Ir al contenido
Georgia Commons
Menú

Stephens County · Código de ordenanzas

Part - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article III - PERMITS

Sec. 18-75. Application for camper permit.

Sobre este texto

  • As published by Municode, current through 2026-09-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Temporary dwelling. A permit for 60 consecutive days of occupancy may be obtained to allow a temporary dwelling in a travel trailer for a fee determined by the board of commissioners. Upon expiration, and if an individual still resides in the originally permitted camper, a citation may be issued under this code section.

The 60-day permit occupancy for travel trailers does not apply to travel trailers located in a travel trailer park that meets all requirements of Chapter 59, Article XI ("Recreational Park District") as subsequently amended. All travel trailers must display a current state license before movement. Manufactured home location permits will not be issued for travel trailers.

Applicants for this type of permit must have an approved plan for electrical hookup, access to water, and disposal of wastewater, grey water, and solid waste, to be approved through coordination of the Building Official and County Marshal's Office.

(b) Residential building. A permit may be obtained at the time or after a residential building permit is issued to allow for a temporary dwelling during construction for a fee determined by the board of commissioners. The camper permit shall expire upon the expiration of the residential building permit, one year from the date of issuance, or upon issuance of the certificate of occupancy. Applicants for this type of permit must be fully connected to water, electrical, and wastewater or septic, to be approved through coordination of the Building Official and County Marshal's Office, before approval of a permit for temporary occupancy may be issued.

(c) Manufactured home. A permit may be obtained at the time or after a manufactured home permit is issued to allow for a temporary dwelling during construction for a fee determined by the board of commissioners. The camper permit shall expire upon the expiration of the manufactured home permit, six months from the date of issuance, or upon issuance of the certificate of occupancy. Applicants for this type of permit must be fully connected to water, electrical, and wastewater or septic, to be approved through coordination of the Building Official and County Marshal's Office, before approval of a permit for temporary occupancy may be issued.

Each of the aforementioned permit types is parcel and camper specific. The parcel number that the camper will be located on and the VIN of the travel trailer (verified by code enforcement) shall be included on the permit. Each permit shall not be renewed except through a variance granted directly by the Stephens County Board of Commissioners, at which time there must be progress made on the construction of a residential structure or placement of a manufactured home, typically shown through successful completion of an inspection and to be determined through coordination of the building official and the board of commissioners. A renewal fee for these permits shall be issued at the time a variance is granted.

(d) Vacation permit. A permit may be obtained on a temporary basis to utilize one's own property for the temporary placement of a camper for a term not to exceed seven consecutive calendar days. This type of permit shall be allowed to be pulled only between the dates of May 1st through September 30th, with the express purpose being the utilization of one's own property for recreational and holiday use. Should the permittee exceed seven consecutive calendar days, an additional permit must be pulled. Only six vacation permits may be pulled for a specific camper and parcel between the dates of May 1st and September 30th within a calendar year without a variance.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 09-23-2025(3))

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:stephens-county/code/18-75@2026-09-08-0d128cc43d

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Stephens County Code of Ordinances, Sec. 18-75. Application for camper permit | Georgia Commons