Sec. 24-70. Permits.

Sobre este texto

  • As published by Municode, current through 2025-01-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) A permit is required to collocate a small wireless facility in the public right-of-way or to install, modify, or replace a pole or a decorative pole in the public right-of-way. A permit is not required to perform the activities described in O.C.G.A § 36-66C-6(e) or (f).

(b) Any person seeking to collocate a small wireless facility in the public right-of-way, or to install, modify, or replace a pole or a decorative pole in the public right of was shall submit an application to the Pierce County Planning and Codes Department for a permit. Applications are available from the Pierce County Planning and Codes Department. Any material change to information contained in an application shall be submitted in writing to the Pierce County Planning and Codes Department within 30 days after the events necessitating the change.

(c) Any person who intends to submit an application to the county pursuant to this article shall meet with the Pierce County Planning and Codes Department at least 30 days prior to submitting an application for a permit. The purpose of such meeting shall be to inform the County, in good faith, when the applicant expects to commence deployment of small wireless facilities and poles within the county, the number of small cell wireless facilities and poles it expects to deploy during the twenty-four (24) months after commencement, and the expected timing of such deployments.

(d) Each application shall be submitted by the applicable wireless provider or its duly authorized representative and shall contain the following:

(1) The applicant's name, address, telephone number, and email address, including emergency contact information for the applicant;

(2) The names, addresses, telephone numbers, and email addresses of all consultants, if any, acting on behalf of the applicant with respect to filing the application;

(3) A general description of the proposed work and the purposes and intent of the proposed facility. The scope and detail of such description shall be appropriate to the nature and character of the physical work to be performed, with special emphasis on those matters likely to be affected or impacted by the physical work proposed;

(4) Detailed construction drawings regarding the proposed use of the right-of-way;

(5) To the extent the proposed facility involves collocation on a pole or support structure, a structural report performed by a duly licensed engineer evidencing that the pole or support structure will structurally support the collocation (or that the pole or support structure may and will be modified to meet structural requirements) in accordance with applicable codes;

(6) For any new aboveground facilities, visual depictions or representations if not included in the construction drawings;

(7) Information indicating the horizontal and approximate vertical location, relative to the boundaries of the right-of-way, of the small wireless facility for which the application is being submitted;

(8) If the application is for the installation of a pole, a certification that complies with O.C.G.A. § 36-66C-6(k);

(9) If the small wireless facility will be collocated on a pole or support structure owned by a third party, a certification that the wireless provider has permission from the owner to collocate on the pole or support structure; and

(10) If the applicant is not a wireless services provider, a certification that a wireless services provider has requested in writing that the applicant collocate the small wireless facilities or install, modify, or replace the pole or decorative pole at the requested location.

(e) Each application for a permit shall include the maximum application fees permitted under O.C.G.A. § 36-66C-5(a)(1), (a)(2) and (a)(3). Such maximum application fees shall automatically increase on January 1st of each year beginning January 1, 2021, as provided under O.C.G.A. § 36-66C-5(b).

(f) The Pierce County Planning and Codes Department shall review applications for permits according to the timelines and using the procedures identified in O.C.G.A. § 36-66C-7 and 36-66C-13.

(g) Applications for permits shall be approved unless the requested collocation of a small wireless facility or the requested installation, modification, or replacement of a pole or decorative pole:

(1) Interferes with the operation of traffic control equipment;

(2) Interferes with sight lines or clear zones for transportation or pedestrians;

(3) Fails to comply with the Americans with Disabilities Act. 42 U.S.C. Section 12101, et seq., or similar laws of general applicability regarding pedestrian access or movement;

(4) Requests that ground-mounted small wireless facility equipment be located more than seven and one-half feet in radial circumference from the base of the pole, decorative pole or support structure to which the small wireless facility antenna would be attached, provided that the county shall not deny the application if a greater distance from the base of the pole, decorative pole or support structure is necessary to avoid interfering with sight lines or clear zones for transportation or pedestrians or to otherwise protect public safety;

(5) Fails to comply with applicable codes;

(6) Fails to comply with the maximum limitations set forth in section 24-72 of this article or O.C.G.A. § 36-66C-7(h) or (i);

(7) With respect to an application to install a pole or decorative pole, interferes with the widening, repair, reconstruction, or relocation of a public road or highway by a county or department of transportation that has been advertised for bid and scheduled for completion within six months after the application is filed;

(8) With respect to an application to install a pole or decorative pole, interferes with a public works construction project governed by Chapter 91 of Title 36 which is advertised for bid and scheduled for completion within six months after the application is filed;

(9) Fails to comply with O.C.G.A. § 36-66C-10, O.C.G.A. § 36-66C-11, or O.C.G.A.

