Newton County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 50 - WATER RESOURCE MANAGEMENT / Article III - WATER RESOURCES MANAGEMENT / Division 4 - POST-CONSTRUCTION STORMWATER MANAGEMENT

Sec. 50-148. Permit procedures and requirements.

Sobre este texto

  • As published by Municode, current through 2023-04-18
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Permit application requirements. No owner or developer shall perform any land development activities without first meeting the requirements of this division prior to commencing the proposed activity. Unless otherwise exempted by this division, or granted a waiver to meeting the minimum requirements outlined in the county stormwater LDM, a land-disturbance permit application shall be accompanied by the following items in order to be considered:

(1) Stormwater concept plan and consultation meeting certification if required by subsection (b) of this section;

(2) Stormwater management plan;

(3) Inspection and long-term maintenance agreement;

(4) Stormwater tax assessment area, if applicable;

(5) Performance bond, if applicable; and

(6) Land-disturbance permit application and applicable review fees.

(b) Stormwater concept plan and consultation meeting. Projects that are complex in nature may require a stormwater concept plan and consultation prior to submittal of design plans for review by the county.

The stormwater concept plan shall meet the requirements outlined in the LDM. For the purposes of this section, any proposed development activity that meets any of the following criteria shall be required to prepare a stormwater concept plan and participate in a consultation meeting prior to submission of engineering plans for review.

(1) Any residential subdivision with greater than 50 lots, unless such development contains twoacre or greater lots.

(2) Any non-residential development with a disturbed area of ten acres or greater.

(3) Any non-residential development regardless of size which has an impervious surface coverage that covers 50 percent or more of the property excluding those lands contained within undisturbed buffers including, but not limited to, floodplains, stream buffers and undisturbed buffers between dissimilar zonings.

(4) Any non-residential development regardless of size, which is defined as a hot spot land use.

(c) Stormwater management plan requirements. The stormwater management plan must be submitted in accordance with the LDM.

(d) Inspection and maintenance agreement. The applicant or owner of the land involved in a land development project requiring a stormwater management facility or practice hereunder and for which the county requires ongoing maintenance must execute a stormwater management inspection and maintenance agreement that shall be binding on all subsequent owners of the site or any portion thereof.

(1) Approval and recording of inspection and maintenance agreement. The inspection and maintenance agreement shall require approval by the director prior to final plat approval or final site plan approval. The agreement shall be recorded by the property owner in the land records of the county. A covenant running with the land will describe said agreement and the obligation of all present and future holders of any interest in the development or any portion thereof. Said covenant shall be recorded on the deed of every parcel of property and/or lot that is derived in any way from the land development activity. Thereafter, each deed shall be recorded in the county deed records.

(2) Required contents.

a. The stormwater management inspection and maintenance agreement shall identify by name and official title, if applicable, the person bound by said agreement to cause said inspection and maintenance. For residential developments, responsibility for the operation and maintenance of the stormwater management facility or practice shall remain that of the party which executed the stormwater management inspection and maintenance agreement unless and until such time as the duties hereunder are properly assumed by a homeowners' association which is created as specified in this section. Evidence of the assumption of such duties shall be in a writing executed by the party assigning said duties and the homeowners' association.

b. The duties created under the inspection and maintenance agreement shall transfer to each and every subsequent owner/applicant, or homeowners' association (where one is established and duties are assigned thereto, in accordance with this division), or similar holders of interest in the development or any portion thereof. Upon transfer, each owner/ applicant, homeowners' association, or similar interest holder shall cause the deed of transfer to be marked upon its face with notice of obligations of the inspection and maintenance agreement through use of a restrictive covenant, as previously described.

Each successor in title shall be bound by the inspection and maintenance agreement to all the duties of his/her/their predecessor thereunder.

c. The stormwater inspection and maintenance agreement shall incorporate by reference the project's operation and maintenance plan and account for all the work requirements specified in the plan.

d. The inspection and maintenance agreement shall provide that preventive maintenance inspections of infiltration systems, retention, or detention structures may be made by the county, at its option. The county's inspection schedule shall be established on a frequency that meets the intent of this division and applicable regulatory compliance requirements bestowed on the county.

e. Right-of-entry for inspection. The terms of the inspection and maintenance agreement shall provide for the director or his/her/their designee to enter the property at reasonable times and in a reasonable manner for the purpose of inspection. This includes the right to enter a property when there is a reasonable basis to believe that a violation of this division is occurring or has occurred and to enter when necessary for abatement of a public nuisance or correction of a violation of this division.

f. The inspection and maintenance agreement shall provide that the county shall notify the property owner of the facility of any violation, deficiency or failure to comply with the agreement. The agreement shall also provide that upon a failure to correct violations requiring maintenance work or failure to provide an action plan for correcting such violation within ten business days after notice thereof, the county may provide for all necessary work to place the facility in proper working condition. The owner of the facility shall be assessed the costs of the work performed by the county, and there shall be a lien on every parcel of property and/or lot that is derived in any way from the land development activity. If a stormwater tax assessment area has been established, the costs of the work performed shall be collected as provided in subsection (e) of this section. Should such a lien be filed, portions of the affected property may be released by the county following the payments by the owner of such portion of the property of such owner's pro-rata share of the lien amount based upon the acreage to be released with such release amount to be determined by the county board of commissioners.

