Screven County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 62 - SOLID WASTE / Article IV - WATER SUPPLY WELL PROTECTION
Sec. 62-102. Prohibition.
Sobre este texto
- As published by Municode, current through 2021-06-08
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
In order to ensure the protection of the public with regard to its access to and use of potable water from water supply wells in the area of the Screven County Rocky Ford Road Municipal Solid Waste Landfill (DNR Permit No. 124-003D(SL)), (herein the "landfill") the construction of water supply wells for the provision of potable water within 500 feet of the boundary of the landfill is prohibited. The landfill boundary is delineated on a plat of the same prepared by Warren E. Poythress, Georgia registered land surveyor, No. 1953, dated November 18, 1994, and recorded in the office of the clerk of superior court of Screven County, Georgia, in Plat Book 32, Page 167.
Historia
(Ord. of 8-26-2003, § 2)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.