Application for a permit for any telecommunication facility shall be made to the department by the person, company or organization that will
own and operate the telecommunications facility.
An application will not be considered until it is complete. The administrator is authorized to
develop application forms to assist in providing the required information and facilitate the application process. Except for a co-location information submittal under section 86.5.2 of this section, the following information shall be submitted
when applying for any permit required by this section and must be submitted for an application to be considered complete:
a. Site plan or plans to scale specifying the location of telecommunications facilities, transmission building and/or other accessory uses, access, parking, fences, landscaped areas, and adjacent land uses.
b. Landscaped plan to scale indicating size, spacing and type of plantings required in section 87.4.8.
c. A full description of the environment surrounding the proposed telecommunications facility, including any adjacent residential structures and districts,
structures and sites of historic significance, streetscapes or scenic view corridors.
d. A description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personnel needs, equipment needs, and traffic, noise or safety impacts of such
maintenance.
e. Report from a professional qualified engineer licensed in the state or other appropriate qualified industry expert, documenting the following:
1. Tower or antenna type, height, and design;
2. Engineering, economic, and other pertinent factors governing the selection of the proposed design.
3. Total anticipated capacity of the telecommunications facility, including numbers and types of antennae which can be accommodated;
4. Evidence of structural integrity of the tower or alternative tower structure;
5. Structural failure characteristics of the telecommunications facility and demonstration that site and setbacks are of adequate size to contain debris;
and
6. Certification that the antenna(e) and related equipment or appurtenances comply with all current regulations of the FCC, with specific reference to FCC regulations governing nonionizing electromagnetic radiation (NIER), and that radio frequency
levels meet the American National Standards Institute (ANSI) guidelines for public safety.
f. Identification of the geographic service area for the subject installation, including a map showing the site and the nearest or associated
telecommunications facility sites within the network. Describe the distance between the telecommunications facility sites. Describe how this service area fits into and is
necessary for the service network (i.e., whether such antenna or tower is needed for coverage or capacity).
g. If the proposed site is zoned R-residential, applicants must describe why an alternate site zoned commercial, agricultural, or industrial was not proposed by identifying:
1. What good faith efforts and measures were taken to secure such an alternate site;
2. Why such an alternate site was not technologically, legally or economically feasible and why such efforts were unsuccessful; and
3. How and why the proposed site is essential to meet service demands for the geographic service area.
The department will review with special care justifications that appeal only to undue expense and/or to undue difficulties in entering into a lease agreement. The department
shall carefully weigh such claims, and the evidence presented in favor of them, against a project's negative impacts at the proposed site.
h. The applicant must provide a utilities inventory showing the locations of all water, sewage, and drainage
and power line easements impacting the proposed tower site.
i. The applicant must provide any other information that may be requested by the department to fully evaluate and review the application and the potential impact of a proposed telecommunications facility.
87.5.2. Tower co-location information submittals. Any person or entity co-locating an antenna or antennae which will add no more than ten (10) feet to the height of the tower and related
equipment or appurtenances on or around a tower for which a permit has already been issued shall submit the following information only:
a. The name or entity co-locating the antenna.
b. The name of the owner of the tower.
c. The tower's permit number.
d. The location of the tower.
e. The remaining structural capacity of the tower.
f. Certification that the antenna(e) and related equipment or appurtenances comply with all current regulations of the FCC, with specific reference to FCC regulations governing non-ionizing electromagnetic radiation (NIER), and that the radio frequency levels meet the American National Standards Institute (ANSI) guidelines for public safety.
87.7. Conditional use permit required.
87.7.1. General. If the proposed location, height, setback or other aspect of a proposed tower or antenna cannot comply with the minimum requirements established in this section, then a conditional use permit shall be required for the construction of a tower or the placement of an antenna in any zoning district.
All such uses shall comply with requirements set forth in this section and all other applicable
codes and ordinances, unless the applicant can show that the denial of a permit in such a location will cause a significantly harmful and permanent degradation of service which cannot
be overcome by any other means including planned or potential locations which would provide the
same or similar coverage or capacity.
In granting a conditional use permit, the governing authority may impose conditions to the extent that it concludes such conditions are necessary to minimize adverse effects from the proposed
tower on adjoining or nearby properties as set out in section 87.7.6 and may grant variances to the development restrictions required by this
chapter or any other ordinance provided such variances do not have a negative effect upon surrounding property.
87.7.2. Application; contents; fee. All applications for conditional use permits shall be submitted to the county zoning department. Each application shall contain as a part thereof detailed plans and specifications as set forth in section
87.5. An application for a conditional use permit shall not be accepted for processing without the information required in section 87.5. An application fee shall be charged by the department in the amount stated in section 87.10.