Sec. 14-51. Duties and responsibilities of the code inspector.

Sobre este texto

  • As published by Municode, current through 2025-01-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Duties of the code inspector shall include, but not be limited to the following:

(1) Review all development permits to ensure that permit requirements of this article have been satisfied.

(2) Advise permittees that additional federal or state permits may be required, and if specific federal or state permit requirements are known, require that copies of such permits be provided and maintained on file with the development permit.

(3) Notify adjacent communities and the state department of natural resources prior to any alteration of relocation of a watercourse, and submit evidence of such notification to the Federal Emergency Management Agency.

(4) Ensure that maintenance is provided within the altered or relocated portion of such watercourse so that the flood-carrying capacity is not diminished.

(5) Verify and record the actual elevation (in relation to mean sea level) of the lowest floor (including basement) of all new or substantially improved buildings, in accordance with section 14-50(2).

(6) Verify and record the actual elevation (in relation to mean sea level) of the lowest floor (including basement) of all new or substantially improved buildings which have been floodproofed, in accordance with section 14-50(2).

(7) In coastal hazard areas, certification shall be obtained from a registered professional engineer or architect that the building is designed to be securely anchored to adequately anchored pilings or columns in order to withstand velocity waters and hurricane wave wash.

(8) In coastal high hazard areas, the county code inspector shall review plans for adequacy of breakaway walls in accordance with section 14-79.

(9) When floodproofing is utilized for a particular building, the county code inspector shall obtain certification from a registered professional engineer or architect, in accordance with section 14-79(2).

(10) Where interpretation is needed as to the exact location of boundaries of the area of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the county code inspector shall make the necessary interpretation. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article.

(11) When base flood elevation data or floodway data have not been provided in accordance with section 14-25, then the county code inspector shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source, in order to administer the provisions of section 14-78 et seq. All records pertaining to the provisions of this article shall be maintained in the office of the county planning commission.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Code 2005, § 26-63; Ord. of 10-7-1997, art. 4, § C)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:pierce-county/code/14-51@2025-01-07-4ca75bd57b

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Pierce County Code of Ordinances, Sec. 14-51. Duties and responsibilities of the code inspector | Georgia Commons