Ir al contenido
Georgia Commons
Menú

Sumter County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 70 - UTILITIES / Article III - STANDARDS FOR WIRELESS COMMUNICATION FACILITIES

Sec. 70-41. Approval process.

Sobre este texto

  • As published by Municode, current through 2026-03-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Uses subject to administrative approval.

Subject to certification by the planning director of compliance with the general requirements, development requirements and standards enumerated above, the following uses may be administratively

approved within 30 days of receiving application, supporting engineering certification and lease approval, if any, without the necessity of public hearing.

(1) Antennas or towers located on property owned, leased or otherwise controlled by the county provided accessory structures are located underground where technically feasible and a license, permit or lease authorizing such tower is thereafter

approved by the county.

(2) Installing an antenna on an existing structure, so long as said installation is considered to be a stealth technology installation that does not significantly change the profile of the existing structure and so

that the installation is not readily noticeable to the untrained eye. Such installations including cables leading to the antennas shall be painted to match the paint and colors on the existing structure

and shall not protrude from the existing structure in a noticeable fashion.

(3) Co-location by installing an antenna on any existing tower or alternative tower structure.

(4) Replacing an existing tower with a new tower designed to accommodate two or more users so long as such new tower does not exceed the height limitations of subsection 70-40(f) and setback requirements of this article are met. After the replacement tower is built only one tower shall remain on such site. Support equipment

shall, where technically feasible, be located underground.

(5) Locating any alternative tower structures (man-made trees, clock towers, bell steeples, or light poles that, based on staff determination, effectively camouflage or

conceal towers and antennas) provided accessory structures are located underground where technically feasible or otherwise incorporated into the alternative structure.

(6) Installing any antenna or tower not to exceed the limitations contained in subsection 70-40(f) and provided accessory structures are located underground where

technically feasible or shielded to the satisfaction of the planning director or his/ her designee.

If the planning director or his/her designee determine that any application for an administratively approved use does not

meet the general application requirements, development requirements and/or standards enumerated herein, administrative approval of the application shall be denied provided substantial evidence

exists to support such denial. Such evidence shall be summarized for the applicant along with a recommendation as to whether the applicant should pursue a

variance or proceed to a public hearing as specified in subsection (b) below. Applicants may appeal the administrative denial to the county board of commissioners pursuant to the procedures described in

Section of Appendix A ("Zoning") of Sumter County Ordinances.

Any other party aggrieved by the decision of the planning director or his/her designee may file an appeal to the board of commissioners including payment of the

filing fee. For purposes of this section an aggrieved party is one who demonstrates that his or her property will suffer special damage as a result of the decision complained of rather than merely some damage that is common to all property owners and citizens similarly situated.

The board of commissioners shall dispense with the appeal by either:

(7) A determination that the application is valid and meets all applicable criteria for an administratively approved use under this article, which shall result in the issuance of a permit.

(8) A determination that the application does not satisfy all applicable criteria for an approved administratively use under this article, but, owing to special conditions, a variance as to separation or setback requirements:

a. Will not be contrary to the public interest;

b. Will relieve unnecessary hardship;

and

c. Shall preserve the intent and spirit of this article.

(9) A determination that the application does not satisfy all applicable criteria for an administratively approved use under this article and the deficiencies cannot, subject to the conditions listed above, properly be cured by a variance.

Applications which do not satisfy all applicable criteria must, as a result, apply for a public hearing before the board of

commissioners as specified in subsection

(b) below.

(b) Other uses—Public hearing required.

(1) If the proposed tower or antenna is not included under the above described administratively approved uses, or the application does not on its face satisfy the development standards and other criteria

specified herein, then a public hearing before the board of commissioners shall be required for the approval of the construction of a wireless transmission facility in all zoning districts. Applicants shall apply for a public hearing through the

planning and zoning department and pay the required fee at such time. Applications, when complete, shall be placed on the next available agenda of the board of

commissioners. At least 30 days prior to any scheduled hearing, the planning and zoning department shall cause a sign to be posted on the property and the publication of a public notice in a newspaper of general circulation. Said notice shall state

the nature of the application, street location of the proposal and height of the proposed structure.

(2) Before approving an application for an "other use," the governing authority may impose conditions to the extent necessary to buffer or otherwise minimize any adverse effect of the proposed tower on adjoining properties. The factors considered in granting such a permit include those

enumerated in sections 70-39 and 70-40.

The board of commissioners may waive or reduce the burden on the applicant of one or more of these criteria, if, in their discretion doing so will advance the goals of this article as stated in section 70-36.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 10-18-05)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:sumter-county/code/70-41@2026-03-17-a4ddfa9662

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Sumter County Code of Ordinances, Sec. 70-41. Approval process | Georgia Commons