3.12.5. Site design detail.

Sobre este texto

  • As published by Municode, current through 2025-03-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The following standards shall be met:

(a) All utilities shall be underground and appropriate street lights provided which shall conform generally to the design of street lights employed by municipalities.

(b) All roads and streets located in this development shall be constructed to the same requirements and standards required by

the county subdivision ordinances for public roads and streets, whether such roads shall be public or private, provided that

such roads and streets shall be paved with asphalt and no triple surface treatment shall be allowed. There shall be no difference between public roads and streets

and private roads.

(c) Lot sizes and set back lines may be varied from regulations contained elsewhere in this appendix, upon appropriate request, but in such event, all streets and roads must be curbed and guttered, and lot size and set back lines must in no event be less than that mandated by county zoning regulations or state law.

(d) Private roads may serve any number of lots or residences provided that all such private roads shall be constructed with asphalt paving in accordance with the county subdivision ordinance requirements for public roads and streets.

(e) A private gated subdivision may have a gate or guard house at any entrance thereto, but no streets or roads within the development may have gates thereon.

(f) Waterlines. As a part of the development process, the developer will provide as follows:

A. Develop, construct, and install waterlines, valves, and fire hydrants sufficient to connect the subdivision

to the water system of the county, the same being identified as the "subdivision water system."

B. The construction and installation of the subdivision water system will be in accordance with the standards and specifications of the county and the county water department.

C. All construction and installation of the subdivision water system shall be in a good and workmanlike manner.

D. All construction and installation of the subdivision water system will be subject to the inspection and approval of the county and county water department.

E. The design and layout of the subdivision water system shall be subject to the approval of the county and the

county water department.

F. The materials for installation of the subdivision water system shall be subject to the approval of the county and the county water department.

G. Said subdivision water system shall be installed on the right-of-way of either public or private roads, and the county shall have an easement conveyed to it sufficient to maintain said water system, and the subdivision water system shall be conveyed to the county.

H. The subdivider shall maintain his completed work according to the provisions as stated in the maintenance bond agreement.

I. The subdivider shall be required to sign a maintenance bond agreement with the board of commissioners.

J. The contractor for the installation and construction of the subdivision water system will be suitable to the county and subject to the approval of the county.

K. The developer shall provide a stub out and valve or cap into a meter box for each lot, with meter boxes as close together as possible.

L. All residences within said subdivision must be connected to the subdivision water system.

M. In the event that the county water system is available within one (1) mile by nearest public road, then dry lines shall be installed according to the hereinabove standards and shall be connected to the county water system when such connection is available.

(g) The developer shall provide suitable access for emergency vehicles and provide appropriate proof of such access to the

county as follows:

PUBLIC SAFETY PROVISION

A gated community must provide access to all public safety vehicles including police, fire and ambulances at all times necessary, for the provision of public safety services.

1. Access must be provided by at least one

(1) of the following methods:

(a) A guard located at the main entrance that is available twenty-four

(24) hours per day;

(b) Providing an override code to the main gate for all emergency vehicles;

(c) Providing a passkey to the main gate for all emergency vehicles.

2. An override code or passkey must be provided to each public safety department ten (10) days prior to the gate being

operational.

3. If passkeys are provided, a passkey must be provided to each public safety department, including police, fire and emergency medical service ten (10) days prior to the gate being operational.

4. Any alteration of the [gate, gate lock, gate programming system (etc.)] that would affect the override code and/or passkey's capability to access the community must be submitted in writing with an acceptable substitute no later than fifteen (15) days prior to altering the gate.

5. If alterations are made to the gate without proper and prior notification that hinder the access of public safety vehicles

and obstruct the provision of public safety services, the development assumes all responsibility for damages incurred.

ROAD INSPECTIONS

PUBLIC ROADS AND PRIVATE ROADS

IN GATED COMMUNITIES

1. Pre-Conference meeting with road superintendent or designee and subdivision review officer before any work begins.

2. All inspections will be done by the road superintendent or his designee.

3. Contact road superintendent and subdivision review officer when beginning clearing, grubbing, and silt fencing. Grade and drain must comply with typical section provided by the county.

4. Road superintendent must see all pipes before covering. All crossdrain pipes need to be bedded one-half (1 /2) the diameter of the pipe with #57 stone and one (1) foot beneath the pipe. All pipe sizes must be determined by certified engineering firm.

5. Compaction tests are required for every two (2) feet of fill.

6. Must call road superintendent when subgrade is completed. Final compaction test is required on subgrade.

7. Must notify road superintendent when base material is in place [six (6) inches of compacted GABC and depth checks every 500 feet].

8. Must have final compaction and moisture test on base. Top one (1) foot: unclassified excavation 95%, subgrade compaction 98%, all bases compaction 100%.

9. Must notify road superintendent prior to priming. Prime, application, and curing time must comply with DOT specifications.

10. Must notify road superintendent prior to paving.

11. Shoulders and ditches must be graded to typical section provided by the county.

12. Fines. Five hundred dollars ($500.00) if developer does not meet specifications at each inspection.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:monroe-county/code/3.12.5@2025-03-04-ef3522ea4c

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Monroe County Code of Ordinances, 3.12.5. Site design detail | Georgia Commons