Pulaski County · Código de ordenanzas
Appendix A - SUBDIVISION ORDINANCE / Chapter 4 - PROCEDURES FOR SUBMISSION AND SPECIFICATIONS FOR FINAL PLANS AND PLATS
Section 4.0. Final Plat.
Sobre este texto
- As published by Municode, current through 2023-06-05
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The final plat shall conform to the preliminary plat, as approved by the Enforcement Officer, except where special conditions make compliance to the preliminary plat impractical, and if desired by the subdivider, it may constitute only that portion of the approved preliminary plat which he proposes to record and develop at that time, provided, however, that such portion conforms to all requirements of these regulations and to approved phasing lines shown on the preliminary plat.
If the proposed water or sewerage system for a subdivision requires the approval of the Georgia Department of Public Health and/or the Georgia Water Quality Control Board, Georgia Environmental Protection Division or other government agency, this approval shall be obtained prior to making application to the Enforcement Officer for approval of the final plat. This approval shall be in writing and shall accompany the application for approval to the Enforcement Officer.
Unless a final plat is filed with the Enforcement Officer within twelve (12) months after approval of the preliminary plat or within an approved extension of time not to exceed twelve (12) additional months, the preliminary plat shall thereupon become void and the subdivider shall be notified in writing. Not less than six (6) copies of the final plat shall be submitted to the Enforcement Officer.
The final plat, if found to be in conformity with the requirements of law and of these regulations, shall be approved by the Enforcement Officer and other appropriate government entities within a reasonable period of time, not to exceed thirty (30) days, following the submission of such plat. If the subdivider desires to submit a final plat that does not conform to the preliminary plat, the Enforcement Officer shall have the Sole Pulaski County Commissioner review the final plat request.
An approved final plat shall be filed for recording with the office of the Clerk of Superior Court within sixty (60) days after final approval thereof. Otherwise, such approval shall be withdrawn and the plat marked void and returned to the owner. No Clerk of the Superior Court shall file or record a plat of a subdivision until such plat has been approved by the Enforcement Officer or Sole Commissioner of Pulaski County in accordance with these regulations.
The recording of plats of subdivision of land may operate to transfer, in fee simple, to Pulaski County those portions of such plat set apart for streets, alleys, wells, well lots, rights-of-way, or other public uses or for future street widening. This recording may also operate to transfer to Pulaski County, any easement indicated on such plat to create a public right of passage over the same. The approval of a plat by Pulaski County shall not be deemed to constitute or affect acceptance by Pulaski County of any street or other ground shown on the plan.
If subdivision construction plans are required, the subdivider shall provide one of the following relative to the installation of required improvements (streets, utilities, drainage, etc.):
1. A report prepared by an engineer or land surveyor registered in the State of Georgia, certifying that all improvements meet the requirements of these regulations shall include the following:
a. A copy of any inspection/observation reports performed by the design professional of record or designated representative.
b. A copy of any material testing/inspection reports performed by the design professional of record or designated representative.
c. A summary of all design and field changes made to the approved construction plans.
d. Two (2) sets of plans reflecting the "as-built" condition of all improvements and easements.
e. A copy of all approvals required in Chapter 3 of this Ordinance or statement of "not applicable".
f. As-built or planned location of water, gas, electric, telephone, and cable utilities including appurtenances (transformers, pedestals, poles, etc.).
g. Summary of actual (or estimated if security bonded) construction costs by item utilized as the basis for the computation of maintenance and other bonds.
h. Certification by a surveyor registered in the State of Georgia that all lot corner pins have been set, marked, and verified.
i. Certification that the storm water management and drainage systems are in substantial conformance with the approved construction plans.
j. Signed and sealed "Design and Construction" certification by the design professional of record as contained in Chapter 5 of this Ordinance.
k. The Pulaski County Health Department status of each lot as defined by the Health Department in regards to on-site sewage disposal usage when public sewer is not available, with County Health Department approved legend and footnotes as needed to explain applicability and usage of on-site sewage disposal systems.
2. A security bond from a surety bonding company authorized to do business in the State of Georgia. The bond shall be payable to Pulaski County and shall be equal to one hundred fifty percent (150%) of the cost of providing the specified improvements as estimated by the subdivider and approved by the Sole Commissioner or authorized representative, of installing all required improvements. The duration of the bond shall be for at least one (1) year.
3. A deposit of cash, or other instrument readily convertible into cash at a face value, either with Pulaski County or in escrow with a bank. The amount of the deposit shall be equal to one hundred fifty percent (150%) of the cost of providing the specified improvements as estimated by the subdivider and approved by the Sole Commissioner or authorized representative, of installing all required improvements.
That in the case of failure on the part of the subdivider to complete the specified improvements within the required time period, the bank or lending institution shall pay to Pulaski County immediately, and without further action, such funds as necessary to finance the completion of those improvements, up to the limit of the deposit of cash.
If bonds or cash deposits are provided, then the engineer's report required in subsection 1. above shall be provided prior to the release of the bonds or cash deposits.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.