Oconee County · Código de ordenanzas
Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 12 - PROCEDURES AND PERMITS / Division IV - OTHER PERMITS / 1227 - Permit to move a building.
Sec. 1227.06. Improvements by owner required; building permit.
Sobre este texto
- As published by Municode, current through 2026-04-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a. The owner of any house, building or other structure proposed to be moved shall make all necessary improvements required in order for said house, building or other structure to comply with the requirements of the building, electrical, plumbing and mechanical codes within 90 days from the date the house, building or other structure is moved into the county and placed on the site where it shall be permanently located. The owner shall be required to acquire a building permit from the Planning Director prior to placement of the house, building or other structure in accordance with Sec. 1225.
b. No house, building or other structure may be occupied by any person until a certificate of occupancy is granted by the Planning Director in accordance with Sec. 1225.04.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.