§ 36-66C-12;

(10) Fails to comply with laws of general applicability addressing pedestrian and vehicular traffic and safety requirements; or

(11) Fails to comply with laws of general applicability that address the occupancy or management of the right-of-way and that are not otherwise inconsistent with this article.

(h) For applications for new poles in the public right-of-way in areas zoned for residential use, the Pierce County Planning and Codes Department may propose an alternate location in the public right-of-way within 100 feet of the location set forth in the application, and the wireless provider shall use the Pierce County Planning and Codes Department's proposed alternate location unless the location imposes technical limits or significant additional costs.

The wireless provider shall certify that it has made such a determination in good faith, based on the assessment of a licensed engineer, and it shall provide a written summary of the basis for such determination.

(i) A permit issued under this section 24-70 shall authorize such person to occupy the public rights-of-way to: (i) collocate a small wireless facility on or adjacent to a pole or a support structure that does not exceed the limitations set forth in O.C.G.A. § 36-66C-7(h)(3) or on or adjacent to a decorative pole in compliance with O.C.G.A. § 36-66C-12; and (ii) install, modify, or replace a pole or decorative pole for collocation of a small cell wireless facility that does not exceed the limitations set for in O.C.G.A. § 36-66C-7(h)(1) and (h)(2).

(j) Upon the issuance of a permit under this article, and on each anniversary of such issuance, every person issued a permit shall submit to the County the maximum annual payments permitted under O.C.G.A. § 36-66C-5(a)(4) and (a)(5); provided however, that if such person removes its small wireless facilities from the public rights-of-way pursuant to O.C.G.A.

§ 36-66C-5(e). then such person shall be responsible for the pro rata portion of the annual payment based on the number of days of occupation since the last annual payment. Upon making such pro rata payment and removal of the small wireless facilities, the person's annual payment obligations under this section shall cease as of the date of the actual removal. The maximum annual payments shall automatically increase on January 1 of each year beginning January 1, 2021, as provided under O.C.G.A. § 36-66C-5(b).

(k) Any person issued a permit shall pay the fees identified in O.C.G.A. § 36-66C-5(a)(6) and (a)(7), as applicable.

(l) The county may revoke a permit issued pursuant to the section 24-70 if the wireless provider or its equipment placed in the public right-of-way under that permit subsequently is not in compliance with any provision of this article or the Georgia Streamlining Wireless Facilities and Antennas Act. Upon revocation, the county may proceed according to subsection 24-70(m).

(m) If a wireless provider occupies the public rights-of-way without obtaining a permit required by this section 24-70 or without complying with the SWFAA, then the county may, at the sole discretion of the county, restore the right-of-way, to the extent practicable in the reasonable judgement of the county, to its condition prior to the unpermitted collocation or installation and to charge the responsible wireless provider the reasonable, documented cost if the county in doing so, plus a penalty not to exceed $1,000.00. The county may suspend the ability of the wireless provider to receive any new permits from the county under this section 24-70 until the wireless provider has paid the amount assessed for such restoration costs and the penalty assessed, if any; provided, however, that the county may not suspend such ability of any applicant that has deposited the amount in controversy in escrow pending an adjudication of the merits of the dispute by a court of competent jurisdiction.

(n) All accepted applications for permits shall be publicly available subject to the limitations identified in O.C.G.A. § 36-66C-6(c).

(o) An applicant may file a consolidated application related to multiple small wireless facilities, poles or decorative poles so long as such consolidated application meets the requirements of O.C.G.A.§ 36-66C-13.

(p) Activities authorized under a permit shall be completed within the timelines provided in O.C.G.A. § 36-66C-7(k)(2).

(q) Issuance of a permit authorized the applicant to: (i) undertake the collocation, installation, modification, or replacement approved by the permit and (ii) operate and maintain the small wireless facilities and any associated pole covered by the permit for a period of ten years.

(r) Permits shall be renewed following the expiration of the term identified in subsection 24-70(q) upon the terms and conditions identified in O.C.G.A. § 36-66C-7(k)(2)(B).

(s) If an application for a permit seeks to collocate small wireless facilities on authority poles in the public rights-of-way, then the County shall, within 60-days of receipt of the completed application: (i) provide a good faith estimate for any make-ready work necessary to enable the authority pole to support the proposed facility; or (ii) notify the wireless provider that the wireless provider will be required to perform the make-ready work. Any make-ready work performed by the County shall be completed pursuant to and in accordance with the provisions of O.C.G.A. § 36-66C-7(n).

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 19-09, art. III(3.1—3.19), 8-29-2019)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:pierce-county/code/24-70@2025-01-07-a1541d5569

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Pierce County Code of Ordinances, Sec. 24-70. Permits | Georgia Commons