Rockdale County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 90 - TELECOMMUNICATIONS / Article II - COMMUNITY ANTENNA TELEVISION SYSTEMS
Sec. 90-41. Initial system installation schedule.
Sobre este texto
- As published by Municode, current through 2026-01-27
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Within 30 days after the acceptance of the franchise, a grantee shall proceed with due diligence to obtain all necessary permits and authorizations which are required in the conduct of its business, including but not limited to any utility
joint use attachment agreements, microwave carrier licenses and any other permits, licenses and authorizations to be granted by duly constituted
regulatory agencies having jurisdiction over the operation of CATV systems or their associated microwave transmission facilities.
(b) The grantee shall, within one year from the date a franchise is granted governing cable television operations in and for the area of the county designated by the county, extend energized trunk
cable to 20 percent of its designated area and shall extend energized trunk cable to the remaining portions of its designated area within four years thereafter unless additional time is granted
by the board upon request by grantee for good cause shown which shall mean not less than service along all county paved roads within the franchise area that meet the required homes per mile standard set forth in section 90-42.
Historia
(Code 1978, § 7-3011)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.