Ir al contenido
Georgia Commons
Menú

Oconee County · Código de ordenanzas

Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 10 - PROJECT DESIGN AND CONSTRUCTION STANDARDS / Division I - PROJECT DESIGN

Sec. 1017.01. Location of utilities in streets.

Sobre este texto

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

a. Utility lines shall be located in accordance with the street cross sections contained herein, or at such other locations as may be approved by Oconee County. Any underground utilities shall be installed with the surface having the same compaction as that of the paved way and marked on the plat to indicate the location of the underground utilities.

b. The subdivider shall install sewer mains, sewer laterals, water mains and services extended to the property line of each lot, in accordance with accepted engineering practices, the approved subdivision construction plans, and the Oconee County Water and Wastewater Standards.

c. In cases where public water and sewer services are not available, the minimum lot sizes shall conform to those set forth in this development code.

d. Design criteria for storm drain facilities shall conform to accepted engineering practices and guidance documents. Pipe materials shall conform with all criteria set forth in the "Guidelines for Storm Sewer Piping" Section of the Erosion Control and Stormwater Management Article of this Development Code.

e. Site lighting shall be oriented to the interior of the site so as not to impose glare or objectionable light levels on the neighboring residential property.

f. Water mains for both domestic use and fire protection shall be properly connected with the public water system, or with an alternate water supply approved by the county and Georgia EPD. The lines shall be constructed in such a manner as to adequately serve all lots shown on the subdivision plat. The lines shall be installed in conformance with the Oconee County Water and Wastewater Standards. The County will require network distribution analysis of the water distribution system for any development that the peak hour water demand is equal to or exceeds 50 gpm.

g. Above-ground utilities. All fire hydrants, utility poles, street lights, transformer boxes and pedestals, and other public or private utility structures placed above ground within a public street right-of-way or private street easement must be at least six feet back from the back of the street curb (or edge of pavement).

h. Underground Utilities.

(1) All electric, telephone, cable TV and other wires shall be placed underground in any major subdivision, and in any multi-family or nonresidential development.

(2) Utilities placed underground within a public street right-of-way or private street easement shall be located as shown on the Utility Location CrossSections in this development Code, above. Where no public or private street exists or is proposed (such as in a shopping center), utilities shall be placed in accordance with the development plans as approved by Oconee County.

(3) The right-of-way is to be cleared and rough graded the full width prior to any utility installation.

(4) Underground utilities including sewer services, all water lines and any cable conduits under the pavement shall be placed in the ground before the base material is in place, or the pipes shall be bored if installed after street construction.

(5) All trenches shall be thoroughly compacted in six-inch layers with mechanical compacting equipment.

(6) The facilities for underground utilities such as sewer, water, and gas, including sewer and water laterals to each lot line when laid in streets, shall be in place prior to surfacing of streets. All facilities for utilities shall be placed in easements provided for that purpose in the subdivision.

(7) Any disturbance or construction in the completed (seeded and/or sodded) right-of-way by a public utility such as power, gas, phone and cable must be repaired or replaced with the specified materials as called for in the initial improvements.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:oconee-county/code/1017.01@2026-04-07-f651c52423

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Oconee County Code of Ordinances, Sec. 1017.01. Location of utilities in streets | Georgia Commons