Ir al contenido
Georgia Commons
Menú

Oconee County · Código de ordenanzas

Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 12 - PROCEDURES AND PERMITS / Division IV - OTHER PERMITS

Sec. 1223.03. Activities to comply with site plan.

Sobre este texto

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

All development and building construction activities or site work conducted after approval of the aquifer protection site plan shall conform with the specifications of said site plan.

Significant changes to the site plan, that would alter the amount and velocity of storm water runoff from the site, increase the amount of impervious surface within the development, alter the overall density of development, result in a considerable increase in the amount of excavation, fill, or removal of vegetation during construction, or otherwise result in an alteration of the overall appearance of the development as proposed, can be amended only with the approval of Oconee County. Minor changes, such as realignment of streets, or minor alterations to drainage structures and other infrastructure, to meet unexpected conditions, are exempted from this requirement.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:oconee-county/code/1223.03@2026-04-07-8541fa9e87

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Oconee County Code of Ordinances, Sec. 1223.03. Activities to comply with site plan | Georgia Commons