Ir al contenido
Georgia Commons
Menú

Peach County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 26 - ENVIRONMENT / Article V - WATER RESOURCE PROTECTION / Division 1 - IN GENERAL

Sec. 26-130. Groundwater recharge area protection district.

Sobre este texto

  • As published by Municode, current through 2023-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Findings of fact. Recharge areas are vulnerable to urban development activities as well as agricultural activities. Pesticides, herbicides, sprayed on crops, animal waste and septic tank effiuents contribute to a deterioration in the groundwater quality and can threaten the health of residents relying on well water. Development usually means an increase in the amount of land covered with impervious surfaces. Paving land in recharge areas can alter or impair their recharge characteristics thereby decreasing groundwater supplies.

(b) Purpose. The purpose of this district is to establish criteria to protect significant groundwater recharge areas from pollution by spills, discharges, leaks, impoundments, application of chemicals, injections and other development pressures.

(c) District delineation. The Groundwater Recharge Area Protection District is delineated according to the Georgia Department of Natural Resources' "Most Significant Groundwater Recharge Areas of Georgia Hydrologic Atlas 18 (1989 Edition)." Each recharge area shall be determined to have a pollution susceptibility of high, medium, or low based on the "Georgia Pollution Susceptibility Map Atlas 20, 1992 Edition." Said maps are hereby adopted and made a part of this article.

(d) Permitted uses. All uses allowed in the underlying zoning districts are permitted in the Groundwater Recharge Area Protection District. The following are additional requirements for specific uses:

(1) New above-ground chemical or petroleum storage tanks, having a minimum volume of 660 gallons, shall have secondary containment for 110 percent of the volume of such tanks or 110 percent of the volume of the largest tank in a cluster of tanks. Such tanks used for agricultural purposes are exempt provided they comply with all federal requirements.

(2) New agricultural waste impoundment sites shall be lined if they are within:

a. A high pollution susceptibility area;

b. A medium pollution susceptibility area and exceed 15 acre-feet in size; and

c. A low pollution susceptibility area and exceed 50 acre-feet in size.

As a minimum, the liner shall be constructed of compacted clay having a thickness of one-foot and a vertical hydraulic conductivity of less than 5 x 10-7 cm/sec or other criteria established by the National Resource and Conservation Service.

(3) New homes served by septic tank/drain field systems shall be on lots having the following minimum size limitations as identified on Table MT-1 of the Department of Human Resources' Manual for On-Site Sewage Management Systems (hereafter DHR Table MT-1). The minimum set forth in Table MT-1 may be increased further based on consideration of other factors (set forth in Sections A-F) of the DHR Manual. The minimum lot size specified by this section shall not be less than the minimum lot size specified in the Peach County Land Development Resolution, Section 81.1.

a. 150 percent of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a high pollution susceptibility area;

b. 125 percent of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a medium pollution susceptibility area;

c. 110 percent of the subdivision minimum lot size calculated based on application ofDHR Table MT-1 if they are within a low pollution susceptibility area.

(4) New manufactured home parks served by septic tank/drain field systems shall have lots or spaces having the following size limitation as identified on Table MT-2 of the Department of Human Resources' (DHR) Manual for On-Site Sewage Management Systems (hereafter DHR Table MT-2). The minimums set forth in Table MT-2 may be increased further based on consideration of other factors (set forth in Sections A-F) of the DHR Manual. The minimum lot size specified by this section shall not be less than the minimum lot size specified in the Peach County Land Development Resolution, Section 81.1.

a. 150 percent of the subdivision minimum lot or space size calculated based on application of DHR Table MT-2 if they are within a high pollution susceptibility area;

b. 125 percent of the subdivision minimum lot or space size calculated based on application of DHR Table MT-2 if they are within a medium pollution susceptibility area; and § 26-130

C.

110 percent of the subdivision minimum lot size or space size calculated based on application of DHR Table MT-2 if they are within a low pollution susceptibility area.

(5) No construction may proceed on a building or manufactured home to be served by a septic tank unless the Peach County Health Department first approves the proposed septic tank installation as meeting the requirements of the Georgia Department of Human Resources Manual for On-Site Sewage Management (hereinafter DHR Manual and Sections (C) and (D) above.

(6) New facilities which handle hazardous materials, of the types (listed in Section 312 of the Resource Conservation and Recovery Act of 1976, excluding underground storage tanks) and in amounts 10,000 pounds or more on any one day shall perform their operations on impervious surfaces and in conformance with any applicable federal spill prevention requirements and any local fire prevention code requirements.

