Sec. 58-141. Blasting permits.

Sobre este texto

  • As published by Municode, current through 2025-12-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Air concussion means the amount of atmospheric over pressure which is generated by a blast as measured in decibels as monitored on the peak linear scale (�dbL�) by a mechanism or device which is designed for the purpose of measuring the atmospheric over pressure which is generated from a blast.

Blast means any detonation of explosive materials.

Blasting operation means any person who detonates more than 500 pounds of explosive material at any one blast in the county.

Consultant shall mean a qualified, unbiased third party who is an expert in the field of liability seismology and who has been previously approved, upon request of the blasting operation, by the board of commissioners as a consultant for the blasting operation.

Fly rock means any object or projectile either rock, dirt or any other material which leaves the blasting operation project as a result of the detonation of a blast.

Ground vibration means the level of particle acceleration as measured in inches per second, peak particle velocity at a point on the ground adjacent to the nearest occupied structure which will be most severely impacted by the blast as determined by the consultant.

Monitor means the use of a seismograph by the consultant to measure the ground vibration and air over pressure resulting from a blast.

Monitoring seismograph means a mechanism or device which is capable of measuring particle acceleration as peak particle velocity with air over pressure monitoring capabilities.

At a minimum, the monitoring seismograph should:

(1) Have the ability to measure ground vibration in terms of peak particle velocity at a rate between 0.01 inches per second to 4.0 inches per second;

(2) Have the ability of measuring particle velocity in three mutually perpendicular planes;

(3) Have the ability to measure air over pressure (�air concussion�) with a range of 100 to 150 dbl (peak linear);

(4) Have the ability of self calibration traceable to the Bureau of National Standards;

and

(5) Shall be required to measure and store blast information on magnetic media for future analysis.

Project means the acres or sites wherein a blasting operation proposes to detonate a blast and shall extend to the property lines of the blasting operation or of the owner of the property employing the blasting operation.

Seismograph means the use of a peak particle velocity monitoring seismograph.

(b) Blasting permits. Applications for blasting permits may be obtained in person at the fire department administrative offices or online at the fire department's website. Applications will be reviewed and considered for approval by the fire marshal.

(c) Blasting permit requirements. The following requirements must be presented to the Paulding County Fire Chiefs office:

(1) A certified copy of the State of Georgia Explosive License issued by the state.

(2) A certified copy of liability blasting insurance.

(3) Exact location of blasting activity.

(4) Notification of 911 prior to blasting.

(5) Familiarity with Chapter 120-S-10, Georgia Safety Regulations.

Note: OSHA requires that Title 29 C.F.R; Part 1926 Subpart U, Blasting and use of explosives be compliant with all blasting operations contractors.

(d) Consultant required.

(1) No blasting operation shall detonate a blast of explosive material in the county without first obtaining the services of a consultant who will be required to monitor each blast of a blasting operation with a monitoring seismograph.

(2) No blasting operation shall detonate a blast in the county unless a consultant is present to monitor the blast with a monitoring seismograph.

(e) Seismographic reading restricted. No blasting operation shall detonate a blast which causes a monitoring seismograph being utilized by the consultant to detect a reading greater than 0.25 inches per second peak particle velocity ground vibration.

(f) Air concussion restricted. No blasting operation shall detonate a blast or cause any detonation of explosive materials which causes a monitoring seismograph utilized by the consultant to have an air concussion reading greater than 129 dbl (peak linear).

(g) Fly rock restricted. No blasting operation shall cause a blast or detonation of explosive materials which causes fly rock or any other object to fall beyond the property lines of the project.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. No. 12-31, § 2, 9-25-2012; Ord. No. 19-03, § 9, 7-23-2019)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:paulding-county/code/58-141@2025-12-09-357713a42f

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.