. All users shall comply with all applicable local, state and federal pretreatment regulations.
(t) Certification of wastewater treatment plant operators. Any person who works at an industrial or non-industrial wastewater treatment plant in the capacity of a wastewater treatment operator shall be certified in accordance with Georgia State Code, as amended from time to time.
(u) Duty to mitigate - prevention of adverse impact. All users shall take all reasonable steps to minimize or prevent any adverse impact of any discharge in violation of this article which has a reasonable likelihood of adversely affecting human health, the POTW, the receiving stream or the environment.
(v) Hazardous waste notification:
(1) Any industrial user, discharging to the POTW as a part of its waste stream any substance which, if otherwise disposed of, would be a listed or characteristic hazardous waste under 40 C.F.R.
§ 261, shall notify the POTW in writing of such discharge. All hazardous waste notifications shall include:
a. An identification of the hazardous constituents contained in the waste as set forth in 40
C.F.R. § 261;
b. The type of discharge (continuous, batch or other);
c. An estimation of the mass of constituents in the waste stream expected to be discharged during the following 12 months; and
d. A certification that the user has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical.
(2) In the case of any new regulations under section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the user must notify the director of the discharge of such substance within 90 days of the effective date of such regulations.
(3) The director may prohibit the discharge of any waste to the POTW if it will cause endangerment to the health or welfare of persons, the environment, causes interference to the POTW or causes the county to violate any condition of its NPDES permit or the NPDES permit of any municipality that receives discharge from the county's POTW.
(4) This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this article, a permit issued hereunder, or any applicable federal or state law.
(w) Notification of changed discharge or production:
(1) All significant industrial users shall notify the POTW at least 30 calendar days in advance of any substantial change in the volume or character of pollutants in their discharge, including the listed or characteristic hazardous wastes for which the industrial user has submitted initial notification as required in subsection (v) of this section.
(2) Industrial users are required to notify the director immediately of any changes at its facility affecting the potential for a slug discharge.
(3) Any user shall notify the director immediately after becoming aware of any discharge by the user constituting a violation of this article.
(4) Any significant industrial user operating under an industrial wastewater discharge permit incorporating an equivalent mass or concentration limit calculated from a production-based standard shall notify the director within two business days after the industrial user has a reasonable basis to know that the production level will significantly change within the next calendar month. Any user not notifying the director of such anticipated change will be required to meet the mass or concentration limit in its permit that was based on the original estimate of the long-term average production rate.
(x) Combined sewers:
(1) Prohibition of new combined sewer construction. No person shall construct within unincorporated Meriwether County any new combined sewers that discharge into the POTW.
(2) New construction contributing to existing combined sewer. All new sewer construction contributing to a combined sewer shall be designed to eliminate any stormwater and surface water from the existing sewer system. Written notification to the director is required to identify and correct any existing combined sewer using the best available technology.
Historia
(Ord. No. 2019-03, § 1(14-204), 9-11-2019)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.