Sec. 70-34. Installation of utilities on county's right-of-way.

Sobre este texto

  • As published by Municode, current through 2026-03-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) General provisions.

(1) Application for permit. Prior to beginning construction activity for the installation, construction, maintenance, removal, or relocation of utilities in, on, along, over, or under the public roads of the county which are a part of the county's road system lying outside the corporate

limits of any municipalities, any public or private utility company, person, or

entity desiring to engage in such activity shall first submit a written application for a utility right-of-way permit to the public works department. The application shall contain the nature, extent, and location of the portion of the utilities, roads, and rights-of-way affected thereby and any other information required by

the public works department. An application fee of $200.00 per physical location and proof of an indemnity bond in compliance with subsection (e) of this section shall be attached to the application and shall be a prerequisite for approval of the application. A detailed drawing showing

the exact location of the work to be performed shall be attached to the application. Upon request, the permittee shall also make all project drawings available to the public works department free of

charge and at no expense to the county.

Any proposed changes to the original or an amended application shall be submitted in writing to the public works department for its advance approval. The public works department retains the right to

reject any application not in compliance with the Code of Ordinances of Sumter

County or any applicable state or federal laws or as otherwise authorized by law.

(2) Notice. If an application is approved by the public works department and a permit issued, the permittee shall provide the

public works department 48 hours' prior written notice before engaging in any actual construction activity. Written notice may be provided by U.S. mail, hand

delivery, or email.

(3) Location of utilities. It shall be the sole responsibility of the permittee to

determine the location of any existing utilities in the area in which the permittee will be working.

(4) General specifications.

a. All utilities installed pursuant to this section shall be placed in a conduit pipe and installed by road cutting, jacking, or boring. An open cut will not be permitted when, in the discretion of the public works director, it is reasonably practical to bore or tunnel under the roadway or to use another alternate method to avoid cutting the roadway.

b. Regardless of the type of installation, all conduits shall be 25 percent greater in diameter than the pipe or

utility that will be placed within the conduit pipe. The length of the conduit pipe must be sufficiently adequate to span the entire width of the right-of-way. The grade for the top of the conduit pipe must be at a depth of not less than two feet below the lowest ditch grade.

c. Cuts on the shoulder of the road shall be filled, refilled, and maintained at the permittee's expense to the reasonable satisfaction of the public works department.

(5) Standards for installation. All installations of utilities and conduit pipes shall comply with all applicable federal, state, and local soil and erosion requirements.

In addition, the public works department may require compliance with any or all of the utility accommodation standards and

specifications, the manual on traffic control procedures for utilities, and any other regulations adopted by the Georgia Department of Transportation regarding

utilities on the state highway system pursuant to O.C.G.A. § 32-6-174, as amended from time to time.

(b) Open cutting details. All open cutting of the road shall comply with the following:

(1) Metal plates shall be placed over any cut in the pavement to provide for the continuous flow of traffic until the pavement is repaired.

(2) All paving repairs shall be conducted in compliance with the Georgia Department of Transportation standards required for Class A Pavement Replacement.

(3) With the exception of Crisp County, Georgia, and any public utility companies, the permittee shall hire an independent, qualified expert to test the compaction of the repair and shall furnish the name

and address of such expert to the public works department, along with a complete

copy of the expert's reports and findings.

(c) Jacking details. All jacking details shall comply with the following:

(1) Suitable pits or trenches shall be excavated for the jacking operation as needed. Such pits or trenches shall be securely sheeted and braced when necessary to prevent caving.

(2) When a conduit pipe is installed under a roadway by jacking, construction shall be performed in a manner that does not

interfere with the operation of the roadway and does not weaken the roadbed or

roadbed structures.

(3) Jacks for forcing the conduit pipe through the roadbed shall have a jacking head

constructed in a manner that applies uniform pressure around the ring of the pipe during the jacking operation. When jacking a conduit pipe, the conduit pipe shall be set on guides and braced together so as to properly support and direct the section of the pipe to the proper line and grade.

(4) The diameter of the excavation shall conform to the outside diameter and

circumference of the conduit pipe as closely as possible. Any voids that develop during the jacking operation that are determined by the Public Works Department to be

detrimental to the work shall be pressure grouted with a mixture approved by the public works Department.

(5) The line and grade must be preapproved by the public works department.

(d) Boring details. All boring details shall comply with the following:

(1) Boring shall proceed from a pit provided for the boring equipment and workmen.

The holes shall be bored mechanically.

(2) The use of water or other fluids in connection with the boring operation shall be permitted only to the extent necessary to lubricate cuttings. Jetting or jetting operations shall not be permitted.

(3) The diameter of the excavation shall conform to the outside diameter and

circumference of the conduit pipe as closely as possible. Any voids that develop during the boring operation that are determined by the public works department to be

detrimental to the work shall be pressure grouted with a mixture approved by the public works department.

(4) The line and grade must be preapproved by the public works department.

(e) Penalties for noncompliance and bond.

(1) In addition to any fine or penalty, any person or entity violating any of the

provisions of this article shall reimburse the county for any and all expenses

incurred by the county in correcting the violator's work, whether by repair or

replacement as determined by the public works department, and performing any work the violator failed to perform in full compliance with this section. Payment

for any such expenses shall be due within 30 days of the date the public works

department mails or hand delivers an invoice for said expenses to the violator's last known address.

(2) With the exception of Crisp County, Georgia, and any public utility companies, an applicant shall furnish an indemnity

bond in the amount of $5,000.00 conditioned to pay any damages to any part of the county's road system or to any member of the public caused by work

performed under authority of a permit issued pursuant to this section. The bond shall be a cash bond or a bond of a

reputable surety acceptable to the public works department. Failure to comply

with any of the requirements of this section shall result in forfeiture of the permittee's bond in the amount necessary to correct the violator's work, whether by repair or replacement as determined

by the public works department, and to perform any work the violator failed to perform in full compliance with this section.

(3) In addition to forfeiture of any bond, any person or entity violating any of the

provisions of this article shall, upon conviction, be punished as provided in section 1-11.

(4) Nothing in this section shall alter the county's right pursuant to O.C.G.A. § 32- 4-42(6), as amended from time to time, to order the removal or discontinuance of

any utility, equipment, or other items installed pursuant to this section at the sole expense of the owner of said items.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 1-19-16, § 2)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:sumter-county/code/70-34@2026-03-17-61f7f6b232

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.