Ir al contenido
Georgia Commons
Menú

Pulaski County · Código de ordenanzas

Appendix A - SUBDIVISION ORDINANCE / Chapter 5 - CONFORMANCE WITH COMPREHENSIVE PLAN, IMPROVEMENTS REQUIRED, DESIGN AND CONSTRUCTION STANDARDS FOR ALL SUBDIVISIONS / 5.0 - Conformance With Comprehensive Plan and Other Regulations.

Section 5.3.15. Sidewalks and Street Signs.

Sobre este texto

  • As published by Municode, current through 2023-06-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

If the installation of sidewalks within the public right-of-way is desired, the subdivider shall submit a sidewalk plan with the construction plans for the development. At the time of construction of the individual home, apartment building, commercial, or other use, sidewalks shall be installed on both sides of the street, on an individual lot basis. The developer shall install all handicap ramps and transitions as required by the County for Americans with Disabilities Act compliance at the time of development construction. The Enforcement Officer shall inspect the location and construction of the sidewalk and shall not issue a Certificate of Occupancy until the required sidewalk is properly installed.

Sidewalks shall be four inches (4") thick, with a minimum width of five feet (5') on major collector streets and higher classifications and four feet (4') on all other streets. A grass planting strip with a minimum width of three feet (3') shall be provided between the back of curb and the sidewalk, with a ten-foot (10') wide planting strip required for major collector and arterial streets. All sidewalks shall be sloped at the rate of one-fourth inch (0.25") per foot toward the street, unless otherwise approved.

The right-of-way width shall be increased by ten feet (10') if sidewalks are located within the right-of-way, with five feet (5') being added to each side of the right-of-way within the storm sewer corridor. Sidewalks shall be placed within this expanded storm sewer corridor, but shall generally not be located on top of the storm sewer or any other utility. Otherwise, sidewalks may be located outside of the right-of-way within cross easements located on the fronts of adjacent lots. The party responsible for street maintenance shall also be responsible for all sidewalks located within these easements.

All streets shall be designated by name on a metal street signpost, with such metal post having nameplates of metal set one above the other with a clearance of seven feet (7'). The post shall be so located as to be visible for both pedestrians and vehicular traffic. At cross-street intersections, two (2) signposts shall be located diagonally across the intersection from each other. Only one (1) street signpost shall be required at T-street intersections. All signs shall conform to the guidelines contained in the Manual on Uniform Traffic Control Devices. The developer shall be responsible for all costs associated with the installation of street signs. Plans shall show all street signs, speed limit signs, traffic control signs and devices, and pavement markings.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:pulaski-county/code/5.3.15@2023-06-05-8e5bf12bbd

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Pulaski County Code of Ordinances, Section 5.3.15. Sidewalks and Street Signs | Georgia Commons