Oconee County · Código de ordenanzas
Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 11 - EROSION CONTROL AND STORMWATER MANAGEMENT / 1102 - Standards incorporated by reference.
Sec. 1102.01. Stormwater management.
Sobre este texto
- As published by Municode, current through 2026-04-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The design, construction, operation and maintenance of the stormwater system, including stormwater detention facilities and all conveyances whether piped or open, shall conform to the provisions of the Georgia Stormwater Management Manual, published August 2001 and as may be amended by local addenda of Oconee County from time to time, or as periodically updated or expanded based on improvements in science, engineering, monitoring or local maintenance experience.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.