(3) Additional requirements for residential subdivisions. In lieu of an inspection and maintenance agreement, the county board of commissioners may, at its discretion, accept dedication of any existing or future stormwater management facility for perpetual maintenance by the county, provided such facility meets all the requirements of this division, the LDM and includes adequate and perpetual access and sufficient area, by easement or otherwise, for inspection and regular structural maintenance by the county. In the event the county accepts dedication of any stormwater management facility for a residential subdivision, the resolution creating the stormwater tax assessment area for the subdivision required by subsection (e)(1) of this section, shall specify the fee for routine inspection, maintenance and repair activities to be performed by the county. In addition, the resolution creating the stormwater tax assessment area may specify a fee to offset potential non-routine maintenance and repair expenditures by the county. These funds shall be maintained in a designated account for the stormwater tax assessment area activities. Collection of the amount for non-routine maintenance and repair shall be suspended once the account contains an amount necessary, as determined by the director, to rebuild the stormwater facilities. The board of commissioners may revise said fees by resolution no earlier than 30 days after written notice to the participants in the stormwater tax assessment area.

(e) Stormwater tax assessment area.

(1) Establishment of a stormwater tax assessment area. Prior to final plat approval, the developer of any common development subject to the provisions of this article shall establish a stormwater tax assessment area that shall thereafter encompass the development, each subdivision thereof, and any other property that is alleged to be covered/served by the stormwater management plan.

The stormwater tax assessment area shall be established within the county upon a petition presented to the board of commissioners by the developer of any new subdivision or any additional unit or phase of an existing large subdivision which has been approved for development in units or phases. The petition shall be accompanied by appropriate forms, to be promulgated by the county, which shall at least list thereon the legal description and the district, land lot, block and/or lot of each parcel or tract of land affected by the proposed stormwater tax assessment area. Approval of the petition shall be by majority vote of the board of commissioners. Upon approval, the board shall establish, by appropriate resolution, the particular stormwater tax assessment area for which the petition has been submitted. The establishing resolution shall state the charge or fee for such service or the basis for computation and adjustment of the charge or fee.

(2) Determination and collection of charges and fees incident to the establishment of stormwater tax assessment area.

a. At the time of the approval of the petition by the board of commissioners, a copy of the resolution establishing the stormwater tax assessment area shall be transmitted to the county tax commissioner. The tax commissioner shall be responsible for the collection of any and all charges and fees which are established by the board pursuant to subsection (e)(1) of this section. Said charges and fees may be imposed against any business, resident or other property served by the stormwater management plan.

b. Property owners within a stormwater tax assessment area shall be billed annually through their regular ad valorem county tax bill for the cost to the county of county performance of inspection, maintenance and repair activities on privately-owned stormwater management facilities and practices during the 12 months proceeding the end of the county's fiscal year ending June 30 of the applicable tax year. The rate for stormwater tax assessment areas shall be determined based on the total cost incurred by the county in inspecting, maintaining and repairing these facilities in the applicable tax year divided by the number of non-exempt parcels which exist in all stormwater tax assessment areas in existence in the county in the applicable tax year.

c. A parcel that exists in a stormwater tax assessment area shall be exempt from the stormwater tax assessment if all requirements set forth in the inspection and maintenance agreement have been met and all necessary documentation thereof has been submitted to and approved by the director. The determination of applicability of exemption shall be made on a yearly basis by the director. For residential subdivisions, individual lots shall not be exempt, all property owners shall be considered exempt or non-exempt based on the work performed for that subdivision.

(f) Maintenance bonds.

(1) Prior to final plat approval of all subdivision development projects, the developer shall submit to the director a bond or irrevocable letter of credit for the purpose of guaranteeing the materials and workmanship of all stormwater control measures associated with the development for a period of two years from the issuance of the final plat or until the issuance of 75 percent of the certificates of occupancy for the subdivision development, whichever is greater.

The bond amount shall be calculated by the director and provided to the developer upon completion of field activities and submittal of the final plat to the county planning and development department.

(2) If, during the bond period, the need for repairs to any of the stormwater control measures becomes evident then the developer will be notified in writing by the director and informed of the measures to be taken to repair the facilities. If the developer has not taken significant action, as determined by the director, within 30 days of said notification, the director shall take such steps as are necessary to claim an amount of the funds from the bond or letter of credit which, as estimated based upon no less than two bids secured by the director, will cover all costs and expenses the county will incur in causing the repairs to be made.

(g) Modifications for off-site facilities.

(1) The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made with the director to manage stormwater by an off-site, or regional facility. The off-site or regional facility:

a. Must be located on property legally dedicated for the purpose;

b. Must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices; and

c. There must be a county-approved, legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. In addition, on-site measures shall be implemented, where necessary, to address stormwater management issues upstream and downstream from the development site to the off-site or regional facility.

(2) A stormwater management plan must be submitted to the county, which shows the adequacy of the off-site or regional facility.

(3) To be eligible for a modification, the applicant must demonstrate to the satisfaction of the county that the use of an off-site or regional facility will not result in the following impacts to upstream or downstream areas:

a. Increased threat of flood damage to public health, life, and property;

b. Deterioration of existing culverts, bridges, dams, and other structures;

c. Accelerated streambank or streambed erosion or siltation;

d. Degradation of in-stream biological functions or habitat; or

e. Water quality impairment in violation of state water quality standards, and/or violation of any state or federal regulations.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. O-090506, § 400-050, 9-5-2006)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:newton-county/code/50-148@2023-04-18-6f2e8f0ec9

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Newton County Code of Ordinances, Sec. 50-148. Permit procedures and requirements | Georgia Commons