Monroe County · Código de ordenanzas
Appendix A - SUBDIVISIONS / Article VII - USE AND DIMENSIONAL REQUIREMENTS BY DISTRICT
75.3. Procedure for site plan approval. Prior to
Sobre este texto
- As published by Municode, current through 2025-03-04
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
the subdivision of land, cutting or grading of any street or the making of any street improvements, or the installation of utilities, the developer shall submit to the zoning administrator a site plan of the proposed manufactured home park in
accordance with the following procedures:
1. If the property being developed does not abut any part of the state highway system, the developer shall submit to the zoning administrator the site plan, along with all applicable fees and copies according to the fee schedule as adopted by the county and other documents. The board of commissioners shall act on the site plan at a regular meeting of the board of commissioners no less than five (5) calendar days and no more than sixty
(60) calendar days from the date of receipt of a complete site plan by the zoning administrator. A site plan must be submitted to the zoning administrator by noon on the Thursday immediately preceding
a Tuesday county commissioners meeting.
2. If the property being developed includes or abuts any part of the State highway system, the developer shall submit to the zoning administrator a site plan, along with all applicable fees and copies according to the fee schedule as adopted by the county and other documents. The zoning
administrator shall forward three (3) copies of the site plan and other documents to the state department of transportation. The board of commissioners shall act on the site plan at a regular meeting of the board of commissioners no
less than five (5) calendar days and no more than sixty (60) calendar days from the date of receipt of a complete site plan by the zoning administrator or at the next regular meeting of the board of commissioners no less than five (5) calendar days from date of receipt of the decision of the state department of transportation by the zoning administrator, whichever is later. Site plans for the development of property abutting the
state highway system that do not include all necessary requirements shall not be considered complete. Approval of a site plan does not relieve the developer of the requirements to obtain a commercial driveway permit from the state department of transportation.
3. State department of transportation recommendations. The zoning administrator shall submit three (3) copies of the site
plan to the state department of transportation if the proposed development includes or abuts on any part of the state highway
system. The department of transportation, within thirty (30) days of receipt of the plan, shall recommend approval or
disapproval and note its recommendation on the copy to be returned to the zoning administrator. Failure of the
department of transportation to act within this 30-day period shall constitute approval. If the plan is recommended for disapproval, the reasons for disapproval and requirements for approval shall be given to the zoning administrator in writing; but such recommendations shall be advisory only and shall not be binding on the board of commissioners. Approval of a site plan does not relieve the developer of the requirement to obtain a commercial driveway permit from the state department of transportation.
4. Following the hearing of the site plan and other related material, the board of commissioners may express preliminary approval noting the conditions of such approval on four (4) copies of the site plan with one (1) copy being returned to the developer, one (1) copy to the county health department, one (1) copy to the zoning administrator, and one (1) copy to be added to the records of the board of commissioners.
5. Approval shall expire and be of no further effect twelve (12) months from the date of the approval unless the time is extended by the board of commissioners.
6. Notice of hearing. Notice of the time and place of hearing shall be sent to the address of the developer not less than five (5) days before the date fixed therefore. It shall be the responsibility of the zoning officer to send said notice.
The hearing referred to in this section shall be noticed, conducted, and decided according to rules and standard contained in sections 101, 102, 103, 104 and 105.
7. Review of preliminary plat. The zoning administrator shall check the site plan for conformance to the rules and regulations of these regulations and report his or her findings and recommendations to
the board of commissioners, which shall afford a hearing on the site plan.
8. Following the hearing of the site plan and other related material, the board of commissioners may find reasons detrimental to the public safety, health, and general welfare, or in conflict with adopted plans of the board of commissioners which required the disapproval of the site plan. A statement of the reasons for
disapproval shall be made on two (2) copies of the site plan with one (1) copy being returned to the developer and one
(1) copy being added to the records of the board of commissioners. The applicant may reapply for site plan approval, after any recommended changes have been made, in the same manner that the original site plan was submitted.
9. Failure of the board of commissioners to act on the site plan within the timeframe specified, without due cause, shall be deemed to be approval of the site plan, and a certificate of approval shall be issued by the board of commissioners on demand provided, however, that the developer may waive this requirement and consent to an extension of time.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.