Sec. 1220.04. Process for approval of development permit.

Sobre este texto

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

An application for a development permit may proceed simultaneously with an application for project approval after two reviews of a preliminary subdivision plat or site plan, but may not be issued prior to approval of such plat or plan by the Planning Department. The development permit plan shall include all required items from Sec. 1216.04. Contents of preliminary plat or preliminary site plan submission.

a. The application for a development permit shall be submitted to the Planning Department and must include the following:

(1) Application on the form furnished by the Planning Department, requesting review for issuance of a development permit.

(2) Copies in the number required by the Planning Director of:

(a) The preliminary plat or preliminary site plan requesting or reflecting project approval by the Planning Director.

(b) The construction plans prepared in conformance with the specifications and standards in this Development Code under Sec. 1221, below.

(3) Two copies of the hydrology study.

(4) Payment of any development permit fee, as established from time to time by the Board of Commissioners.

b. The application will be checked for completeness within 5 work days of its submission. Incomplete applications will be returned to the applicant, who shall have 3 work days in which to resubmit the application complete in all respects.

c. Upon acceptance of a development permit application, the Planning Director shall:

(1) Refer the soil erosion and sedimentation control plan to the Soil & Water Conservation District for their review and approval or disapproval concerning the adequacy of the erosion and sedimentation control plan. No development permit will be issued unless the plan has been approved by the District and the Planning Department, and any variances and bonding, if required, have been obtained.

(2) Refer the grading plan, the stormwater management plan, the floodplain management/flood damage prevention plan (if any), and the street improvements plan to the Public Works Department for its review and approval or disapproval. No development permit will be issued unless the plans have been approved by the Public Works Department.

(3) Refer the water and sewerage public utility plans to the Water Resources Department for its review and approval or disapproval.

(4) Refer the on-site septic system plans to the County Health Department for its review and approval or disapproval.

d. The applicant may be required by the Planning Director to secure development approval from other agencies if they are affected by the development. Development approval may be required from but not limited to:

(1) Fire Marshal.

(2) Georgia Department of Transportation.

(3) Georgia Department of Natural Resources.

(4) U.S. Army Corps of Engineers.

(5) U.S. Environmental Protection Agency.

e. Upon receipt of comments from other departments and agencies, and upon review by the Development Review Committee, the Planning Director will indicate on one or more copies of the development construction plans or in writing all comments related to compliance with this Development Code, conditions of zoning approval, and other regulations or ordinances, as appropriate.

f. The Planning Director will forward all comments to the applicant.

g. Approval, denial or comments, if any, shall be provided to the applicant as soon as practical, but in no case more than 60 days from receipt of a complete application for a development permit.

h. The applicant will be responsible for compliance with all codes, regulations and zoning requirements and for the satisfaction of all of the comments received. The owner will also be responsible for obtaining approval from all other agencies affected by the project.

i. No development permit will be issued unless the applicant provides a statement by the County Tax Commissioner's office certifying that all ad valorem taxes levied against the property and due and owing have been paid.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. of 2-4-2025(1), Exh. A)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:oconee-county/code/1220.04@2026-04-07-5d3f1ef6b9

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Oconee County Code of Ordinances, Sec. 1220.04. Process for approval of development permit | Georgia Commons