Oconee County · Código de ordenanzas
Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article III - SEWERS / Division 2 - NONDOMESTIC (INDUSTRIAL, COMMERCIAL, INSTITUTIONAL) USE OF PUBLIC WASTEWATER FACILITIES
Sec. 66-424. Sampling and testing procedures.
Sobre este texto
- As published by Municode, current through 2026-04-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Sampling procedures.
(1) Except as indicated in subsection (a)(2) of this section, the user must collect wastewater samples using flow proportional composite collection techniques. In the event flow proportional sampling is infeasible, the director may authorize the use of time
proportional sampling or a minimum of four grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged.
In addition, grab samples may be required to show compliance with instantaneous discharge limits.
(2) Samples for oil and grease, temperature, pH, cyanide, phenols, hexavalent chromium, sulfides, and volatile organic compounds must be obtained using grab collection techniques.
(b) Testing procedures.
(1) All wastewater monitoring samples required by the county shall be tested by an independent laboratory for the parameters required, with the results submitted to the county on the original laboratory report sheets.
(2) All measurements, tests, and analyses of the characteristics of waters and wastes to which reference is made in this article shall be determined in accordance with the latest edition of "Standard Methods for the Examination of Water and Wastewater," published by the American Public Health Association, or in accordance with any applicable EPA testing procedure of general acceptance in the chemical testing industry; provided, however, that all such analyses shall be determined in accordance with the requirements of 40 CFR 136, which requirements shall prevail in the event of conflict.
(3) The cost incurred for testing shall be the responsibility of the customer.
Historia
(Ord. of 2-4-2003, § 14)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.