Peach County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 26 - ENVIRONMENT / Article VIII.5 - POST DEVELOPMENT STORMWATER MANAGEMENT
Sec. 26-352. Definitions.
Sobre este texto
- As published by Municode, current through 2023-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
[The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:]
Applicant. A person submitting a post-development stormwater management application and plan for approval.
Agricultural operations. Defined in O.C.G.A. § 1-3-3, �definitions�, to include raising, harvesting or storing of products of the field or orchard; feeding, breeding or managing livestock or poultry; producing or storing feed for use in the production of livestock, including but not limited to cattle, calves, swine, hogs, goats, sheep, and rabbits or for use in the production of poultry, including but not limited to chickens, hens and turkeys; producing plants, trees, fowl, or animals; the production of aqua culture, horticultural, dairy, livestock, poultry, eggs and apiarian products; farm buildings and farm ponds.
Channel. A natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water.
Conservation easement. An agreement between a land owner and the county that permanently protects open space or greenspace on the owner's land by limiting the amount and type of development that can take place.
County. Peach County, Georgia.
Design professional. A professional licensed by the State of Georgia in the field of:
engineering, or land surveying. Design professionals shall practice in a manner that complies with applicable Georgia law governing professional licensure.
Detention. The temporary storage of stormwater runoff in a stormwater management facility for the purpose of controlling the peak discharge.
Detention facility. A detention basin or structure designed for the detention of stormwater runoff and gradual release of stored water at controlled rates.
Developer. A person that undertakes land development activities.
Development. A development project or land development project.
Drainage easement. An easement appurtenant or attached to a tract or parcel of land allowing the owner of adjacent tracts or other personas to discharge stormwater runoff and/or maintain stormwater drainage infrastructure on the tract or parcel of land subject to the drainage easement.
Erosion sedimentation and pollution control plan. A plan that is designed to minimize the accelerated erosion and sediment runoff at a site during land disturbance activities, and control the release of pollutants from the site.
Extended detention. The detention of stormwater runoff for an extended period, typically 24 hours or greater.
Extreme flood protection. Measures taken to prevent adverse impact from large storm events with a return frequency of 100 years or more.
Flooding. A volume of surface water that is too great to be confined within the banks or walls of a pond, conveyance or stream channel and that overflows onto adjacent lands.
Forestry land management practices. Harvesting, planting, or other forest management practices.
Greenspace or open space. Permanently protected areas of the site that are preserved in a natural state.
Hotspot. An area where the use of the land has the potential to generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in urban stormwater runoff. Examples include, but are not limited to gas stations, vehicle service and maintenance areas, industrial facilities such as salvage areas (both permitted and unpermitted under the industrial general permit and others), material storage sites, solid waste transfer facilities, and commercial parking lots with high-intensity use.
Hydrologic soil group (HSG). A natural resource conservation service classification system in which soils are categorized into four runoff potential groups. The groups range from group A soils, with highly permeability and little runoff produced, to group D soils, which have low permeability rates and produce much more runoff.
Impervious cover. A surface composed of any material that significantly impedes or prevents the natural infiltration of water into soil. Impervious surfaces include, but are not limited to, roof tops, buildings, streets and roads, and any concrete, asphalt, or compacted gravel surface.
Industrial stormwater permit. A National Pollutant Discharge Elimination System (NPDES) permit issued to an industry or group of industries which regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies.
Infiltration. The process of stormwater runoff percolating into the subsoil or bedrock.
Jurisdictional wetland. An area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation typically adapted for life in saturated soil conditions, commonly known as hydrophytic vegetation and under the jurisdiction of the U.S. Army Corps of Engineers.
Land development. Any land change, including, but not limited to, clearing, digging, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving, and any other installation of impervious cover.
Land development activities. Those actions or activities which comprise, facilitate or result in land development.
Land development project. A discrete land development undertaking.
