Ir al contenido
Georgia Commons
Menú

Monroe County · Código de ordenanzas

Appendix A - SUBDIVISIONS / Article V - REQUIRED SUBDIVISION IMPROVEMENTS

Section 5.9. Installation of utilities.

Sobre este texto

  • As published by Municode, current through 2025-03-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

5.9.1. Location of utilities. All utility facilities, including but not limited to gas, electric power, telephone, and cable television, shall be located underground throughout the subdivision or land development. All utilities shall be installed according to Appendix B: Monroe County Utility Placement Standards. If utilities cannot be installed according to standards, changes may be approved

by the subdivision review officer or other designee.

No private facilities shall be placed in a utility easement or street right-of-way, including but not limited to, private sprinkler systems. All utilities shall be ascertainable under the Georgia Utility Protection Act (O.C.G.A. §§ 25-9-1 et seq.)

and shall be installed by a licensed professional in accordance with O.C.G.A. §§ 43-14-1 et seq.

Prior to the installation of any utilities, the subdivider shall notify the county road department in writing.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:monroe-county/code/5.9@2025-03-04-3b608746b3

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Monroe County Code of Ordinances, Section 5.9. Installation of utilities | Georgia Commons