Montgomery County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 16 - MANUFACTURED HOMES, MOBILE HOMES AND SITES / Article IV - MANUFACTURED HOMES
Sec. 16-97. Final Inspection forms required.
Sobre este texto
- As published by Municode, retrieved 2026-11-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) The building official will develop and make available all those minimally required forms, applications, checklist, and procedure guides necessary to assist the consumer and installer(s) in complying with and maintaining the requirements of this article.
(b) A final inspection compliance document will be issued by the Building Official (and maintained on file therein), only upon satisfactory completion of the requirements of this article.
(c) All manufactured housing installations must meet the manufacturer's specifications and/or the specifications of this article before permanent utilities (water, sewage and electrical) may be activate or utilized.
(d) Permanent electrical service for the manufactured housing will not be activated, and may be disconnected by order of the Building Official until such time as the manufactured housing installation meets all of the safety requirements of this article and the final inspection form from the Building Official is completed, and is provided by the citizen to the area electrical service provided.
(e) In the case of hardship, temporary utility connections shall be approved, for a period not to exceed 60 days, in writing by the Board of County Commissioners.
Historia
(Ord. of 8-2-2005(1), § 12)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.