Inspection and maintenance agreement. A written agreement providing for the long-term inspection and maintenance of stormwater management facilities and practices on a site or with respect to a land development project, which when properly recorded in the deed records constitutes a restriction on the title to a site or other land involved in a land development project.
New development. Land development activity, structural development, (construction, installation, or expansion of a building or other structure), and/or creation of impervious surfaces on a previously undeveloped site.
Non-point source pollution. A form of water pollution that does not originate from a discrete point such as a sewage treatment plant or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water and groundwater via mechanisms such as precipitation, stormwater runoff, and leaching.
Non-point source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction, development, subsurface disposal and urban runoff sources.
Nonstructural stormwater management practice of nonstructural practice. Any natural or planted vegetation or other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits, and includes, but is not limited to , riparian buffers, open and greenspace areas, overland flow filtration areas, natural depressions, and vegetated channels.
Off-site facility. A stormwater management facility located outside the boundaries of the site.
On-site facility. A stormwater management facility located within the boundaries of the site.
Over bank flood protection. Measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e. flow events that exceed the capacity of the channel and enter the floodplain), and that are intended to protect downstream properties from flooding for the two-year through 25-year frequency storm events.
Owner. The legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site.
Stormwater permit. The permit issued by the county to the applicant which is required for undertaking any land development activity that disturbs one acre or more of land or adds 5,000 square feet or more of impervious area.
Person. Except to the extent exempted from this article, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, town, county or other political subdivision of the state, and interstate body or any other legal entity.
Post-development. The time period, or the conditions that may reasonably be expected or anticipated to exist, after completion of the land development activity on a site as the context may require.
Pre-development. The time period, or the conditions that exist, on a site prior to the commencement of a land development project and at the time that plans for the land development of a site are approved by the plan approving authority. Where phased development or plan approval occurs (preliminary grading, road and utilities, etc.), the existing conditions at the time prior to the first item being approved or permitted shall establish pre-development conditions.
Project. A land development project.
Previously developed site. A site that has been altered by paving, construction and/or land use that would typically have required regulatory permitting to have been initiated (alterations may exist now or in the past).
Redevelopment. Structural development (construction, installation, or expansion of a building or other structure), creation or addition of 5,000 square feet or greater impervious surfaces or the disturbance of one acre or more of land. Redevelopment does not include such activities as exterior remodeling, remodeling of existing buildings, resurfacing of paved areas, and exterior changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional non-point source pollution.
Regional stormwater management facility or regional facility. Stormwater management facilities designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may assist in the financing of the facility, and the requirement for on-site control is either eliminated or reduced.
Runoff. Stormwater runoff.
Site. The parcel of land being developed, or the portion thereof on which the land development project is located
Stormwater better site design practices. Nonstructural site design approaches and techniques that can reduce a site's impact on watersheds and can provide for nonstructural stormwater management. Stormwater better site design includes conserving and protecting natural areas and greenspace, reducing impervious cover and using natural features for stormwater management to reduce the amount of runoff and pollutants that are generated from a site.
Stormwater management. The collection, conveyance, storage, treatment and disposal of stormwater runoff in a manner intended to prevent increased flood damage, stream bank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public health, safety and general welfare.
Stormwater management facility. Any infrastructure that controls or conveys stormwater runoff.
Stormwater management measure. Any stormwater management facility or nonstructural stormwater practice.
Stormwater management plan. A document describing how existing runoff characteristics will be affected by a land development project and containing measures for complying with the provisions of this article.
Stormwater management system. The entire set of structural and nonstructural stormwater management facilities and practices that are used to capture, convey and control the peak flow, quantity and quality of the stormwater runoff from a site.
Stormwater retrofit. A stormwater management practice designed for a currently developed site that previously had either no stormwater management practice in place or a practice inadequate to meet the stormwater management requirements of the site.
Stormwater runoff. The flow of surface water resulting from precipitation.
Structural stormwater control. A structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, at the period of release or the velocity of flow of such runoff.
Subdivision. The division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, or other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway.
Historia
(Ord. of 4-10-2018)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.