Sec. 14-353. Code compliance; work commencement; extension.
Sobre este texto
- As published by Municode, current through 2023-09-05
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) A permit shall be a license to proceed with the work, not authority to violate, cancel, alter or set aside any of the provisions of the technical codes. Nor shall issuance of a permit prevent the building official from requiring correction of errors in plans, construction, or violations of this Code.
(b) Every permit issued shall become invalid if:
(1) The work authorized is not commenced within six months after issuance; or
(2) The work authorized by such permit is suspended or abandoned for six consecutive months after the work is commenced.
(c) One or more extensions of time, for periods not more than 90 days each, may be allowed for the permit. The extension shall be requested in writing and justifiable cause demonstrated.
Extensions shall be in writing by the building official.
Historia
(Code 2000, § 36-108(3.6.1))