Monroe County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 8 - ROADS AND BRIDGES / Article III - TIMBER HARVESTING
Sec. 8-52. Notice requirements.
Sobre este texto
- As published by Municode, current through 2025-03-04
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The notice of harvesting operations required by this article shall be provided for each separate tract to be harvested. Such notice shall be made in such form as prescribed by rule or regulation of the Director of the Georgia Forestry Commission, and shall include the following information:
(a) A map of the area which identifies the location of the tract to be harvested and, as to those trucks which will be traveling to and from such tract for purposes of picking up and hauling loads of cut forest products, the main point of ingress to such tract from a public road and, if different, the main point of egress from such tract to a public road. If multiple points of ingress and/or egress will be used, all such points shall be identified;
(b) A statement as to whether the timber will be removed pursuant to a lump sum sale, per unit sale, or owner harvest for purposes of ad valorem taxation under O.C.G.A. §48-5-7.5;
(c) The name, address, and daytime telephone number of the timber seller if the harvest is pursuant to a lump sum or per unit sale of the timber owner if the harvest is an owner harvest;
and
(d) The name, business address, business telephone number, and nighttime or emergency telephone number of the person or firm harvesting such timber.
Historia
(Ord. of 02-02-2021, § 1)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.