Sec. 310-35. Exemptions from stormwater management standards.

Sobre este texto

  • As published by Municode, current through 2026-01-27
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

This article does not apply to the following activities:

(a) Land disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an emergency need to protect life, limb, or property or

conduct emergency repairs;

(b) Land disturbing activity that consists solely of cutting a trench for utility work and related pavement replacement;

(c) Land disturbing activity conducted by local, state, authority, or federal agencies, whose sole purpose is to implement stormwater management or

environmental restoration;

(d) Repairs to any stormwater management system deemed necessary by the stormwater director;

(e) Agricultural practices as described O.C.G.A. § 12-7-17(5) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the thresholds in section 310- 34(a) or section 310-34(b);

(f) Silvicultural land management activities as described O.C.G.A. § 12-7-17(6) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the thresholds in section 310-34(a) or section 310-34(b);

(g) Installations or modifications to existing structures solely to implement Americans with Disabilities Act (ADA) requirements, including but not limited to elevator shafts, handicapped access ramps and parking, and enlarged entrances or

exits; and

(h) Linear transportation projects being constructed by Rockdale County, other local governments, or State agencies to the extent the stormwater director determines that the stormwater management standards may be infeasible to apply, all or in part, for any portion of the

linear transportation project. For this exemption to apply, an infeasibility report that is compliant with Rockdale County's linear feasibility program shall first be submitted to the stormwater director that contains adequate documentation to support the evaluation for the applicable portion(s) and any resulting infeasibility

determination, if any, by the stormwater director.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 0-2020-17, § 2, 11-10-2020)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:rockdale-county/code/310-35@2026-01-27-d17934720a

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Rockdale County Code of Ordinances, Sec. 310-35. Exemptions from stormwater management standards | Georgia Commons