(7) Permanent storm water infiltration basins shall not be constructed in areas having high pollution susceptibility.

TABLE MT-1

NEW HOMES MINIMUM LOT SIZES, MINIMUM LOT WIDTHS AND MAXIMUM

ALLOWABLE SEWAGE FLOW FOR THE TYPE OF WATER SUPPLY SYSTEM

The minimum lot size specified by this section shall not be less than the minimum lot size specified in the Peach County Land Development Resolution, Section 81.1.

Type of Water Supply System Non-Public* (Individual) Public Minimum Lot Size 43,560 square feet 21,780 square feet Minimum Lot Width 150 feet 100 feet Maximum Sewage Flow 600 gpad** 1,200 gpad

* In this context, "Non-Public" means an individual water supply system or any other water supply system which is not a "public" water supply system.

** Gpad = gallons per acre per day = gal/acre/day.

TABLE MT-2

MANUFACTURED HOME PARKS MINIMUM LOT SIZES, MINIMUM LOT WIDTHS

AND MAXIMUM ALLOWABLE SEWAGE FLOW FOR THE TYPE OF WATER SUPPLY

SYSTEM

The minimum lot size specified by this section shall not be less than the minimum lot size specified in the Peach County Land Development Resolution, Section 81.1.

Type of Water Supply System Non-Public* (Individual) I Public Minimum Lot Size 43,560 square feet I 21,780 square feet Type of Water Supply System Non-Public* (Individual) Public Minimum Lot Width 150 feet 100 feet Maximum Sewage Flow 600 gpad** 1,200 gpad

* In this context, "Non-Public" means an individual water supply system or any other water supply system which is not a "public" water supply system.

** Gpad gallons per acre per day = gal/acre/day.

Notes to tables Section A. The above minimum lot sizes are for the typical size home (3 or 4-bedroom) with basic appurtenances such as: driveway, minimum number of trees and water supply line. If larger homes, swimming pools, tennis courts or outbuildings, etc. are proposed for construction or if trees would interfere with installation of an on-site sewage management system, the Peach County Board of Health will require larger lots to assure usable soil area.

Section B. The Peach County Board of Health may also require larger lot sizes when physical factors indicate the need to do so. These factors include, but are not limited to, the availability of sufficient unobstructed land areas for an approved on-site sewage management system and approved replacement system, slope greater than five percent, percolation rates higher than 45 minutes per inch, need for subsurface drainage or adverse topographic features.

Section C. Lots shall be a minimum width of 100 feet or 150 feet measured within the area where an approved on-site sewage management system and replacement system are to be located when served by a public water supply system or nonpublic water supply system, respectively.

Section D. The following land areas are not considered as a part of a lot when calculating the required minimum lot size: rights-of-way of roads, easements (such as power line or pipe line) that exclude installation of an on-site sewage management system, bodies of water, land within 50 feet of a lake, river, stream, wetland or other bodies of water and similar limiting factors.

Section E. There must be an unobstructed area on each lot for installation of an approved on-site sewage management system and an area equal in size for a conventional system or larger area, as appropriate, for an approved replacement system; this will include sufficient area for necessary site modifications for installation of both the initial system and a replacement system. All pertinent County zoning setbacks and other space requirements must also be met.

Section F. The maximum daily sewage flow for each lot or parcel of land shall not exceed 600 gpad when served by nonpublic or individual water supply system or 1,200 gpad when served by public water supply system. When sewage flows exceed these quantities (600 or 1,200 gpad as indicated) for a given dwelling structure, the minimum lot size or parcel of land shall be increased proportionally. Example:

Assume a public water supply exists (so 1,200 gpad maximum sewage flow allowed per minimum required land area of 21,780 square feet), and there is a proposed sewage flow of 5,000 gpd. To determine the square footage of the lot needed, X, use the following formula:

X = 5,000 gal/day 1,200 gal/acre/day = 4.17 acres = 4.17 acres x 43,560 ft2 /acre = 181,500 ft2 area of land needed.

Likewise, for a nonpublic (individual) water supply, to determine the square footage of the lot needed, Y, for a proposed sewage flow of 5,000 gpd, use the following formula:

y = 5.000 gal/day 600 gal/acre/day = 8.33 acres = 8.33 acres x 43,560 ft2/acre = 363,000 ft 2 area of land needed.

(e) Exemptions. Any lot of record approved prior to the adoption of this article is exempt from the minimum lot size requirements contained in section 26-130(d)(3), (4).

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 1-8-02, § 4)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:peach-county/code/26-130@2023-11-14-953fb281c8

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.