Ir al contenido
Georgia Commons
Menú

Pulaski County · Código de ordenanzas

Part II - THE CODE / Chapter 58 - ROADS AND BRIDGES / Article III - MINIMUM STANDARDS FOR ACCEPTANCE OF STREETS AND ROADS

Sec. 58-85. Easements and installation of utilities.

Sobre este texto

  • As published by Municode, current through 2023-06-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Streets and roadways sought to be conveyed to the county under the provisions of this article shall not contain within their right-of-way easements for public utilities; and any installation of public utilities shall be paid in advance of the paving of such streets or roadways; and, in circumstances wherein pavement breaks are required for utility connections or extensions, such breaks shall be repaved by such utility company at its sole expense and in compliance with the rules and regulations established for paving.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 2-2-1987, § V)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:pulaski-county/code/58-85@2023-06-05-708c9c9b5b

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.