Sec. 98-8. Expansion, design, construction and acceptance of water and wastewater connections and facilities.

Sobre este texto

  • As published by Municode, current through 2026-01-27
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Property owner(s) or developer(s) of existing or proposed private structure(s), land disturbance or other development (development) may apply for connection to or expansion of the county wastewater system only if each of

the following preliminary requirements are met:

(1) Wastewater system availability exists within the county's wastewater treatment plant system designated to receive new flow from the proposed project;

(2) No portion of the subject property is located within the areas designated to be served by septic systems only as set forth in the current Rockdale County Water and Wastewater Master Plan, and the request would not otherwise conflict with said plan; and

(3) All of the requirements of Article III - Wastewater System are met.

(b) Authorization, design and construction of all water and wastewater facilities shall be subject to each of the following conditions:

(1) Design and construction of all water and wastewater facilities shall conform to the latest edition of the Rockdale County Water and Wastewater Standards and Specifications, as adopted from time to time by the board of commissioners.

(2) No connection to, expansion, or improvement of the county water or wastewater conveyance systems by private persons

shall be authorized or initiated without prior written approval from the director, which approval shall be consistent with all of the provisions of section 98-8.

(3) The owner or developer shall pay the entire cost of connection to the water and wastewater conveyance system. All materials, labor, and required land interest or easements for all water and wastewater facilities shall be furnished,

acquired and paid for by the owner or developer.

(4) The owner or developer shall execute a dedication agreement in a form acceptable to the director before initiating any construction of water or wastewater facilities. The dedication agreement shall clearly specify the terms and conditions

under which water and wastewater facilities are to become property of the county.

(5) The owner or developer shall pay all required connection, inspection and associated fees before connecting to water or wastewater facilities.

(6) Rockdale Water Resources shall review and approve all plans and inspect all work for conformance to the latest edition of the Rockdale County Water and Wastewater Standards and Specifica-

tions and perform a final inspection before acceptance. All required inspections must be passed.

(7) Installation of water and wastewater facilities shall be performed by a certified utility contractor licensed by the State of Georgia.

(8) Water and wastewater facilities to be dedicated to the county shall become the property of the county upon completion and final acceptance of such facilities.

Final acceptance of such facilities shall be issued in writing only.

(9) The owner or developer shall furnish as-built records of all water and wastewater facilities constructed.

Specifications for such records shall be as described in the latest edition of the Rockdale County Water and Wastewater Standards and Specifications.

(10) The owner or developer shall warrant all water and wastewater facilities constructed for a period of two years. A bond shall be provided in the amount described in the latest edition of the Rockdale County Water and Wastewater Standards and Specifications. The warranty period shall begin on the date of written final acceptance of the work.

(c) The county shall not accept any water or wastewater facilities, or issue a final plat for subdivision, or issue a certificate of occupancy for any new structure, unless the provisions of this section 98-8 have been satisfied, or waived upon good cause shown by the board of commissioners.

(d) The county may extend, connect to or modify any water line or wastewater line dedicated to the county without compensation to those responsible for original construction of the line.

(Ord. No. 2007-07, § 1, 3-27-2007; Ord. No.

0-2008-04, § 1, 2-12-2008; Ord. No. 2017-07, § 1, 5-23-2017)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:rockdale-county/code/98-8@2026-01-27-f3df371daa

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Rockdale County Code of Ordinances, Sec. 98-8. Expansion, design, construction and acceptance of water and wastewater connections and facilities | Georgia Commons