Ir al contenido
Georgia Commons
Menú

Putnam County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 46 - ROADS, BRIDGES AND OTHER PUBLIC PROPERTY / Article III - TIMBER HARVESTING / Division 3 - NOTICE

Sec. 46-109. Inspection.

Sobre este texto

  • As published by Municode, current through 2026-02-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) An appointment for ingress/egress inspection shall be scheduled 24 hours in advance of the commencement of activity with the public works department to allow the public works director or his designated agent to inspect the site prior to any activity at the proposed ingress/egress location.

(b) The following minimum standards shall be met unless directed otherwise by the public works director or his designated agent:

(1) When applicable a culvert is required along the right-of-way and the size and length of the culvert. If a culvert is required, it shall be installed as directed by the public works representative and at the expense of the business entity that paid the road access fee. Unless waived by the designee, access onto public roads shall have stone pads. The applicant shall be responsible for a stone pad at the access point to stop any dirt and mud from adhering to county roads. Any dirt brought onto county roads shall be removed immediately so as not to destroy improved surfaces or endanger passing vehicles.

(2) Use geotextile underliner minimum 20 feet wide under gravel pad.

(3) Minimum drive width shall be 20 feet.

(4) Minimum thickness of six inches constructed of one and one-half inches to three and one-half inches of coarse aggregate for a minimum drive length of 50 feet.

(5) The street or road, at each ingress/egress point, shall be posted with four 48-inch orange Trucks Entering Highway advance warning signs placed on the shoulder of the road at 500 feet and 1,000 feet intervals from both directions. Signs and posts shall conform to the current edition of the Manual for Uniform Traffic Control Devices.

(c) At completion of harvest, contractors must restore the ditch line, back slopes and road shoulders to their original condition or better. Further, such persons shall give notice of cessation of cutting within 24 hours after the job is completed. The site will be inspected by the designee within 48 hours. If at this time, access sites are not in proper repair, operators will make the required repairs at his expense. Operators shall remove temporary culverts they installed by completion of the project.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 5-19-2020(1))

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:putnam-county/code/46-109@2026-02-17-625e5b2879

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Putnam County Code of Ordinances, Sec. 46-109. Inspection | Georgia Commons