Oconee County · Código de ordenanzas
Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article III - SEWERS / Division 2 - NONDOMESTIC (INDUSTRIAL, COMMERCIAL, INSTITUTIONAL) USE OF PUBLIC WASTEWATER FACILITIES
Sec. 66-427. Reporting requirements.
Sobre este texto
- As published by Municode, current through 2026-04-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Baseline monitoring reports.
(1) Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the POTW shall submit to the director a report which contains the information fisted in subsection (a)(2) of this section. At least 90 days prior to commencement of their discharge, new sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall submit to the director a report which contains the information listed in subsection (a)(2) of this section. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged.
(2) Users described in subsection (a)(1) of this section shall submit the information set forth in this subsection (a)(2).
a. Identifying information. The name and address of the facility, including the name of the operator and owner.
b. Environmental permits. A list of any environmental control permits held by or for the facility.
c. Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation carried out by such user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes.
d. Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 CFR 403.6(e).
e. Measurement of pollutants.
1. The categorical pretreatment standards applicable to each regulated process.
2. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the director, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and longterm average concentrations, or mass, where required, shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in section 66-424.
3. Sampling must be performed in accordance with procedures set out in section 66-424.
f. Certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O & M) and/or additional pretreatment is required to meet the pretreatment standards and requirements.
g. Compliance schedule. If additional pretreatment and/or O & M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O & M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in section 66-427(b).
h. Signature and certification. All baseline monitoring reports must be signed and certified in accordance with section 66-423.
(b) Compliance schedule progress reports. The following conditions shall apply to the compliance schedule required by subsection (a)(2)g. of this section:
(1) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation);
(2) No increment referred to above shall exceed nine months;
(3) The user shall submit a progress report to the director no later than 14 days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule; and
(4) In no event shall more than nine months elapse between such progress reports to the director.
(c) Periodic compliance reports:
(1) All significant industrial users shall, at a frequency determined by the director but in no case less than twice per year (in June and December), submit a report indicating the nature and concentration of pollutants in the discharge which are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. All periodic compliance reports must be signed and certified in accordance with section 66-423.
(2) All other users who have been issued discharge permits are required to submit compliance reports at the intervals set forth in each user's individual permit. The compliance reports shall address the discharge parameters and all other information indicated as being necessary to report as shown in the user's permit.
(3) All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge.
(4) If a user subject to the reporting requirement in this section monitors any pollutant more frequently than required by the director, using the procedures prescribed in section 66-424, the results of this monitoring shall be included in the report.
(d) Reports on compliance with categorical pretreatment standard deadline. Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the POTW, any user subject to such pretreatment standards and requirements shall submit to the director a report containing the information described in subsection (a)(2)d—f of this section.
For users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the user's longterm production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with section 66-423.
(e) Reports of changed conditions. Each user must notify the director of any planned significant changes to the user's operations or system which might alter the nature, quality, or volume of its wastewater at least 60 days before the change.
(1) The director may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under section 66-426.
(2) The director may issue a wastewater discharge permit under section 66-426 or modify an existing wastewater discharge permit under section 66-426 in response to changed conditions or anticipated changed conditions.
(3) For purposes of this requirement, significant changes include, but are not limited to, flow increases of 20 percent or greater, and the discharge of any previously unreported pollutants.
(f) Reports of potential problem, including slug loading.
(1) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a nonroutine, episodic nature, a noncustomary batch discharge, or a slug load, that may cause potential problems for the POTW, the user shall immediately telephone and notify the industrial pretreatment coordinator of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user.
(2) Within five days following such discharge, the user shall, unless waived by the director, submit a detailed written report describing the cause of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the user of any fines, penalties, or other liability which may be imposed pursuant to this article.
(3) A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees whom to call in the event of a discharge described in subsection (f)(1) of this section. Employers shall ensure that all employees, who may cause such a discharge to occur, are advised of the emergency notification procedure.
(g) Reports from unpermitted users. All users not required to obtain a wastewater discharge permit shall provide appropriate reports to the director as the director may require, in writing.
(h) Notice of violation/repeat sampling and reporting. If sampling performed by a user indicates a violation, the user must notify the director within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the director within 30 days after becoming aware of the violation. The user is not required to resample if the county monitors at the user's facility at least once a month, or if the county samples between the user's initial sampling and when the user receives the results of this sampling.
(i) Notification of the discharge of hazardous waste.
(1) Any user who commences the discharge of hazardous waste shall notify the POTW, the EPA Regional Waste Management Division Director, and state hazardous waste authorities, in writing, of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR 261. Such notification must include the name of the hazardous waste as set forth in 40 CFR 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the user discharges more than 100 kilograms of such waste per calendar month to the POTW, the notification also shall contain the following information to the extent such information is known and readily available to the user: an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the wastestream discharged during that calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following 12 months. All notifications must take place no later than 180 days after the discharge commences. Any notification under this subsection need be submitted only once for each hazardous waste discharged.
However, notifications of changed conditions must be submitted under subsection (e) of this section. The notification requirement in this section does not apply to pollutants already reported by users subject to categorical pretreatment standards under the self-monitoring requirements of subsections (a), (c) and (d) of this section.
(2) Dischargers are exempt from the requirements of subsection (f)(1) of this section, during a calendar month in which they discharge no more than 15 kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than 15 kilograms of nonacute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification.
Subsequent months during which the user discharges more than such quantities of any hazardous waste do not require additional notification.
(3) In the case of any new regulations under section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the user must notify the director, the EPA Regional Waste Management Waste Division Director, and state-hazardous waste authorities of the discharge of such substance within 90 days of the effective date of such regulations.
(4) In the case of any notification made under this section, the user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical.
(5) This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this article, a permit issued thereunder, or any applicable federal or state law.
(j) Sampling and testing. All sampling and testing performed under this subsection for reporting requirements shall be conducted in accordance with section 66-424.
(k) Written reports. Written reports will be deemed to have been submitted on the date postmarked. For reports which are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern.
Historia
(Ord. of 2-4-2003, § 17)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.