Schley County · Código de ordenanzas
Part - CODE OF ORDINANCES / Chapter 22 - WATER / Article VII - RURAL DISTRICT (R)
1.2. Be placed on a permanent masonry foundation or other substantial foundation
Sobre este texto
- As published by Municode, current through 2021-09-21
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
that will comply with the Georgia Minimum Building Code for the erection and support of modular homes, stick-built/site-built and to be substantially fixed to its site also in compliance with the Georgia Minimum Building Code;
1.3 Be connected to a water system approved by either the Health Department, or the Georgia Department of Natural Resources Environmental Protection Division,
as the case may be, and resent to the County Inspector a letter or certification of such approval;
1.4 Be connected to an approved wastewater disposal system approved by either the Health Department or the Georgia Department of Natural Resources Environmental Protection Division, appropriate, and present the approval/letter of certification to the County Inspector;
1.5 Have all electrical supply systems and connections that comply with the current Georgia State Minimum Electric Code;
1.6 Be landscaped with trees, shrubs, and other plan material substantially equal to or better than one-family dwellings within 500 feet;
1.7 Have a maintained area around the structure that will be not less than 40 feet extending from the base of the structure;
1.8 Meet the General construction and safety standards of the latest edition of the Georgia State Minimum Building Codes;
1.9 Any open area or "crawl space" beneath the floor level of the residence shall be enclosed by permanent underpinning or skirting. This material shall be solidfaced around the full perimeter with the exception of only enough open area near the floor level to enable appropriate cross-ventilation beneath the residence.
Skirting material shall be approved by the building official and installed only after building inspection and issuance of a Certificate of Occupancy. Skirting shall be installed within 30 days of issuance of the certificate;
1.10 All electrical, plumbing, and heating and air connections, improvements and repairs shall be made by an individual bearing the appropriate license for work performed issued by the State of Georgia.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.